ENTERGY LOUISIANA, LLC Form 10-Q filing Q2 FY2025

Filed
Aug 1, 2025
Fiscal quarter
Q2 FY2025
Calendar quarter
Q2 2025
Accession
0000065984-25-000087

Page Number

Consolidated Statements of Comprehensive Income 23

Consolidated Statements of Cash Flows 24

Consolidated Balance Sheets 26

Consolidated Statements of Changes in Equity 28

Notes to Financial Statements

Note 1. Commitments and Contingencies 30

Note 2. Rate and Regulatory Matters 31

Note 3. Equity 40

Note 4. Revolving Credit Facilities, Lines of Credit, Short-term Borrowings, and Long-term Debt 46

Note 5. Stock-based Compensation 51

Note 6. Retirement and Other Postretirement Benefits 52

Note 7. Business Segment Information 59

Note 8. Risk Management and Fair Values 62

Note 9. Decommissioning Trust Funds 75

Note 10. Income Taxes 81

Note 11. Variable Interest Entities 82

Note 12. Revenue 83

Note 13. Held for Sale and Dispositions 86

Item 3. Quantitative and Qualitative Disclosures About Market Risk 89

Item 4. Controls and Procedures 89

Entergy Arkansas, LLC and Subsidiaries

Management’s Financial Discussion and Analysis 90

Consolidated Income Statements 100

Consolidated Statements of Cash Flows 101

Consolidated Balance Sheets 102

Consolidated Statements of Changes in Equity 104

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis 105

Consolidated Income Statements 119

Consolidated Statements of Comprehensive Income 120

Consolidated Statements of Cash Flows 121

Consolidated Balance Sheets 122

Consolidated Statements of Changes in Equity 124

Entergy Mississippi, LLC and SubsidiariesPage Number
Management’s Financial Discussion and Analysis125
Consolidated Income Statements133
Consolidated Statements of Cash Flows135
Consolidated Balance Sheets136
Consolidated Statements of Changes in Equity138
Entergy New Orleans, LLC and Subsidiaries
Management’s Financial Discussion and Analysis139
Consolidated Statements of Operations147
Consolidated Statements of Cash Flows149
Consolidated Balance Sheets150
Consolidated Statements of Changes in Member’s Equity152
Entergy Texas, Inc. and Subsidiaries
Management’s Financial Discussion and Analysis153
Consolidated Income Statements163
Consolidated Statements of Cash Flows165
Consolidated Balance Sheets166
Consolidated Statements of Changes in Equity168
System Energy Resources, Inc.
Management’s Financial Discussion and Analysis169
Income Statements174
Statements of Cash Flows175
Balance Sheets176
Statements of Changes in Common Equity178
Part II. Other Information
Item 1. Legal Proceedings179
Item 1A. Risk Factors179
Item 2. Unregistered Sales of Equity Securities and Use of Proceeds179
Item 5. Other Information180

Item 6. Exhibits 183 Signature 185

DEFINITIONS

Certain abbreviations or acronyms used in the text and notes are defined below:

Abbreviation or Acronym Term

AFUDC Allowance for Funds Used During Construction

ALJ Administrative Law Judge

ANO 1 and 2 Units 1 and 2 of Arkansas Nuclear One (nuclear), owned by Entergy Arkansas

APSC Arkansas Public Service Commission

Board Board of Directors of Entergy Corporation

Cajun Cajun Electric Power Cooperative, Inc.

capacity factor Actual plant output divided by maximum potential plant output for the period

City Council Council of the City of New Orleans, Louisiana

COVID-19 The novel coronavirus disease declared a pandemic by the World Health Organization and the Centers for Disease Control and Prevention in March 2020

D.C. Circuit U.S. Court of Appeals for the District of Columbia Circuit

DOE United States Department of Energy

Entergy Entergy Corporation and its direct and indirect subsidiaries

Entergy Corporation Entergy Corporation, a Delaware corporation

Entergy Gulf States, Inc. Predecessor company for financial reporting purposes to Entergy Gulf States Louisiana that included the assets and business operations of both Entergy Gulf States Louisiana and Entergy Texas

Entergy Gulf States Louisiana Entergy Gulf States Louisiana, L.L.C., a Louisiana limited liability company formally created as part of the jurisdictional separation of Entergy Gulf States, Inc. and the successor company to Entergy Gulf States, Inc. for financial reporting purposes. The term is also used to refer to the Louisiana jurisdictional business of Entergy Gulf States, Inc., as the context requires. Effective October 1, 2015, the business of Entergy Gulf States Louisiana was combined with Entergy Louisiana.

Entergy Louisiana Entergy Louisiana, LLC, a Texas limited liability company formally created as part of the combination of Entergy Gulf States Louisiana and the company formerly known as Entergy Louisiana, LLC (Old Entergy Louisiana) into a single public utility company and the successor to Old Entergy Louisiana for financial reporting purposes

Entergy Texas Entergy Texas, Inc., a Texas corporation formally created as part of the jurisdictional separation of Entergy Gulf States, Inc. The term is also used to refer to the Texas jurisdictional business of Entergy Gulf States, Inc., as the context requires.

Entergy Wholesale Commodities Prior to January 1, 2023, one of Entergy’s reportable business segments consisting of non-utility business activities primarily comprised of the ownership, operation, and decommissioning of nuclear power plants, the ownership of interests in non-nuclear power plants, and the sale of the electric power produced by its operating power plants to wholesale customers

EPA United States Environmental Protection Agency

FERC Federal Energy Regulatory Commission

Form 10-K Annual Report on Form 10-K for the calendar year ended December 31, 2024, filed with the SEC by Entergy Corporation and its Registrant Subsidiaries

GAAP Generally Accepted Accounting Principles

Grand Gulf Unit No. 1 of Grand Gulf Nuclear Station (nuclear), 90% owned or leased by System Energy

GWh Gigawatt-hour(s), which equals one million kilowatt-hours

IRS Internal Revenue Service

ISO Independent System Operator

kV Kilovolt

DEFINITIONS (Concluded)

Abbreviation or Acronym Term

kW Kilowatt, which equals one thousand watts

kWh Kilowatt-hour(s)

LPSC Louisiana Public Service Commission

LURC Louisiana Utilities Restoration Corporation

MISO Midcontinent Independent System Operator, Inc., a regional transmission organization

MMBtu One million British Thermal Units

MPSC Mississippi Public Service Commission

MW Megawatt(s), which equals one thousand kilowatts

MWh Megawatt-hour(s)

Nelson Unit 6 Unit No. 6 (coal) of the Nelson Steam Electric Generating Station, 70% of which is co-owned by Entergy Louisiana (57.5%) and Entergy Texas (42.5%) and 10.9% of which is owned by EAM Nelson Holding, LLC

Net debt to net capital ratio Gross debt less cash and cash equivalents divided by total capitalization less cash and cash equivalents, which is a non-GAAP measure

NRC Nuclear Regulatory Commission

Palisades Palisades Nuclear Plant (nuclear), previously owned as part of Entergy’s non-utility business, which ceased power production in May 2022 and was sold in June 2022

Parent & Other The portions of Entergy not included in the Utility segment, primarily consisting of the activities of the parent company, Entergy Corporation, and other business activity, including Entergy’s non-utility operations business which owns interests in non-nuclear power plants that sell the electric power produced by those plants to wholesale customers and also provides decommissioning services to nuclear power plants owned by non-affiliated entities in the United States

PPA Purchased power agreement or power purchase agreement

PUCT Public Utility Commission of Texas

Registrant Subsidiaries Entergy Arkansas, LLC, Entergy Louisiana, LLC, Entergy Mississippi, LLC, Entergy New Orleans, LLC, Entergy Texas, Inc., and System Energy Resources, Inc.

River Bend River Bend Station (nuclear), owned by Entergy Louisiana

SEC Securities and Exchange Commission

System Agreement Agreement, effective January 1, 1983, as modified, among the Utility operating companies relating to the sharing of generating capacity and other power resources. The agreement terminated effective August 2016.

System Energy System Energy Resources, Inc.

Unit Power Sales Agreement Agreement, dated as of June 10, 1982, as amended and approved by the FERC, among Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and System Energy, relating to the sale of capacity and energy from System Energy’s share of Grand Gulf

Utility Entergy’s reportable segment that generates, transmits, distributes, and sells electric power, with a small amount of natural gas distribution in portions of Louisiana

Utility operating companies Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas

Waterford 3 Unit No. 3 (nuclear) of the Waterford Steam Electric Station, owned by Entergy Louisiana

weather-adjusted usage Electric usage excluding the effects of deviations from normal weather

White Bluff White Bluff Steam Electric Generating Station, 57% owned by Entergy Arkansas

ENTERGY CORPORATION AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Entergy operates primarily through a single reportable segment, Utility. The Utility segment includes the generation, transmission, distribution, and sale of electric power in portions of Arkansas, Mississippi, Texas, and Louisiana, including the City of New Orleans; and operation of a small natural gas distribution business in portions of Louisiana through June 30, 2025. See Note 13 to the financial statements herein and the “Held for Sale - Natural Gas Distribution Businesses” section in Note 14 to the financial statements in the Form 10-K for discussion of the sale of the Entergy New Orleans and Entergy Louisiana natural gas distribution businesses on July 1, 2025. See Note 7 to the financial statements herein for discussion of and financial information regarding Entergy’s reportable segment.

Results of Operations

Second Quarter 2025 Compared to Second Quarter 2024

Following are income statement variances for Utility, Parent & Other, and Entergy comparing the second quarter 2025 to the second quarter 2024 showing how much the line item increased or (decreased) in comparison to the prior period.

In Thousands

View SEC source
Line itemUtilityParent &Other (a)Entergy
2024 Net Income (Loss) Attributable to Entergy Corporation$441,008($392,086)$48,922
Operating revenues374,319910375,229
Fuel, fuel-related expenses, and gas purchased for resale117,550(3,826)113,724
Purchased power179,832(4,432)175,400
Other regulatory charges (credits) - net(181,564)(181,564)
Other operation and maintenance27,306(4,618)22,688
Taxes other than income taxes14,07118314,254
Depreciation and amortization17,11410617,220
Other income (deductions)27,831309,858337,689
Interest expense35,522(3,025)32,497
Other expenses(6,354)66(6,288)
Income taxes39,81964,946104,765
Preferred dividend requirements of subsidiaries and noncontrolling interests1,2141,214
2025 Net Income (Loss) Attributable to Entergy Corporation$598,648($130,718)$467,930

(a)Parent & Other includes eliminations, which are primarily intersegment activity.

Second quarter 2024 results of operations include: (1) a $317 million ($250 million net-of-tax) settlement charge, reflected in Parent & Other above, recognized as a result of a group annuity contract purchased in May 2024 to settle certain pension liabilities; and (2) expenses of $151 million ($112 million net-of-tax), recorded at Utility in second quarter 2024, primarily consisting of regulatory charges to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023. See Note 11 to the financial statements in the Form 10-K for discussion of the group annuity contract

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

and settlement charge. See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Louisiana agreement in principle and the subsequently filed global stipulated settlement agreement.

Operating Revenues

Utility

Following is an analysis of the change in operating revenues comparing the second quarter 2025 to the second quarter 2024:

In Millions

View SEC source
Line itemAmount
2024 operating revenues$2,941
Fuel, rider, and other revenues that do not significantly affect net income297
Retail electric price60
Volume/weather18
2025 operating revenues$3,316

The Utility operating companies’ results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to:

  • an increase in Entergy Arkansas’s formula rate plan rates effective January 2025;
  • an increase in Entergy Louisiana’s formula rate plan revenues, including an increase in the distribution recovery mechanism, effective September 2024;
  • an increase in Entergy Mississippi’s formula rate plan rates effective July 2024 and an increase in the interim facilities rate adjustment revenues effective January 2025; and
  • the implementation of the distribution cost recovery factor rider effective with the first billing cycle in October 2024 and an increase in the distribution cost recovery factor rider effective in late December 2024, each at Entergy Texas.

See Note 2 to the financial statements herein and in the Form 10-K for discussion of the regulatory proceedings discussed above.

The volume/weather variance is primarily due to an increase in weather-adjusted residential usage and an increase in industrial usage, partially offset by the effect of less favorable weather on residential sales. The increase in weather-adjusted residential usage is primarily due to an increase in customers. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the primary metals, chlor-alkali, and technology industries. The increased usage from these industrial customers has a relatively smaller effect on operating revenues because a larger portion of the revenues from these customers comes from fixed charges.

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

Total electric energy sales for Utility for the three months ended June 30, 2025 and 2024 are as follows:

Line item20252024% Change
(GWh)
Residential8,8999,557(7)
Commercial7,2657,236
Industrial15,62013,97312
Governmental617626(1)
Total retail32,40131,3923
Sales for resale4,1333,05235
Total36,53434,4446

See Note 12 to the financial statements herein for additional discussion of operating revenues.

Other Income Statement Items

Utility

Purchased power includes an increase in second quarter 2025 of $20 million in costs, at Entergy Texas, related to the procurement of capacity through MISO’s annual planning resource auction, including the effect of a significant increase in MISO’s seasonal auction clearing price, due to the implementation of a reliability-based demand curve, for capacity transactions during the summer months. Although Entergy Texas does not have the ability to recover its MISO capacity costs incurred to date beyond the level included in base rates, in June 2025, Texas legislation established a capacity cost recovery rider mechanism that would allow for the recovery of costs related to the procurement of capacity through MISO’s annual planning resource auction outside of base rates, through a rider that is updated annually. Entergy Texas plans to file for such a rider to recover future capacity procurement costs at the earliest opportunity in 2026.

Other operation and maintenance expenses increased from $686 million for the second quarter 2024 to $713 million for the second quarter 2025 primarily due to:

  • an increase of $12 million in non-nuclear generation expenses primarily due to a higher scope of work performed during plant outages in 2025 as compared to 2024;
  • an increase of $10 million in power delivery expenses primarily due to higher vegetation maintenance costs;
  • an increase of $9 million in bad debt expense;
  • an increase of $5 million in storm damage provisions; and
  • several individually insignificant items.

The increase was partially offset by contract costs of $12 million, in second quarter 2024, related to operational performance, customer service, and organizational health initiatives and a decrease of $7 million in nuclear generation expenses primarily due to a lower scope of work performed in 2025 as compared to 2024.

Depreciation and amortization expenses increased primarily due to additions to plant in service and an increase in nuclear depreciation rates at Entergy Louisiana effective September 2024 in accordance with the global stipulated settlement agreement approved by the LPSC in August 2024. The increase was partially offset by the recognition of $14 million in depreciation expense in second quarter 2024 at Entergy Texas for the 2022 base rate case relate back period, effective over six months beginning January 2024. The recognition of depreciation expense for the relate back period was effective over the same period as collections from the relate back surcharge rider and resulted in no effect on net income. See Note 2 to the financial statements in the Form 10-K for discussion of the

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

Entergy Louisiana global stipulated settlement agreement. See Note 2 to the financial statements in the Form 10-K for discussion of the 2022 base rate case at Entergy Texas.

Other regulatory charges (credits) - net includes regulatory charges of $150 million, recorded by Entergy Louisiana in second quarter 2024, to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023. See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Louisiana agreement in principle and the subsequently filed global stipulated settlement agreement. In addition, Entergy records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

Other income increased primarily due to:

  • an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2025, including the Orange County Advanced Power Station project and the Legend Power Station project, each at Entergy Texas;
  • a $17 million true-up of Entergy Louisiana’s MISO cost recovery mechanism over-recovery balance to the 2024 formula rate plan filing, which was filed with the LPSC in May 2025. See Note 2 to the financial statements herein for discussion of the 2024 formula rate plan filing; and
  • an increase of $9 million in the amortization of tax gross ups on customer advances for construction.

The increase was partially offset by changes in decommissioning trust fund activity, including portfolio rebalancing of decommissioning trust funds in second quarter 2024.

Interest expense increased primarily due to:

  • the issuance by Entergy Louisiana of $700 million of 5.15% Series mortgage bonds in August 2024;
  • the issuance by Entergy Louisiana of $750 million of 5.80% Series mortgage bonds in January 2025;
  • the issuance by Entergy Mississippi of $600 million of 5.80% Series mortgage bonds in March 2025;
  • the issuance by Entergy Texas of $500 million of 5.25% Series mortgage bonds in February 2025; and
  • carrying costs of $10 million in 2025 on customer advances for construction.

The increase was partially offset by an increase in the allowance for borrowed funds used during construction due to higher construction work in progress in 2025, including the Orange County Advanced Power Station project and the Legend Power Station project, each at Entergy Texas.

Parent and Other

Other income (deductions) increased primarily due to a $317 million ($250 million net-of-tax) non-cash settlement charge recognized in second quarter 2024 as a result of a group annuity contract purchased in May 2024 to settle certain pension liabilities. See Note 11 to the financial statements in the Form 10-K for discussion of the group annuity contract and settlement charge.

Income Taxes

The effective income tax rate was 22.7% for the second quarter 2025. The difference in the effective income tax rate for the second quarter 2025 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes, partially offset by book and tax differences related to the allowance for equity funds used during construction and certain book and tax differences related to utility plant items.

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

The effective income tax rate was 39.4% for the second quarter 2024. The difference in the effective income tax rate for the second quarter 2024 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes, a provision for uncertain tax positions, and the amortization of accumulated deferred income taxes as a result of tax rate changes, partially offset by certain book and tax differences related to utility plant items and book and tax differences related to the allowance for equity funds used during construction.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Following are income statement variances for Utility, Parent & Other, and Entergy comparing the six months ended June 30, 2025 to the six months ended June 30, 2024 showing how much the line item increased or (decreased) in comparison to the prior period.

In Thousands

View SEC source
Line itemUtilityParent &Other (a)Entergy
2024 Net Income (Loss) Attributable to Entergy Corporation$636,232($512,029)$124,203
Operating revenues431,743(4,268)427,475
Fuel, fuel-related expenses, and gas purchased for resale(147,871)(10,499)(158,370)
Purchased power302,722(9,718)293,004
Other regulatory charges (credits) - net(307,754)(307,754)
Other operation and maintenance9,065(741)8,324
Asset write-offs, impairments, and related charges(131,775)(131,775)
Taxes other than income taxes20,43415620,590
Depreciation and amortization30,32817430,502
Other income (deductions)(1,722)304,815303,093
Interest expense90,5054,58395,088
Other expenses(9,093)131(8,962)
Income taxes119,54464,269183,813
Preferred dividend requirements of subsidiaries and noncontrolling interests1,6211,621
2025 Net Income (Loss) Attributable to Entergy Corporation$1,088,527($259,837)$828,690

(a)Parent & Other includes eliminations, which are primarily intersegment activity.

Results of operations for the six months ended June 30, 2024 include: (1) a $317 million ($250 million net-of-tax) settlement charge, reflected in Parent & Other above, recognized as a result of a group annuity contract purchased in May 2024 to settle certain pension liabilities; (2) expenses of $151 million ($112 million net-of-tax), recorded at Utility in second quarter 2024, primarily consisting of regulatory charges to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023; (3) a $132 million ($97 million net-of-tax) charge, recorded at Utility, to reflect the write-off of a previously recorded regulatory asset as a result of an adverse decision in the Entergy Arkansas opportunity sales proceeding in March 2024; and (4) a $78 million ($57 million net-of-tax) regulatory charge, recorded at Utility in first quarter 2024, primarily to reflect a settlement in principle between Entergy New Orleans and the City Council in April 2024 for additional sharing with customers of income tax benefits from the resolution of the 2016-2018 IRS audit. See Note 11 to the financial statements in the Form 10-K for discussion of the group annuity contract and settlement charge. See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Louisiana agreement in principle and the subsequently filed global stipulated settlement agreement. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the Entergy

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

Arkansas opportunity sales proceeding. See Note 3 to the financial statements in the Form 10-K for discussion of the April 2024 settlement in principle and the resolution of the 2016-2018 IRS audit.

Operating Revenues

Utility

Following is an analysis of the change in operating revenues comparing the six months ended June 30, 2025 to the six months ended June 30, 2024:

In Millions

View SEC source
Line itemAmount
2024 operating revenues$5,714
Fuel, rider, and other revenues that do not significantly affect net income159
Retail electric price140
Volume/weather132
2025 operating revenues$6,145

The Utility operating companies’ results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to:

  • an increase in Entergy Arkansas’s formula rate plan rates effective January 2025;
  • an increase in Entergy Louisiana’s formula rate plan revenues, including an increase in the distribution recovery mechanism, effective September 2024;
  • increases in Entergy Mississippi’s formula rate plan rates effective April 2024 and July 2024 and an increase in the interim facilities rate adjustment revenues effective January 2025; and
  • the implementation of the distribution cost recovery factor rider effective with the first billing cycle in October 2024 and an increase in the distribution cost recovery factor rider effective in late December 2024, each at Entergy Texas.

See Note 2 to the financial statements herein and in the Form 10-K for discussion of the regulatory proceedings discussed above.

The volume/weather variance is primarily due to an increase in industrial usage and the effect of more favorable weather on residential sales. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the petroleum refining, chlor-alkali, primary metals, and technology industries.

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

Total electric energy sales for Utility for the six months ended June 30, 2025 and 2024 are as follows:

Line item20252024% Change
(GWh)
Residential17,68317,3152
Commercial13,50713,460
Industrial29,45226,63311
Governmental1,1761,198(2)
Total retail61,81858,6065
Sales for resale5,7677,010(18)
Total67,58565,6163

See Note 12 to the financial statements herein for additional discussion of operating revenues.

Other Income Statement Items

Utility

Purchased power includes an increase in 2025 of $21 million in costs, at Entergy Texas, related to the procurement of capacity through MISO’s annual planning resource auction, including the effect of a significant increase in MISO’s seasonal auction clearing price, due to the implementation of a reliability-based demand curve, for capacity transactions during the summer months. Although Entergy Texas does not have the ability to recover its MISO capacity costs incurred to date beyond the level included in base rates, in June 2025, Texas legislation established a capacity cost recovery rider mechanism that would allow for the recovery of costs related to the procurement of capacity through MISO’s annual planning resource auction outside of base rates, through a rider that is updated annually. Entergy Texas plans to file for such a rider to recover future capacity procurement costs at the earliest opportunity in 2026.

Other operation and maintenance expenses increased from $1,367 million for the six months ended June 30, 2024 to $1,376 million for the six months ended June 30, 2025 primarily due to:

  • an increase of $13 million in non-nuclear generation expenses primarily due to a higher scope of work performed during plant outages in 2025 as compared to 2024;
  • an increase of $12 million in bad debt expense;
  • an increase of $9 million in loss provisions;
  • an increase of $9 million in transmission costs allocated by MISO. See Note 2 to the financial statements in the Form 10-K for discussion of the recovery of these costs;
  • an increase of $8 million in storm damage provisions; and
  • an increase of $8 million in power delivery expenses primarily due to higher vegetation maintenance costs.

The increase was partially offset by:

  • contract costs of $24 million in 2024 related to operational performance, customer service, and organizational health initiatives;
  • a decrease of $12 million in nuclear generation expenses primarily due to a lower scope of work performed in 2025 as compared to 2024; and
  • a decrease of $7 million in compensation and benefits costs primarily due to a higher revision to estimated incentive-based compensation expense in 2025 as compared to 2024.

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

Asset write-offs, impairments, and related charges (credits) includes a $132 million charge to reflect the write-off, at Entergy Arkansas, of a previously recorded regulatory asset as a result of an adverse decision in the Entergy Arkansas opportunity sales proceeding in March 2024. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the Entergy Arkansas opportunity sales proceeding.

Depreciation and amortization expenses increased primarily due to additions to plant in service and an increase in nuclear depreciation rates at Entergy Louisiana effective September 2024 in accordance with the global stipulated settlement agreement approved by the LPSC in August 2024. The increase was partially offset by the recognition of $28 million in depreciation expense in 2024 at Entergy Texas for the 2022 base rate case relate back period, effective over six months beginning January 2024. The recognition of depreciation expense for the relate back period was effective over the same period as collections from the relate back surcharge rider and resulted in no effect on net income. See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Louisiana global stipulated settlement agreement. See Note 2 to the financial statements in the Form 10-K for discussion of the 2022 base rate case at Entergy Texas.

Other regulatory charges (credits) - net includes:

  • regulatory charges of $150 million, recorded by Entergy Louisiana in second quarter 2024, to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023. See Note 2 to the financial statements in the Form 10-K for discussion of the Entergy Louisiana agreement in principle and the subsequently filed global stipulated settlement agreement; and
  • a regulatory charge of $78 million, recorded by Entergy New Orleans in first quarter 2024, primarily to reflect a settlement in principle between Entergy New Orleans and the City Council in April 2024 for additional sharing with customers of income tax benefits from the resolution of the 2016-2018 IRS audit. See Note 3 to the financial statements in the Form 10-K for discussion of the April 2024 settlement in principle and for discussion of the resolution of the 2016-2018 IRS audit.

In addition, Entergy records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

Other income decreased slightly primarily due to changes in decommissioning trust fund activity, including portfolio rebalancing of decommissioning trust funds in 2024, and a decrease of $9 million in affiliated dividend income from affiliated preferred membership interests related to storm cost securitization. The decrease was substantially offset by:

  • an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2025, including the Orange County Advanced Power Station project and the Legend Power Station project, each at Entergy Texas;
  • an increase of $24 million in the amortization of tax gross ups on customer advances for construction;
  • a $17 million true-up of Entergy Louisiana’s MISO cost recovery mechanism over-recovery balance to the 2024 formula rate plan filing, which was filed with the LPSC in May 2025. See Note 2 to the financial statements herein for discussion of the 2024 formula rate plan filing; and
  • an increase of $17 million in interest earned on money pool investments.

Interest expense increased primarily due to:

  • the issuances by Entergy Arkansas of $400 million of 5.75% Series mortgage bonds and $400 million of 5.45% Series mortgage bonds, each in May 2024;
  • the issuance by Entergy Louisiana of $700 million of 5.15% Series mortgage bonds in August 2024;

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

  • the issuance by Entergy Louisiana of $750 million of 5.80% Series mortgage bonds in January 2025;
  • the issuance by Entergy Mississippi of $600 million of 5.80% Series mortgage bonds in March 2025;
  • the issuance by Entergy Texas of $350 million of 5.55% Series mortgage bonds in August 2024;
  • the issuance by Entergy Texas of $500 million of 5.25% Series mortgage bonds in February 2025;
  • the issuance by System Energy of $300 million of 5.30% Series mortgage bonds in December 2024; and
  • carrying costs of $22 million in 2025 on customer advances for construction.

The increase was partially offset by an increase in the allowance for borrowed funds used during construction due to higher construction work in progress in 2025, including the Orange County Advanced Power Station project and the Legend Power Station project, each at Entergy Texas.

Parent and Other

Other income (deductions) increased primarily due to a $317 million ($250 million net-of-tax) non-cash settlement charge recognized in second quarter 2024 as a result of a group annuity contract purchased in May 2024 to settle certain pension liabilities. See Note 11 to the financial statements in the Form 10-K for discussion of the group annuity contract and settlement charge.

Income Taxes

The effective income tax rate was 22.2% for the six months ended June 30, 2025. The difference in the effective income tax rate for the six months ended June 30, 2025 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes, partially offset by book and tax differences related to the allowance for equity funds used during construction and certain book and tax differences related to utility plant items.

The effective income tax rate was 29.9% for the six months ended June 30, 2024. The difference in the effective income tax rate for the six months ended June 30, 2024 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes, the amortization of accumulated deferred income taxes as a result of tax rate changes, and a provision for uncertain tax positions, partially offset by certain book and tax differences related to utility plant items and book and tax differences related to the allowance for equity funds used during construction.

Income Tax Legislation and Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Income Tax Legislation and Regulation” in the Form 10-K for discussion of income tax legislation and regulation. The following is an update to that discussion. See Note 10 to the financial statements herein for discussion of the nuclear production tax credits recorded in second quarter 2025.

One Big Beautiful Bill Act of 2025

On July 4, 2025, the One Big Beautiful Bill Act (OBBBA) was enacted. The OBBBA is a wide ranging update to U.S. tax and spending policy. In particular, the OBBBA modified and extended various clean energy tax incentives relevant to electric utilities, preserving production tax credits under Internal Revenue Code section 45U for existing nuclear facilities through 2032 and generally maintaining the current law phase-out schedule for new nuclear and battery storage under Internal Revenue Code sections 45Y (clean electricity production credit) or Internal Revenue Code section 48E (clean electricity investment credit). In addition, the OBBBA preserved the tax credits for carbon capture and sequestration facilities that meet the requirements of Internal Revenue Code section 45Q. In contrast, the OBBBA significantly shortened the time period for solar and wind facilities to claim clean energy tax incentives. In general, solar and wind facilities must be placed in service by December 31, 2027 to qualify for the tax credits, unless construction begins by July 3, 2026, and certain safe harbor requirements are met.

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

On July 7, 2025, an executive order was issued directing the U.S. Treasury to issue, among other things, new safe harbor guidance, particularly with respect to wind and solar facilities. Any new guidance could impact Entergy’s capital planning and expectations with respect to its planned solar and battery facilities.

In addition, the OBBBA adopted new foreign entity of concern (FEOC) rules designed to deny clean energy tax incentives to all clean energy projects beginning construction after December 31, 2025 that use equipment beyond statutory guidelines from prohibited foreign entities (entities with ties to China, Russia, Iran, or North Korea). The FEOC rules also deny these incentives to taxpayers that rely beyond certain thresholds on equity or debt from prohibited foreign entities or that make payments to prohibited foreign entity counterparties under contracts or licensing agreements that give such counterparties “effective control” over an eligible project. These taxpayer FEOC rules will apply to taxpayers in their first taxable year following enactment of the OBBBA. The July 7, 2025, executive order also instructed the U.S. Treasury to issue guidance on these new FEOC requirements.

The OBBBA also retained full transferability of all credits and preserved five-year Modified Accelerated Cost Recovery System treatment for eligible Internal Revenue Code section 45Y and 48E assets.

The changes in law and federal energy policy reflected in the OBBBA could have a material effect on Entergy’s current and future resource planning, including particularly solar and wind resources, and on its results of operations, cash flows, or financial condition. Entergy may not be able to realize the anticipated benefits of federal tax credits for certain of its planned solar and battery facilities to the extent that these projects do not meet the safe harbor requirements set forth in the OBBBA. In addition, as the changes reflected in the OBBBA and anticipated related guidance disfavor certain renewable resource development as compared to prior law, Entergy may not be successful in achieving current or future carbon emission goals. Provisions of the OBBBA may also affect customer decisions relating to major new projects in Entergy’s service area, to the extent that project economics or the achievement of customer sustainability objectives are affected by the changes in the OBBBA.

Entergy Wholesale Commodities Exit from the Merchant Power Business

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Entergy Wholesale Commodities Exit from the Merchant Power Business” in the Form 10-K for discussion of the exit from the merchant power business.

Liquidity and Capital Resources

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy’s capital structure, capital spending plans and other uses of capital, and sources of capital. The following are updates to that discussion.

Recent announcements of changes to international trade policy and tariffs and further similar changes may impact Entergy’s business, operations, results of operations, and liquidity and capital resources. Potential impacts may include increases in costs associated with Entergy’s capital investments or operation and maintenance expenses; operational impacts, such as supply chain, manufacturing, or raw materials sourcing disruptions which may affect Entergy’s ability to make planned capital investments as and when expected and needed; legal uncertainties, such as potential legal or other challenges to presidential tariff authority; or broader economic risks, including shifting customer demand, impacts on customer investment decisions, and volatile or uncertain credit and capital markets, which may affect Entergy’s ability to access needed capital. The nature and extent of any such effects will depend on, among other things, the specifics of the changes that are ultimately implemented both domestically and internationally, the responses of vendors, suppliers, and other counterparties to those changes, indirect effects on the price and availability of non-tariffed goods, and the effectiveness of mitigation measures.

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

Capital Structure and Resources

Entergy’s debt to capital ratio is shown in the following table.

Line itemJune 30,2025December 31, 2024
Debt to capital64.9%65.3%
Effect of excluding securitization bonds(0.2%)(0.2%)
Debt to capital, excluding securitization bonds (non-GAAP) (a)64.7%65.1%
Effect of subtracting cash(0.9%)(0.7%)
Net debt to net capital, excluding securitization bonds (non-GAAP) (a)63.8%64.4%

(a)Calculation excludes the Texas securitization bonds, which are non-recourse to Entergy Texas.

As of June 30, 2025, 18.6% of the debt outstanding is at the parent company, Entergy Corporation, and 81.4% is at the Utility segment. Net debt consists of debt less cash and cash equivalents. Debt consists of notes payable and commercial paper, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt, equity, and subsidiaries’ preferred stock without sinking fund. Net capital consists of capital less cash and cash equivalents. The debt to capital ratio excluding securitization bonds and net debt to net capital ratio excluding securitization bonds are non-GAAP measures. Entergy uses the debt to capital ratios excluding securitization bonds in analyzing its financial condition and believes they provide useful information to its investors and creditors in evaluating Entergy’s financial condition because the securitization bonds are non-recourse to Entergy, as more fully described in Note 5 to the financial statements in the Form 10-K. Entergy also uses the net debt to net capital ratio excluding securitization bonds in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy’s financial condition because net debt indicates Entergy’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Entergy Corporation has in place a credit facility that has a borrowing capacity of $3 billion and expires in June 2030. The facility includes fronting commitments for the issuance of letters of credit against $20 million of the total borrowing capacity of the credit facility. The commitment fee is currently 0.225% of the undrawn commitment amount. Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation. As there were no borrowings under the facility for the six months ended June 30, 2025, the estimated interest rate as of June 30, 2025 that would have been applied to outstanding borrowings under the facility was 5.93%. The following is a summary of the amounts outstanding and capacity available under the credit facility as of June 30, 2025:

In Millions

View SEC source
CapacityBorrowingsLettersof CreditCapacity Available
$3,000$—$4$2,996

Entergy Corporation’s credit facility includes a covenant requiring Entergy to maintain a consolidated debt ratio, as defined, of 65% or less of its total capitalization. The calculation of this debt ratio under Entergy Corporation’s credit facility is different than the calculation of the debt to capital ratio above. Entergy is currently in compliance with the covenant and expects to remain in compliance with this covenant. If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Registrant Subsidiaries (except Entergy New Orleans and System Energy) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the Entergy Corporation credit facility’s maturity date may occur. See Note 4 to the financial statements herein for additional discussion of the Entergy Corporation credit facility and discussion of the Registrant Subsidiaries’ credit facilities.

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

Entergy Corporation has a commercial paper program with a Board-approved program limit of $2 billion. As of June 30, 2025, Entergy Corporation had $459 million of commercial paper outstanding. The weighted-average interest rate for the six months ended June 30, 2025 was 4.65%.

Equity Issuances and Equity Distribution Program

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources - Sources of Capital - Equity Issuances and Equity Distribution Program” in the Form 10-K and Note 3 to the financial statements herein for discussion of equity issuances and the equity distribution program. The following are updates to that discussion.

In March 2025, Entergy marketed an equity offering of 17.8 million shares of Entergy Corporation common stock. In lieu of issuing equity at the time of the offering, Entergy entered into forward sale agreements with several forward counterparties. The forward sale agreements require Entergy to, at its election on or prior to September 30, 2026, either (1) physically settle the transactions by issuing the total of 17.8 million shares of its common stock to the forward counterparties in exchange for net proceeds at the then-applicable forward sale price specified by the agreements (initially $81.87 per share) or (2) net settle the transactions in whole or in part through the delivery or receipt of cash or shares. The forward sale price is subject to adjustment on a daily basis based on a floating interest rate factor and will decrease by other fixed amounts specified in the agreements. See Note 3 to the financial statements herein for further discussion of the forward sale agreements.

In May 2025, Entergy physically settled all of its obligations under certain of its then-outstanding forward sale agreements under its at the market equity distribution program for cash proceeds of $806 million. See Note 3 to the financial statements herein for discussion of the forward sale agreements and common stock issuances and sales under the equity distribution program.

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

Capital Expenditure Plans and Other Uses of Capital

See the table and discussion in the Form 10-K under “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources - Capital Expenditure Plans and Other Uses of Capital,” that sets forth the amounts of Entergy’s planned construction and other capital investments for 2025 through 2027. The following are updates to that discussion.

Following are the current annual amounts of Entergy’s planned construction and other capital investments.

In Millions

View SEC source
Planned construction and capital investments202520262027
Generation$4,310$6,200$5,355
Transmission1,2602,4052,485
Distribution2,2002,4251,965
Utility Support430290265
Total$8,200$11,320$10,070

The updated capital plan for 2025-2027 reflects incremental capital investments for potential generation projects. The capital plan includes amounts Entergy plans to spend on routine capital projects that are necessary to support reliability of its service, equipment, or systems and to support normal customer growth. In addition to routine capital projects, the capital plan also includes amounts Entergy plans to spend on non-routine capital investments for which Entergy is either contractually obligated, has Board approval, or otherwise expects to make to satisfy regulatory or legal requirements. Amounts include the following types of construction and capital investments:

  • investments in generation projects to modernize, decarbonize, expand, and diversify Entergy’s portfolio, as well as to support customer growth, including Lake Catherine Unit 5, Jefferson Power Station, Bayou Power Station, Delta Blues Advanced Power Station, Delta Solar, Penton Solar, Orange County Advanced Power Station, Lone Star Power Station, Segno Solar, Votaw Solar, and potential construction of additional generation;
  • investments in the Utility nuclear fleet;
  • transmission spending to improve reliability and resilience while also supporting renewables expansion and customer growth; and
  • distribution and Utility support spending to improve reliability, resilience, and customer experience through projects focused on asset renewals and enhancements and grid stability.

Renewables

2021 Solar Certification and the Geaux Green Option

As discussed in the Form 10-K, in November 2021, Entergy Louisiana filed an application with the LPSC seeking certification of and approval for the addition of four new solar photovoltaic resources with a combined nameplate capacity of 475 megawatts (the 2021 Solar Portfolio) and the implementation of a new green tariff, the Geaux Green Option (Rider GGO). The 2021 Solar Portfolio consists of four resources which include (i) the Vacherie Facility, a 150 megawatt resource in St. James Parish; (ii) the Sunlight Road Facility, a 50 megawatt resource in Washington Parish; (iii) the St. Jacques Facility, a 150 megawatt resource in St. James Parish; and (iv) the Elizabeth Facility, a 125 megawatt resource in Allen Parish. The St. Jacques Facility would be acquired through a build-own-transfer agreement; the remaining resources involve power purchase agreements. The Sunlight Road Facility and the Elizabeth Facility each achieved commercial operation in 2024, and the Vacherie Facility and the St. Jacques Facility originally had estimated in service dates in 2025.

In August 2022 the parties reached a settlement certifying the 2021 Solar Portfolio and approving implementation of Rider GGO. In September 2022 the LPSC approved the settlement. Following the LPSC

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

approval, the St. James Parish council issued a moratorium on new land use permits for solar facilities until the later of March 2023 or the completion of an environmental and economic impact study. In November 2023, St. James Parish lifted the moratorium and adopted an ordinance modifying the parish’s land use plan to establish solar as an approved land use and defining corresponding solar regulations. In March 2024 the project developer submitted a solar energy facility farm permit application to the St. James Parish planning commission to request approval for the Vacherie and St. Jacques Facilities. In June 2024 the St. James Parish council denied the application and following this denial, the project developer and one of the project’s ground lessors filed separate lawsuits seeking to overturn the council’s decision. The council’s decision was subsequently affirmed by the Louisiana 23rd Judicial District Court. Entergy Louisiana is no longer pursuing the addition of resources through an acquisition of the St. Jacques Facility or through a power purchase agreement with the Vacherie Facility.

Segno Solar and Votaw Solar

As discussed in the Form 10-K, in July 2024, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate the Segno Solar facility, a 170 MW solar facility to be located in Polk County, Texas, and the Votaw Solar facility, a 141 MW solar facility to be located in Hardin County, Texas. In July 2025, Entergy Texas filed, and the ALJs with the State Office of Administrative Hearings granted, an unopposed motion to abate this proceeding to give the parties to the proceeding additional time for settlement discussions.

Other Generation and Transmission

Lake Catherine Unit 5

As discussed in the Form 10-K, in November 2024, Entergy Arkansas filed an application with the APSC seeking a certificate of environmental compatibility and public need for the construction and operation of Lake Catherine Unit 5, a 446 MW hydrogen-capable simple-cycle natural gas combustion turbine facility to be located at the existing Lake Catherine facility site in Hot Spring County, Arkansas. In December 2024 other parties, including the APSC general staff, filed testimony opposing the resource, although the APSC general staff recognized the capacity need for the resource. Entergy Arkansas filed testimony in January 2025 further supporting its application, and in February 2025 the opposing parties filed responsive rebuttal testimony continuing to dispute the estimated costs and to dispute that Entergy Arkansas performed a market solicitation sufficient to demonstrate that this resource is the most reasonable option for customers. Also in February 2025, Entergy Arkansas filed surrebuttal testimony responding to the opposing parties’ testimony. A hearing was held in March 2025, and in April 2025 the APSC issued an order approving certification of the facility. The order also provided a presumption of prudence finding with respect to a benchmark project cost. In May 2025, Entergy Arkansas filed a motion for clarification concerning the appropriate calculation of the benchmark. Entergy Arkansas will have the opportunity to later present all actual costs to the APSC for review and a prudence determination, including costs incremental to the benchmark. The facility is expected to be in service by the end of 2028.

Jefferson Power Station

Entergy Arkansas expects to file an application with the APSC in third quarter 2025 seeking a certificate of environmental compatibility and public need for the construction and operation of Jefferson Power Station, an approximately 754 MW natural gas-fired combined cycle combustion turbine facility. Subject to receipt of required regulatory approval and other conditions, the facility is expected to be in service by the end of 2029.

Entergy Louisiana Additional Generation and Transmission Resources

As discussed in the Form 10-K, in October 2024, Entergy Louisiana filed an application with the LPSC seeking approval of a variety of generation and transmission resources proposed in connection with establishing service to a new data center to be developed by a subsidiary of Meta Platforms, Inc. in north Louisiana, for which an

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

electric service agreement has been executed. The filing requests LPSC certification of three new combined cycle combustion turbine generation resources totaling 2,262 MW, each of which will be enabled for future carbon capture and storage, a new 500 kV transmission line, and 500 kV substation upgrades. The application also requests approval to implement a corporate sustainability rider applicable to the new customer. The corporate sustainability rider contemplates the new customer contributing to the costs of the future addition of 1,500 MW of new solar and energy storage resources, agreements involving carbon capture and storage at Entergy Louisiana’s existing Lake Charles Power Station, and potential future wind and nuclear resources. Entergy Louisiana anticipates funding the incremental cost to serve the customer through direct financial contributions from the customer and the revenues it expects to earn under the electric service agreement. The electric service agreement also contains provisions for termination payments that will help ensure that there is no harm to Entergy Louisiana and its customers in the event of early termination. A directive was issued at the LPSC’s November 2024 meeting for the matter to be decided by October 2025. In February 2025 intervenors filed a motion asking the LPSC to deny Entergy Louisiana’s requested exemption from the LPSC’s order addressing competitive solicitation procedures and further asking the LPSC to dismiss the application. The ALJ issued an order denying the motion to dismiss the application and deferring the LPSC’s consideration of the motion regarding the competitive solicitation procedures until the hearing. In March 2025 the same intervenors filed a motion requesting the LPSC to require the customer and its parent company to be joined as parties to the proceeding or dismiss the application. In April 2025 the ALJ issued an order denying the March 2025 motion, and the moving parties filed a motion asking the LPSC to review and reverse the ALJ’s decision.

In February 2025, Entergy Louisiana filed supplemental testimony with the LPSC stating that the third combined cycle combustion turbine resource presented in the October 2024 application would be sited at Entergy Louisiana’s Waterford site in Killona, Louisiana, alongside existing Entergy Louisiana generation resources. The testimony also notes that Entergy Louisiana is negotiating with the customer in response to the customer’s request to increase the load associated with its project in north Louisiana. The testimony indicates further that the additional load can be served without additional generation capacity beyond what was presented in the October 2024 application, but that additional transmission facilities, which will be funded directly by the customer, are needed to serve this additional load.

In April 2025 and May 2025 the LPSC staff and certain intervenors each filed their direct testimony and cross-answering testimony, respectively. The LPSC staff’s testimony discussed the significant projected benefits associated with the data center project; however, both the LPSC staff and such intervenors also identified purported risks associated with constructing the requested resources based on the terms and conditions under which the customer would be taking service. Both the LPSC staff and such intervenors also recommended that the LPSC impose certain conditions on its approval which, if adopted, would support approval of Entergy Louisiana’s application. The LPSC staff’s recommendations included a condition that would require, under specified circumstances, certain sharing of net revenues from service to the project with Entergy Louisiana’s other customers. The LPSC staff also recommended that the LPSC deny approval of the corporate sustainability rider terms providing for the customer to supply funding toward the cost of installing carbon capture and storage infrastructure at Entergy Louisiana’s Lake Charles Power Station. The Louisiana Energy Users Group and other intervenors recommended that the LPSC require various changes to the terms of the electric service agreement with the customer that would shift additional risk and cost to the customer rather than Entergy Louisiana’s broader customer base. Certain intervenors also challenged approval on the basis that Entergy Louisiana did not conduct a request for proposals to procure the proposed generation resources to serve the customer’s project; these intervenors also advocated that Entergy Louisiana be required to procure more renewable generation and evaluate transmission alternatives rather than proceeding with development of all of the proposed new generation resources. In May 2025, Entergy Louisiana filed its rebuttal testimony responding to the direct and cross-answering testimony of the LPSC staff and intervenors. The rebuttal testimony expressed support for or no opposition to the LPSC’s adoption of certain of the proposed recommendations and identified why other proposed recommendations should not be adopted. In addition, the rebuttal testimony stated that the negotiations related to the increase in the load amount for the customer’s project had concluded and that a rider to the electric service agreement reflecting this increase had been executed. In advance of the July 2025 hearing, Entergy Louisiana reached a settlement agreement with the

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

LPSC staff and three separate intervenors. The hearing concluded and the matter is currently under consideration by the ALJ.

Entergy Louisiana Transmission Projects

As discussed in the Form 10-K, in March 2024, Entergy Louisiana filed an application with the LPSC seeking an exemption determination, or alternatively, a certificate of public convenience and necessity, for a transmission project that includes a new 500 kV/230 kV Commodore substation and an approximately 60-mile 230 kV line connecting the new Commodore substation to the Waterford substation. In February 2025, Entergy Louisiana and the LPSC staff jointly filed, for consideration by the LPSC, an uncontested stipulated settlement agreement resolving all issues in the proceeding. The LPSC approved the uncontested stipulated settlement agreement in March 2025 and thereby granted certification of the project.

As discussed in the Form 10-K, in December 2024, Entergy Louisiana filed an application with the LPSC seeking a certificate of public convenience and necessity for a 500 kV transmission project that includes the construction of a new 84-mile Commodore to Churchill 500 kV transmission line, the expansion of the Waterford 500 kV substation, the construction of a new Churchill 500 kV substation and improvements to the Churchill 230 kV substation, and the conversion of the existing 230 kV Waterford to Churchill transmission line to 500 kV, forming a 500 kV loop into the Downstream of Gypsy load pocket. In April 2025 the LPSC staff and the Louisiana Energy Users Group, an intervenor, filed direct testimony. The LPSC staff’s testimony recommends LPSC approval of the project. The Louisiana Energy Users Group’s testimony opines that Entergy Louisiana has shown that there is a need for additional transmission investment in the West Bank area of Amite South but recommends that the LPSC withhold approval pending further analysis, including analysis of potential lower cost alternatives to the proposed project, and also pending Entergy Louisiana demonstrating that it has contributions in aid of construction or minimum bill revenues from the customers whose block load additions would be enabled by the proposed transmission project in amounts sufficient to substantially, if not fully, cover the revenue requirement of the proposed project. In June 2025, Entergy Louisiana filed rebuttal testimony. The hearing is set for August 2025, and an LPSC decision is expected in fourth quarter 2025.

Entergy Mississippi New Advanced Power Station

Entergy Mississippi plans to construct, own, and operate a 754 MW combined cycle combustion turbine facility to be located in the City of Ridgeland, Madison County, Mississippi. The facility will be powered primarily by natural gas, and it will also be enabled for future carbon capture and storage and for hydrogen co-firing optionality. The project is expected to cost in excess of $1 billion. The facility is expected to be in service in 2029.

Legend Power Station and Lone Star Power Station

As discussed in the Form 10-K, in June 2024, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate the Legend Power Station, a 754 MW combined cycle combustion turbine facility, which will be enabled for future carbon capture and storage and for hydrogen co-firing optionality, to be located in Jefferson County, Texas, and the Lone Star Power Station, a 453 MW simple-cycle combustion turbine facility, which will be enabled with hydrogen co-firing optionality, originally expected to be located in Liberty County, Texas. In March 2025, Entergy Texas filed testimony explaining that Entergy Texas planned to move forward with building the Lone Star Power Station on a more cost-effective alternative site in San Jacinto County, Texas. A hearing on the merits was held in April 2025. Also in April 2025, Entergy Texas, intervenors, and the PUCT staff filed initial briefs. In its initial brief, the PUCT staff recommends denial of Entergy Texas’s application or, in the alternative, approval subject to conditions that include a prudence review by an external consultant if actual project costs exceed estimated costs by more than 10%, transmission cost reporting, and weatherization of both the Legend Power Station and the Lone Star Power Station. Certain intervenors requested that the PUCT impose various conditions upon the approval of the resources, including, among others, cost recovery limitations, a direction that Entergy Texas initiate a competitive tariff

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

proceeding to facilitate industrial sleeving, a requirement for additional regulatory approvals related to hydrogen or carbon capture and storage implementation, limits on the recovery of supplemental filing costs, and calculation of AFUDC based on an adjusted weighted average cost of capital. Reply briefs were filed in May 2025. In June 2025 the ALJs with the State Office of Administrative Hearings issued a proposal for decision, in which they recommended rejection of Entergy Texas’s application to construct the Legend Power Station and the Lone Star Power Station based upon their finding that Entergy Texas did not demonstrate the resources to be cost-effective alternatives to address the uncontested need for additional generation. In the alternative, the ALJs recommended that if the PUCT approves the resources, that conditions be imposed, including a deferral of the finding that the resources were prudently selected until Entergy Texas’s next rate case, a prudence review by an external consultant if actual project costs exceed estimated costs by more than 10%, weatherization requirements, and a requirement that Entergy Texas obtain additional regulatory approvals prior to implementing hydrogen co-firing or carbon capture and storage. The ALJs’ proposal for decision is an interim step in the certification process, and it is not binding upon the PUCT. Entergy Texas filed exceptions in July 2025. A PUCT decision is expected in third quarter 2025. Subject to receipt of required regulatory approval and other conditions, both facilities are expected to be in service by mid-2028.

Southeast Texas Area Reliability Project (SETEX)

In February 2025, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate a new single-circuit 500 kV transmission line and associated stations and 138/230 kV facilities. The transmission line is expected to be approximately 131 to 160 miles in length and the estimated cost of the project ranges from $1.3 billion to $1.5 billion, depending upon the route ultimately approved by the PUCT. Also in February 2025 the PUCT referred the proceeding to the State Office of Administrative Hearings. A hearing on the merits was held in May 2025. In July 2025 the ALJs with the State Office of Administrative Hearings issued a proposal for decision recommending the PUCT approve Entergy Texas’s application to construct SETEX and recommending the PUCT’s approval include selection of a specific route with an estimated cost of $1.4 billion. A PUCT decision is expected in third quarter 2025. Subject to receipt of required regulatory approval and other conditions, construction of the project is expected to be completed by the end of 2029.

Cypress to Legend 500 kV Transmission Line

In May 2025, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate a new single-circuit 500 kV transmission line. The transmission line is expected to be approximately 40 to 49 miles in length and the estimated cost of the project ranges from $392.7 million to $436.2 million, depending on the route ultimately approved by the PUCT. In June 2025 the PUCT referred the proceeding to the State Office of Administrative Hearings and the ALJs with the State Office of Administrative Hearings adopted a procedural schedule with a hearing on the merits to be held in mid-August 2025. A PUCT decision is expected in fourth quarter 2025. Subject to receipt of required regulatory approval and other conditions, construction of the project is expected to be completed by the end of 2028.

Dividends

Declarations of dividends on Entergy Corporation common stock are made at the discretion of the Board. Among other things, the Board evaluates the level of Entergy Corporation common stock dividends based upon earnings per share from the Utility segment and the Parent and Other portion of the business, financial strength, and future investment opportunities. In July 2025, the Board declared a dividend of $0.60 per share.

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

Cash Flow Activity

As shown in Entergy’s Consolidated Statements of Cash Flows, cash flows for the six months ended June 30, 2025 and 2024 were as follows:

In Millions

View SEC source
Line item20252024
Cash and cash equivalents at beginning of period$860$133
Net cash provided by (used in):
Operating activities1,7981,546
Investing activities(3,741)(2,466)
Financing activities2,2592,142
Net increase in cash and cash equivalents3161,222
Cash and cash equivalents at end of period$1,176$1,355

Operating Activities

Net cash flow provided by operating activities increased $252 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to:

  • the receipt of $313 million in advance payments related to customer agreements in 2025, which are recorded as current liabilities and included within changes in other working capital accounts;
  • higher collections from Utility customers; and
  • the timing of payments to vendors.

The increase was partially offset by higher fuel and purchased power payments and an increase of $115 million in interest paid. See Note 2 to the financial statements herein and in the Form 10-K for a discussion of fuel and purchased power cost recovery.

Investing Activities

Net cash flow used in investing activities increased $1,275 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to:

  • an increase of $1,196 million in non-nuclear generation construction expenditures primarily due to higher spending by Entergy Arkansas on the Lake Catherine Unit 5 project, by Entergy Louisiana on new generation resources in north Louisiana, by Entergy Mississippi on the Delta Blues Advanced Power Station project, the Penton Solar project, and other non-nuclear generation projects, and by Entergy Texas on the Orange County Advanced Power Station project, the Legend Power Station project, and the Lone Star Power Station project;
  • an increase of $258 million in distribution construction expenditures primarily due to increased investment in the resilience of the Utility distribution system;
  • an increase of $116 million in transmission construction expenditures primarily due to higher spending by Entergy Louisiana on the Commodore transmission projects and increased spending on various other transmission projects in 2025; and
  • an increase of $54 million in nuclear construction expenditures primarily due to increased spending on various nuclear projects in 2025.

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

The increase was partially offset by:

  • the initial payment of approximately $170 million in February 2024 for the purchase of the Walnut Bend Solar facility by Entergy Arkansas;
  • a decrease of $101 million in information technology capital expenditures primarily due to decreased spending on technology upgrade projects in 2025;
  • net receipts from storm reserve escrow accounts of $37 million in 2025 compared to payments to storm reserve escrow accounts of $10 million in 2024; and
  • a decrease of $32 million in nuclear fuel purchases due to variations from year to year in the timing and pricing of fuel reload requirements, materials and services deliveries, and the timing of cash payments during the nuclear fuel cycle.

See Note 14 to the financial statements in the Form 10-K for discussion of the Walnut Bend Solar facility purchase.

Financing Activities

Net cash flow provided by financing activities increased $117 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to:

  • $805 million in net proceeds from the issuance of common stock under the at the market equity distribution program in 2025. There were no issuances of common stock under the at the market equity distribution program in 2024; and
  • an increase of $371 million in net customer advances for construction related to transmission, distribution, and generator interconnection agreements.

The increase was partially offset by:

  • long-term debt activity providing approximately $1,918 million of cash in 2025 compared to providing approximately $2,688 million of cash in 2024;
  • an increase of $246 million in net repayments of commercial paper in 2025 as compared to 2024; and
  • an increase of $34 million in common stock dividends paid in 2025 as a result of an increase in the dividend paid per share in 2025 as compared to 2024.

See Note 3 to the financial statements herein and Note 7 to the financial statements in the Form 10-K for discussion of Entergy Corporation’s at the market equity distribution program. See Note 4 to the financial statements herein and Notes 4 and 5 to the financial statements in the Form 10-K for details of Entergy’s commercial paper program and long-term debt.

Rate, Cost-recovery, and Other Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Rate, Cost-recovery, and Other Regulation” in the Form 10-K for discussions of rate regulation, federal regulation, and related regulatory proceedings.

State and Local Rate Regulation and Fuel-Cost Recovery

See Note 2 to the financial statements herein for updates to the discussion in the Form 10-K regarding these proceedings.

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

Federal Regulation

See Note 2 to the financial statements herein for updates to the discussion in the Form 10-K regarding federal regulatory proceedings.

Market and Credit Risk Sensitive Instruments

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Market and Credit Risk Sensitive Instruments” in the Form 10-K for a discussion of market and credit risk sensitive instruments. The following is an update to that discussion.

Some of the agreements to sell the power produced by Entergy’s non-utility operations business contain provisions that require an Entergy subsidiary to provide credit support to secure its obligations under such agreements. The primary form of credit support used to satisfy these requirements is an Entergy Corporation guarantee. Cash and letters of credit are also acceptable forms of credit support. At June 30, 2025, based on power prices at that time, Entergy had no liquidity exposure under the guarantees in place supporting its non-utility operations business transactions and $3 million of posted cash collateral.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters. The following is an update to that discussion.

NRC Reactor Oversight Process

The NRC’s Reactor Oversight Process is a program to collect information about plant performance, assess the information for its safety significance, and provide for appropriate licensee and NRC response. The NRC evaluates plant performance by analyzing two distinct inputs: inspection findings resulting from the NRC’s inspection program and performance indicators reported by the licensee. The evaluations result in the placement of each plant in one of the NRC’s Reactor Oversight Process Action Matrix columns: “licensee response column,” or Column 1, “regulatory response column,” or Column 2, “degraded cornerstone column,” or Column 3, “multiple/repetitive degraded cornerstone column,” or Column 4, and “unacceptable performance,” or Column 5. Plants in Column 1 are subject to normal NRC inspection activities. Plants in Column 2, Column 3, or Column 4 are subject to progressively increasing levels of inspection by the NRC with, in general, progressively increasing levels of associated costs. Continued plant operation is not permitted for plants in Column 5. All of the nuclear generating plants owned and operated by Entergy’s Utility business are currently in Column 1, except Waterford 3, which is in Column 2.

In June 2025 the NRC placed Waterford 3 in Column 2, effective second quarter 2025, based on the failure to properly develop and implement adequate maintenance instructions for the fuel linkage connection to the mechanical governor for an emergency diesel generator. Waterford 3 will remain in Column 2 until a supplemental inspection is satisfactorily completed.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy’s accounting for nuclear decommissioning costs, utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

Entergy Corporation and Subsidiaries

Management’s Financial Discussion and Analysis

New Accounting Pronouncements

See Note 1 to the financial statements in the Form 10-K for discussion of new accounting pronouncements. The following is an update to that discussion.

As discussed in the Form 10-K, in March 2024 the SEC issued final rules that require registrants to provide certain climate-related disclosures in annual reports and registration statements in order to enhance and standardize climate-related disclosures for investors. In April 2024 the SEC stayed the final rules, pending judicial review of consolidated challenges to the rules by the United States Court of Appeals for the Eighth Circuit. In March 2025 the SEC voted to end its defense of the final rules against parties that have legally challenged the rules. In April 2025 the United States Court of Appeals for the Eighth Circuit ordered the litigation to be held in abeyance and directed the SEC to indicate within 90 days whether the SEC would reconsider or review the climate disclosure rules. In July 2025 the SEC submitted a status report to the United States Court of Appeals for the Eighth Circuit stating that it does not intend to review or reconsider its final rules at this time and requesting that the Court of Appeals terminate the abeyance and proceed with its judicial review of the case. Entergy will continue to monitor developments related to the SEC’s final rules on climate-related disclosures.

  • (Unaudited)
  • (In Thousands, Except Share Data)_

CONSOLIDATED INCOME STATEMENTS

For the Three and Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands, Except Share Data

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
OPERATING REVENUES
Electric$3,274,945$2,906,047$6,032,811$5,612,553
Natural gas40,77835,357112,509101,024
Other13,12612,21630,40334,671
TOTAL3,328,8492,953,6206,175,7235,748,248
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale636,274522,550980,7961,139,166
Purchased power376,105200,705721,851428,847
Nuclear refueling outage expenses29,61338,27762,65476,540
Other operation and maintenance
Asset write-offs, impairments, and related charges (credits)
Decommissioning
Taxes other than income taxes
Depreciation and amortization
Other regulatory charges (credits) - net(55,957)125,607(72,800)234,954
TOTAL2,491,4242,335,9904,638,1944,892,635
OPERATING INCOME
OTHER INCOME (DEDUCTIONS)
Allowance for equity funds used during construction
Interest and investment income
Miscellaneous - net()()()()
TOTAL()()
INTEREST EXPENSE
Interest expense
Allowance for borrowed funds used during construction()()()()
TOTAL322,074289,577651,865556,777
INCOME BEFORE INCOME TAXES
Income taxes
CONSOLIDATED NET INCOME471,95451,732834,376128,268
Preferred dividend requirements of subsidiaries and noncontrolling interests4,0242,8105,6864,065
NET INCOME ATTRIBUTABLE TO ENTERGY CORPORATION
Earnings per average common share:
Basic
Diluted
Basic average number of common shares outstanding
Diluted average number of common shares outstanding
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

For the Three and Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
Net Income$471,954$51,732$834,376$128,268
Other comprehensive (loss) income
Pension and other postretirement plan changes (net of tax (benefit) expense of ($1,411), $65,371, ($3,695), and $64,170)()()
Other comprehensive (loss) income()()
Comprehensive Income
Preferred dividend requirements of subsidiaries and noncontrolling interests4,0242,8105,6864,065
Comprehensive Income Attributable to Entergy Corporation
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED STATEMENTS OF CASH FLOWS

For the Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
OPERATING ACTIVITIES
Consolidated net income$834,376$128,268
Adjustments to reconcile consolidated net income to net cash flow provided by operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization
Deferred income taxes, investment tax credits, and non-current taxes accrued
Asset write-offs, impairments, and related charges (credits)
Pension settlement charge
Changes in working capital:
Receivables()()
Fuel inventory(4,852)18,324
Accounts payable()()
Taxes accrued
Interest accrued
Deferred fuel costs()
Other working capital accounts()
Changes in provisions for estimated losses()
Changes in other regulatory assets174,523260,722
Changes in other regulatory liabilities20,040380,394
Changes in pension and other postretirement funded status()()
Other()()
Net cash flow provided by operating activities
INVESTING ACTIVITIES
Construction/capital expenditures()()
Allowance for equity funds used during construction
Nuclear fuel purchases()()
Payment for purchase of plant and assets()()
Changes in securitization account3,3093,976
Payments to storm reserve escrow accounts(6,808)(9,595)
Receipts from storm reserve escrow accounts43,789
Increase in other investments()()
Litigation proceeds for reimbursement of spent nuclear fuel storage costs3,546
Proceeds from nuclear decommissioning trust fund sales
Investment in nuclear decommissioning trust funds()()
Net cash flow used in investing activities()()
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED STATEMENTS OF CASH FLOWS

For the Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
FINANCING ACTIVITIES
Proceeds from the issuance of:
Long-term debt
Treasury stock24,53945,982
Common stock
Retirement of long-term debt()()
Changes in commercial paper - net()()
Customer advances received for construction732,454192,426
Customer advances used for construction(245,481)(76,768)
Other()
Dividends paid:
Common stock()()
Preferred stock()()
Net cash flow provided by financing activities
Net increase in cash and cash equivalents
Cash and cash equivalents at beginning of period859,703132,548
Cash and cash equivalents at end of period$1,175,631$1,355,164
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid during the period for:
Interest - net of amount capitalized
Income taxes
Noncash investing activities:
Accrued construction expenditures
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED BALANCE SHEETS · ASSETS

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT ASSETS
Cash and cash equivalents:
Cash$164,024$48,424
Temporary cash investments1,011,607811,279
Total cash and cash equivalents1,175,631859,703
Accounts receivable:
Customer839,379681,504
Allowance for doubtful accounts()()
Other
Accrued unbilled revenues
Total accounts receivable1,665,4441,390,399
Deferred fuel costs99,774
Fuel inventory - at average cost
Materials and supplies
Deferred nuclear refueling outage costs103,07299,885
Current assets held for sale19,60215,574
Prepayments and other327,284233,212
TOTAL
OTHER PROPERTY AND INVESTMENTS
Decommissioning trust funds5,833,4325,562,575
Non-utility property - at cost (less accumulated depreciation)
Storm reserve escrow accounts303,479340,460
Other
TOTAL
PROPERTY, PLANT, AND EQUIPMENT
Electric72,332,65070,818,667
Natural gas78,18277,054
Construction work in progress
Nuclear fuel727,407765,661
TOTAL PROPERTY, PLANT, AND EQUIPMENT78,153,17474,867,690
Less - accumulated depreciation and amortization28,147,57027,444,740
PROPERTY, PLANT, AND EQUIPMENT - NET
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets (includes securitization property of $226,006 as of June 30, 2025 and $234,112 as of December 31, 2024)5,082,8425,255,509
Deferred fuel costs172,201172,201
Goodwill
Accumulated deferred income taxes
Non-current assets held for sale472,528462,797
Other
TOTAL
TOTAL ASSETS$68,383,140$64,790,032
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED BALANCE SHEETS · LIABILITIES AND EQUITY

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT LIABILITIES
Currently maturing long-term debt$1,815,112$1,378,090
Notes payable and commercial paper475,605927,291
Accounts payable2,133,7971,929,162
Customer deposits
Taxes accrued468,336457,093
Interest accrued282,421259,554
Deferred fuel costs73,937237,146
Pension and other postretirement liabilities
Customer advances455,454151,662
Other
TOTAL
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued
Accumulated deferred investment tax credits
Regulatory liability for income taxes - net1,140,5871,168,078
Other regulatory liabilities3,659,1633,609,463
Decommissioning and asset retirement cost liabilities4,825,3644,713,426
Accumulated provisions
Pension and other postretirement liabilities
Long-term debt (includes securitization bonds of as of June 30, 2025 and as of December 31, 2024)28,114,72626,613,505
Customer advances for construction1,121,559634,587
Other909,4081,112,881
TOTAL
Commitments and Contingencies
Subsidiaries’ preferred stock without sinking fund219,410219,410
EQUITY
Preferred stock, no par value, authorized shares in 2025 and 2024; issued shares in 2025 and 2024 -
Common stock, par value, authorized shares in 2025 and 2024; issued shares in 2025 and shares in 2024
Paid-in capital
Retained earnings12,326,28912,014,315
Accumulated other comprehensive income34,43842,769
Less - treasury stock, at cost ( shares in 2025 and shares in 2024)
Total shareholders’ equity16,213,00015,083,908
Subsidiaries’ preferred stock without sinking fund and noncontrolling interests95,940101,076
TOTAL16,308,94015,184,984
TOTAL LIABILITIES AND EQUITY
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED STATEMENT OF CHANGES IN EQUITY

For the Six Months Ended June 30, 2025 · Unaudited · In Thousands

View SEC source
Line itemSubsidiaries’ Preferred Stock and Noncontrolling InterestsShareholders’ EquityCommon StockShareholders’ EquityTreasury StockShareholders’ EquityPaid-in CapitalShareholders’ EquityRetained EarningsShareholders’ EquityAccumulated Other Comprehensive IncomeTotal
Balance at December 31, 2024$101,076$5,620($4,812,321)$7,833,525$12,014,315$42,769$15,184,984
Consolidated net income (a)1,662360,760362,422
Other comprehensive loss(3,729)()
Common stock issuances related to stock plans43,398(40,777)
Common stock dividends declared(258,249)()
Distributions to noncontrolling interests(1,069)()
Preferred dividend requirements of subsidiaries (a)(4,580)(4,580)
Balance at March 31, 202597,0895,620(4,768,923)7,792,74812,116,82639,04015,282,400
Consolidated net income (a)4,024467,930471,954
Other comprehensive loss(4,602)()
Common stock issuances and sales under the at the market equity distribution program155813,716
Common stock issuance costs(9,240)()
Common stock issuances related to stock plans2,70815,489
Common stock dividends declared(258,467)()
Distributions to noncontrolling interests(593)()
Preferred dividend requirements of subsidiaries (a)(4,580)(4,580)
Balance at June 30, 2025$95,940$5,775($4,766,215)$8,612,713$12,326,289$34,438$16,308,940
See Notes to Financial Statements.
(a) Consolidated net income and preferred dividend requirements of subsidiaries for first quarter 2025 and second quarter 2025 each includes $4 million of preferred dividends on subsidiaries’ preferred stock without sinking fund that is not presented as equity.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED STATEMENT OF CHANGES IN EQUITY

For the Six Months Ended June 30, 2024 · Unaudited · In Thousands

View SEC source
Line itemSubsidiaries' Preferred Stock and Noncontrolling InterestsShareholders’ EquityCommon StockShareholders’ EquityTreasury StockShareholders’ EquityPaid-in CapitalShareholders’ EquityRetained EarningsShareholders’ EquityAccumulated Other Comprehensive Income (Loss)Total
Balance at December 31, 2023$120,459$5,620($4,953,498)$7,792,601$11,940,384($162,460)$14,743,106
Consolidated net income (a)1,25575,28176,536
Other comprehensive loss(3,668)()
Common stock issuances related to stock plans30,881(25,842)
Common stock dividends declared(240,959)()
Distributions to noncontrolling interests(1,108)()
Preferred dividend requirements of subsidiaries (a)(4,580)(4,580)
Balance at March 31, 2024116,0265,620(4,922,617)7,766,75911,774,706(166,128)14,574,366
Consolidated net income (a)2,81048,92251,732
Other comprehensive income246,489
Common stock issuances related to stock plans38,92216,352
Common stock dividends declared(241,296)()
Distributions to noncontrolling interests(330)()
Preferred dividend requirements of subsidiaries (a)(4,580)(4,580)
Balance at June 30, 2024$113,926$5,620($4,883,695)$7,783,111$11,582,332$80,361$14,681,655
See Notes to Financial Statements.
(a) Consolidated net income and preferred dividend requirements of subsidiaries for first quarter 2024 and second quarter 2024 each includes $4 million of preferred dividends on subsidiaries’ preferred stock without sinking fund that is not presented as equity.

ENTERGY CORPORATION AND SUBSIDIARIES

NOTES TO FINANCIAL STATEMENTS

(Unaudited)

NOTE 1. COMMITMENTS AND CONTINGENCIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy and the Registrant Subsidiaries are involved in a number of legal, regulatory, and tax proceedings before various courts, regulatory authorities, and governmental agencies in the ordinary course of business. While management is unable to predict with certainty the outcome of such proceedings, management does not believe that the ultimate resolution of these matters will have a material adverse effect on Entergy’s results of operations, cash flows, or financial condition, except as otherwise discussed in the Form 10-K or in this report. Entergy discusses regulatory proceedings in Note 2 to the financial statements in the Form 10-K and herein and discusses tax proceedings in Note 3 to the financial statements in the Form 10-K and Note 10 to the financial statements herein.

Vidalia Purchased Power Agreement

See Note 8 to the financial statements in the Form 10-K for information on Entergy Louisiana’s Vidalia purchased power agreement.

Spent Nuclear Fuel Litigation

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s spent nuclear fuel litigation. The following is an update to that discussion.

As discussed in the Form 10-K, in October 2024 the U.S. Court of Federal Claims issued a final judgment in the amount of $7 million in favor of Holtec Palisades, LLC (previously Entergy Nuclear Palisades) and against the DOE in the final round Palisades damages case. Holtec, as the current owner, received payment from the U.S. Treasury in March 2025 and subsequently transferred the $7 million judgment to Entergy. The effect in 2024 of recording the judgment was a reduction to asset write-offs, impairments, and related charges (credits). The damages awarded included $4 million related to costs previously recorded as plant and $3 million related to costs previously recorded as other operation and maintenance expenses.

Nuclear Insurance

See Note 8 to the financial statements in the Form 10-K for information on nuclear liability and property insurance associated with Entergy’s nuclear power plants.

Non-Nuclear Property Insurance

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s non-nuclear property insurance program.

Employment and Labor-related Proceedings

See Note 8 to the financial statements in the Form 10-K for information on Entergy’s employment and labor-related proceedings.

Asbestos Litigation (Entergy Arkansas, Entergy Louisiana, Entergy New Orleans, and Entergy Texas)

See Note 8 to the financial statements in the Form 10-K for information regarding asbestos litigation.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Grand Gulf-Related Agreements

See Note 8 to the financial statements in the Form 10-K for information regarding Grand Gulf-related agreements, including the Unit Power Sales Agreement, the Availability Agreement, and the Reallocation Agreement.

Exclusivity Agreement with Major Vendor

Entergy entered into an exclusivity agreement with a major vendor to manufacture power island equipment (PIE) and combustion turbines (CT) for combustion turbine generator set frames larger than 400 MWs. The agreement guarantees Entergy one manufacturing slot per quarter for the shorter of a five-year period or until Entergy fulfills its minimum commitment. The agreement commits Entergy to a minimum order of 15 sets of PIE and two CTs during that time period. The commitments are fully transferable to any of the Utility operating companies.

Cancellation or failure to purchase the minimum commitment amounts will result in a charge. If any of the Utility operating companies purchases any PIEs or CTs within the scope of the agreement from another supplier (except as permitted under the agreement), then the vendor has the right to terminate all or a portion of the agreement. In the event of such termination, the Utility operating company would then be obligated to pay 50% of the base price for each PIE or CT not yet ordered. The agreement does not establish final pricing and delivery dates of purchases that will go towards meeting the commitments under the agreement. Such terms shall be agreed to in separate agreements.

NOTE 2. RATE AND REGULATORY MATTERS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Regulatory Assets and Regulatory Liabilities

See Note 2 to the financial statements in the Form 10-K for information regarding regulatory assets and regulatory liabilities in the Utility business presented on the balance sheets of Entergy and the Registrant Subsidiaries. The following are updates to that discussion.

Fuel and purchased power cost recovery

Entergy Arkansas

Energy Cost Recovery Rider

In March 2025, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.00882 per kWh to $0.01333 per kWh. The annual redetermination included a credit related to the remaining balance due to retail customers from the System Energy settlement with the APSC, plus carrying charges and interest. See “Retail Rate Proceedings - Filings with the APSC (Entergy Arkansas) - Retail Rates - Grand Gulf Credit Rider” below for further discussion. The primary reason for the rate increase is an adjustment to account for projected increases in natural gas prices in 2025. This adjustment is expected to reduce the rate change that will be reflected in its 2026 energy cost rate redetermination. The redetermined rate of $0.01333 per kWh became effective with the first billing cycle in April 2025 through the normal operation of the tariff.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Entergy Louisiana

As discussed in the Form 10-K, in January 2023 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from 2021 through 2022. In April 2025 the LPSC staff issued its audit report (for Entergy Louisiana’s gas operations), which included several prospective recommendations but no financial disallowances. The LPSC accepted the report in June 2025.

Entergy Texas

As discussed in the Form 10-K, in September 2024, Entergy Texas filed an application with the PUCT to reconcile its fuel and purchased power costs for the period from April 2022 through March 2024. During the reconciliation period, Entergy Texas incurred approximately $1.6 billion in eligible fuel and purchased power expenses to generate and purchase electricity to serve its customers, net of certain revenues credited to such expenses and other adjustments. Entergy Texas’s cumulative under-recovery balance for the reconciliation period was approximately $30 million, including interest, which Entergy Texas requested authority to carry over as part of the cumulative fuel balance for the subsequent reconciliation period beginning April 2024. In November 2024 the PUCT referred the proceeding to the State Office of Administrative Hearings. In March 2025, Texas Industrial Energy Consumers, an intervenor, filed testimony regarding the recovery of capacity costs for a certain power purchase agreement, arguing the capacity costs should be imputed and treated as non-reconcilable fuel expense, recovered in Entergy Texas’s base rates. In April 2025 the PUCT staff filed testimony and later in April 2025, Entergy Texas filed rebuttal testimony. In May 2025, Entergy Texas filed, and the ALJ with the State Office of Administrative Hearings granted, a request for a paper hearing and to cancel the oral hearing on the merits previously scheduled for later in May 2025. In June 2025, Entergy Texas filed, and the ALJ with the State Office of Administrative Hearings granted, a joint motion to abate the proceeding to give the parties to the proceeding additional time to finalize a settlement.

Retail Rate Proceedings

See Note 2 to the financial statements in the Form 10-K for information regarding retail rate proceedings involving the Utility operating companies. The following are updates to that discussion.

Filings with the APSC (Entergy Arkansas)

Retail Rates

2025 Formula Rate Plan Filing

In July 2025, Entergy Arkansas filed with the APSC its 2025 formula rate plan filing to set its formula rate for the 2026 calendar year. The filing contained an evaluation of Entergy Arkansas’s earnings for the 2026 projected year and a netting adjustment for the 2024 historical year. The filing showed that Entergy Arkansas’s earned rate of return on common equity for the 2026 projected year was 8.45% resulting in a revenue deficiency of $68.9 million. The earned rate of return on common equity for the 2024 historical year was 7.71% resulting in a $48.8 million netting adjustment. The total proposed revenue change for the 2026 projected year and 2024 historical year netting adjustment is $117.7 million. By operation of the formula rate plan, Entergy Arkansas’s recovery of the revenue requirement is subject to a four percent annual revenue constraint. Because Entergy Arkansas’s revenue requirement in this filing exceeded the constraint, the resulting increase was limited to $92.3 million. Entergy Arkansas proposed a procedural schedule that includes a hearing in November 2025 and requests an APSC order in December 2025.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Grand Gulf Credit Rider

As discussed in the Form 10-K, in June 2024, Entergy Arkansas filed with the APSC a tariff to provide retail customers a credit resulting from the terms of the settlement agreement between Entergy Arkansas, System Energy, additional named Entergy parties, and the APSC pertaining to System Energy’s billings for wholesale sales of energy and capacity from the Grand Gulf nuclear plant. See “Complaints Against System Energy - System Energy Settlement with the APSC” in Note 2 to the financial statements in the Form 10-K for discussion of the System Energy settlement with the APSC. In July 2024 the APSC approved the tariff, under which Entergy Arkansas would refund to retail customers a total of $100.6 million. Entergy Arkansas refunded $92.3 million of the total through one-time bill credits under the Grand Gulf credit rider during the August 2024 billing cycle. In March 2025, Entergy Arkansas included the remaining balance as a credit to retail customers in its energy cost recovery rider rate redetermination filing. See further discussion within "Regulatory Assets and Regulatory Liabilities - Fuel and purchased power cost recovery - Entergy Arkansas - Energy Cost Recovery Rider" above. In April 2025 the APSC approved Entergy Arkansas’s proposal to include the remaining balance in its energy cost recovery rider effective with the first billing cycle of April 2025 and the withdrawal of the Grand Gulf credit rider after all credits had been issued. Credits to retail customers were completed in second quarter 2025, and the Grand Gulf credit rider was subsequently withdrawn.

Filings with the LPSC (Entergy Louisiana)

Retail Rates - Electric

2023 Formula Rate Plan Filing

As discussed in the Form 10-K, in August 2024, pursuant to the global stipulated settlement agreement approved by the LPSC also in August 2024, Entergy Louisiana filed its formula rate plan evaluation report for its 2023 calendar year operations. Consistent with the global stipulated settlement agreement, the filing reflected a 9.7% allowed return on common equity with a bandwidth of 40 basis points above and below the midpoint. For the 2023 test year, however, the bandwidth provisions of the formula rate plan were temporarily suspended and, pursuant to the terms of the global stipulated settlement agreement, Entergy Louisiana implemented the September 2024 formula rate plan rate adjustments effective with the first billing cycle of September 2024. In January 2025, Entergy Louisiana and the LPSC filed a joint report indicating that no disputed issues remained in the proceeding and requesting that the LPSC issue an order accepting Entergy Louisiana’s evaluation report and, ultimately, resolving this matter. In March 2025 the LPSC issued an order accepting the evaluation report.

In December 2024, pursuant to the terms of the global stipulated settlement agreement, Entergy Louisiana filed an interim rate adjustment for the 2023 test year reflecting the return of $25.1 million of refunds from the System Energy settlement with the LPSC to customers from January through August 2025. In February 2025, pursuant to the terms of the global stipulated settlement agreement, Entergy Louisiana filed a second interim rate adjustment for the 2023 test year reflecting the divestiture of Entergy Louisiana’s share of Grand Gulf capacity and energy, which was effective as of January 1, 2025. The second interim rate adjustment also reflected a revenue increase of $17.8 million for the recovery of Hurricane Francine costs as approved by the LPSC (on an interim basis). The second interim rate adjustment was implemented with the first billing cycle of March 2025. See further discussion of the Hurricane Francine proceeding in “Storm Cost Recovery Filings with Retail Regulators – Entergy Louisiana – Hurricane Francine” below. See Note 8 to the financial statements in the Form 10-K for discussion of Entergy Louisiana’s divestiture from the Unit Power Sales Agreement.

2024 Formula Rate Plan Filing

In May 2025, Entergy Louisiana filed its formula rate plan evaluation report for its 2024 calendar year operations. Consistent with the global stipulated settlement agreement approved by the LPSC in August 2024, the filing reflected a 9.7% allowed return on common equity with a bandwidth of 40 basis points above and below the

Entergy Corporation and Subsidiaries

Notes to Financial Statements

midpoint. For the test year 2024, however, any earnings above the allowed return on common equity are to be returned to customers through a credit, pursuant to the terms of the global stipulated settlement agreement. The 2024 test year evaluation produced an earned return on common equity of 9.98%, which is within the approved formula rate plan bandwidth, but above the allowed return on common equity, resulting in a customer credit of $31.9 million to be returned to customers during September and October 2025.

Other changes in formula rate plan revenue are driven by higher nuclear depreciation rates, additions to transmission and distribution plant in service reflected through the transmission recovery mechanism and distribution recovery mechanism, and the expiration of customer credits related to the LPSC’s order, offset by increased customer credits resulting from an increase in net MISO revenues reflected through the MISO cost recovery mechanism and the reduction in the Louisiana corporate income tax rate effective January 1, 2025, reflected through the tax adjustment mechanism, as discussed below. Excluding the customer credit for earnings above the authorized return on common equity discussed above, the net result of these changes on an annualized basis is a $2 million increase in formula rate plan revenue.

As noted above, the 2024 evaluation report included the effects of the change in Louisiana state tax law that reduced the corporate income tax rate to a flat 5.5% (from the then-current highest marginal rate of 7.5%) effective January 1, 2025. As such, the 2024 evaluation report reflected the calculation of current and deferred income tax expenses as well as the revaluation of accumulated deferred income taxes based on the income tax laws currently in effect. The 2024 evaluation report proposes that the rate effects associated with the revaluation of accumulated deferred income taxes, including the collection of any net accumulated deferred income tax deficiency and any related effects on rate base, should be reflected in the tax adjustment mechanism consistent with the treatment of similar Tax Cuts and Jobs Act and prior state tax change-related impacts. The effects of the change in tax law on Entergy Louisiana’s authorized return on rate base are also reflected in the 2024 evaluation report consistent with the treatment cited above, including a credit in the extraordinary cost change mechanism for the prospective change in Entergy Louisiana’s authorized return and a credit within the tax adjustment mechanism for over-collection of income tax expense through August 2025.

Additional Generation and Transmission Resources

As discussed in the Form 10-K, in October 2024, Entergy Louisiana filed an application with the LPSC seeking approval of a variety of generation and transmission resources proposed in connection with establishing service to a new data center to be developed by a subsidiary of Meta Platforms, Inc. in north Louisiana, for which an electric service agreement has been executed. The filing requests LPSC certification of three new combined cycle combustion turbine generation resources totaling 2,262 MW, each of which will be enabled for future carbon capture and storage, a new 500 kV transmission line, and 500 kV substation upgrades. The application also requests approval to implement a corporate sustainability rider applicable to the new customer. The corporate sustainability rider contemplates the new customer contributing to the costs of the future addition of 1,500 MW of new solar and energy storage resources, agreements involving carbon capture and storage at Entergy Louisiana’s existing Lake Charles Power Station, and potential future wind and nuclear resources. Entergy Louisiana anticipates funding the incremental cost to serve the customer through direct financial contributions from the customer and the revenues it expects to earn under the electric service agreement. The electric service agreement also contains provisions for termination payments that will help ensure that there is no harm to Entergy Louisiana and its customers in the event of early termination. A directive was issued at the LPSC’s November 2024 meeting for the matter to be decided by October 2025. In February 2025 intervenors filed a motion asking the LPSC to deny Entergy Louisiana’s requested exemption from the LPSC’s order addressing competitive solicitation procedures and further asking the LPSC to dismiss the application. The ALJ issued an order denying the motion to dismiss the application and deferring the LPSC’s consideration of the motion regarding the competitive solicitation procedures until the hearing. In March 2025 the same intervenors filed a motion requesting the LPSC to require the customer and its parent company to be joined as parties to the proceeding or dismiss the application. In April 2025 the ALJ issued an order denying the March 2025 motion, and the moving parties filed a motion asking the LPSC to review and reverse the ALJ’s decision.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

In February 2025, Entergy Louisiana filed supplemental testimony with the LPSC stating that the third combined cycle combustion turbine resource presented in the October 2024 application would be sited at Entergy Louisiana’s Waterford site in Killona, Louisiana, alongside existing Entergy Louisiana generation resources. The testimony also notes that Entergy Louisiana is negotiating with the customer in response to the customer’s request to increase the load associated with its project in north Louisiana. The testimony indicates further that the additional load can be served without additional generation capacity beyond what was presented in the October 2024 application, but that additional transmission facilities, which will be funded directly by the customer, are needed to serve this additional load.

In April 2025 and May 2025 the LPSC staff and certain intervenors each filed their direct testimony and cross-answering testimony, respectively. The LPSC staff’s testimony discussed the significant projected benefits associated with the data center project; however, both the LPSC staff and such intervenors also identified purported risks associated with constructing the requested resources based on the terms and conditions under which the customer would be taking service. Both the LPSC staff and such intervenors also recommended that the LPSC impose certain conditions on its approval which, if adopted, would support approval of Entergy Louisiana’s application. The LPSC staff’s recommendations included a condition that would require, under specified circumstances, certain sharing of net revenues from service to the project with Entergy Louisiana’s other customers. The LPSC staff also recommended that the LPSC deny approval of the corporate sustainability rider terms providing for the customer to supply funding toward the cost of installing carbon capture and storage infrastructure at Entergy Louisiana’s Lake Charles Power Station. The Louisiana Energy Users Group and other intervenors recommended that the LPSC require various changes to the terms of the electric service agreement with the customer that would shift additional risk and cost to the customer rather than Entergy Louisiana’s broader customer base. Certain intervenors also challenged approval on the basis that Entergy Louisiana did not conduct a request for proposals to procure the proposed generation resources to serve the customer’s project; these intervenors also advocated that Entergy Louisiana be required to procure more renewable generation and evaluate transmission alternatives rather than proceeding with development of all of the proposed new generation resources. In May 2025, Entergy Louisiana filed its rebuttal testimony responding to the direct and cross-answering testimony of the LPSC staff and intervenors. The rebuttal testimony expressed support for or no opposition to the LPSC’s adoption of certain of the proposed recommendations and identified why other proposed recommendations should not be adopted. In addition, the rebuttal testimony stated that the negotiations related to the increase in the load amount for the customer’s project had concluded and that a rider to the electric service agreement reflecting this increase had been executed. In advance of the July 2025 hearing, Entergy Louisiana reached a settlement agreement with the LPSC staff and three separate intervenors. The hearing concluded and the matter is currently under consideration by the ALJ.

COVID-19 Orders

As discussed in the Form 10-K, in April 2020 the LPSC issued an order authorizing utilities to record as a regulatory asset expenses incurred from the suspension of disconnections and collection of late fees imposed by LPSC orders associated with the COVID-19 pandemic. In April 2023, Entergy Louisiana filed an application proposing to utilize approximately $1.6 billion in certain low interest debt to generate earnings to apply toward the reduction of the COVID-19 regulatory asset, as well as to conduct additional outside right-of-way vegetation management activities and fund the minor storm reserve account. In that filing, Entergy Louisiana proposed to delay repayment of certain shorter-term first mortgage bonds that were issued to finance storm restoration costs until the costs could be securitized, and to invest the funds that otherwise would be used to repay those bonds in the money pool to take advantage of the spread between prevailing interest rates on investments in the money pool and the interest rates on the bonds. The LPSC approved Entergy Louisiana’s requested relief in June 2023. In November 2024, Entergy Louisiana submitted a filing to the LPSC requesting that the LPSC review Entergy Louisiana’s computation of the COVID-19 regulatory asset as well as Entergy Louisiana’s proposal to offset the regulatory asset against the net interest earned on the short-term debt funds, resulting in no increased costs to customers. At the time of the filing, Entergy Louisiana had a regulatory asset of $47.8 million for costs associated

Entergy Corporation and Subsidiaries

Notes to Financial Statements

with the COVID-19 pandemic. As of June 30, 2025, Entergy Louisiana had a regulatory liability of $48.9 million for the deferred earnings related to the approximately $1.6 billion in low interest debt, which had been fully repaid by August 2024. In granting Entergy Louisiana’s requested relief in June 2023, the LPSC ordered that any amount of earnings exceeding the amount of the COVID-19 regulatory asset be transferred to Entergy Louisiana’s storm reserve escrow account. In May 2025 the LPSC staff filed direct testimony finding that Entergy Louisiana had complied with the relevant orders and recommending approval of the requested treatment. In June 2025, Entergy Louisiana and the LPSC staff filed a joint motion requesting a hearing for the admission of an uncontested stipulated settlement agreement in the matter. A settlement hearing took place in July 2025 and Entergy Louisiana expects the settlement to be considered at an upcoming meeting of the LPSC. The settlement terms provide for LPSC approval of Entergy Louisiana’s calculation of the COVID-19 regulatory assets and Entergy Louisiana’s proposal to offset the regulatory asset as described above and as proposed in Entergy Louisiana’s November 2024 filing.

Filings with the MPSC (Entergy Mississippi)

Retail Rates

2025 Formula Rate Plan Filing

In February 2025, Entergy Mississippi submitted its formula rate plan 2025 test year filing and 2024 look-back filing showing Entergy Mississippi’s earned return on rate base for the historical 2024 calendar year to be within the formula rate plan bandwidth and projected earned return for the 2025 calendar year also to be within the formula rate plan bandwidth. The 2025 test year filing showed an earned return on rate base of 7.64% and reflected no change in formula rate plan revenues. The 2024 look-back filing compared actual 2024 results to the approved benchmark return on rate base and reflected no change in formula rate plan revenues, although Entergy Mississippi proposed to adjust interim rates by $135 thousand to reflect two outside-the-bandwidth changes: (1) the completion of Entergy Mississippi’s return to customers of credits under its restructuring credit rider; and (2) a true-up of demand side management costs.

In June 2025, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation that confirmed the 2025 test year filing, with the exception of immaterial adjustments to certain operation and maintenance expenses. The formula rate plan reflected an earned return on rate base of 7.68% for calendar year 2025, resulting in no change in formula rate plan revenues for 2025. Pursuant to the stipulation, Entergy Mississippi’s 2024 look-back filing reflected an earned return on rate base of 7.55%, which also resulted in no change in formula rate plan revenues for 2024. In addition, the stipulation included the recovery of the two outside-the-bandwidth changes discussed above as well as the ratemaking treatment of customer contributions (deferred revenue and prepaid contributions in aid of construction). In June 2025 the MPSC approved the joint stipulation with rates effective in July 2025.

Interim Facilities Rate Adjustments

In May 2024, Entergy Mississippi received approval from the MPSC for formula rate plan revisions that were necessary for Entergy Mississippi to comply with state legislation passed in January 2024. The legislation allows Entergy Mississippi to make interim rate adjustments to recover the non-fuel related annual ownership cost of certain facilities that directly or indirectly provide service to customers who own certain data processing center projects as specified in the legislation. Entergy Mississippi filed the first of its annual interim facilities rate adjustment reports in May 2024 to recover approximately $8.7 million of these costs over a six-month period with rates effective beginning in July 2024. Entergy Mississippi filed its second interim facilities rate adjustment report in November 2024 to recover approximately $46.7 million of these costs over a 12-month period with rates effective beginning in January 2025. In February 2025, Entergy Mississippi filed a true-up interim facilities rate adjustment report to the initial annual interim facilities rate adjustment report filed in May 2024, reflecting the recovery of an

Entergy Corporation and Subsidiaries

Notes to Financial Statements

additional approximately $1.0 million of costs over a 12-month period with rates effective with the first billing cycle of April 2025.

Filings with the City Council (Entergy New Orleans)

Retail Rates

2025 Formula Rate Plan Filing

In April 2025, Entergy New Orleans submitted to the City Council its formula rate plan 2024 test year filing. The 2024 evaluation report produced an electric earned return on equity of 10.98% compared to the authorized return on equity of 9.35%. Without adjustments, this would result in a decrease in electric rates of $13.8 million. The decrease in electric rates is driven by the realignment of regulatory liabilities into the formula from a separate rate mechanism, partially offset by the cost of known and measurable electric capital additions. The filing also commences the previously authorized recovery of certain regulatory costs and requests a revenue-neutral recovery to offset a proposed reduction in bill payment late fees. Taking into account these proposed adjustments, the filing presents a decrease in authorized electric revenues of $8.6 million. The City Council’s advisors issued their report in July 2025 seeking a reduction in Entergy New Orleans’s requested electric formula rate plan revenues of approximately $7.2 million due to certain proposed cost realignments and disallowances, of which $4.1 million is associated with Entergy New Orleans’s proposed implementation, on a revenue neutral basis, of a proposed reduction in customer late fees. The City Council’s advisors also proposed rate mitigation in the amount of $4.4 million through offsets to the formula rate plan funded by certain regulatory liabilities. The City Council’s advisors’ report began a 35-day period to resolve any disputes among the parties regarding the formula rate plan. For any disputed rate adjustments, the City Council would set a procedural schedule to resolve. Resulting rates will be effective with the first billing cycle of September 2025 pursuant to the formula rate plan tariff.

Filings with the PUCT and Texas Cities (Entergy Texas)

Retail Rates

Distribution Cost Recovery Factor (DCRF) Rider

In April 2025, Entergy Texas filed with the PUCT a request to amend its DCRF rider. The amended rider was designed to collect from Entergy Texas’s retail customers approximately $77.8 million annually, or $29.3 million in incremental annual revenues beyond Entergy Texas’s then-effective DCRF rider based on its capital invested in distribution between July 1, 2024 and December 31, 2024, including distribution-related restoration costs associated with Hurricane Beryl. In June 2025 the PUCT approved the DCRF rider, consistent with Entergy Texas’s as-filed request, and rates became effective on June 25, 2025.

Transmission Cost Recovery Factor (TCRF) Rider

As discussed in the Form 10-K, in October 2024, Entergy Texas filed with the PUCT a request to amend its TCRF rider, which was previously reset to zero in June 2023 as a result of the 2022 base rate case. The amended rider was designed to collect from Entergy Texas’s retail customers approximately $9.7 million annually based on its capital invested in transmission between January 1, 2022 and June 30, 2024 and changes in other transmission charges. In April 2025 the PUCT approved the TCRF rider, consistent with Entergy Texas’s as-filed request, and rates became effective for usage on and after April 7, 2025.

Entergy Arkansas Opportunity Sales Proceeding

As discussed in the Form 10-K, in September 2020, Entergy Arkansas filed a complaint in the U.S. District Court for the Eastern District of Arkansas challenging the APSC’s denial of recovery of $135 million of payments

Entergy Corporation and Subsidiaries

Notes to Financial Statements

to other Utility operating companies in December 2018 relating to off-system sales of electricity from 2002-2009, as ordered by the FERC. The complaint also involved a challenge to the $13.7 million, plus interest, of related refunds ordered by the APSC and paid by Entergy Arkansas in August 2020. The trial was held in February 2023.

In March 2024 the U.S. District Court for the Eastern District of Arkansas issued a judgment in favor of the APSC and against Entergy Arkansas. In March 2024 Entergy Arkansas filed a notice of appeal and a motion to expedite oral arguments with the United States Court of Appeals for the Eighth Circuit and the court granted the motion to expedite. As a result of the adverse decision by the U.S. District Court for the Eastern District of Arkansas, Entergy Arkansas concluded that it could no longer support the recognition of its $131.8 million regulatory asset reflecting the previously-expected recovery of a portion of the costs at issue in the opportunity sales proceeding and recorded a $131.8 million ($99.1 million net-of-tax) charge to earnings in first quarter 2024. In December 2024 the United States Court of Appeals for the Eighth Circuit affirmed the decision of the U.S. District Court for the Eastern District of Arkansas, and Entergy Arkansas filed a petition for rehearing en banc. In January 2025 the United States Court of Appeals for the Eighth Circuit denied Entergy Arkansas’s petition. In April 2025, Entergy Arkansas filed a petition for certiorari with the United States Supreme Court. In June 2025 the United States Supreme Court denied Entergy Arkansas’s petition for certiorari.

MSS-4 Replacement Tariff - Net Operating Loss Carryforward Proceeding

See Note 2 to the financial statements in the Form 10-K for discussion of the MSS-4 replacement tariff net operating loss carryforward proceeding.

The MSS-4 replacement tariff, a tariff governing the sales of energy and capacity among the Utility operating companies, includes protocols that provide for the disclosure of cost inputs, an opportunity for informal discovery procedures, and a challenge process. In April 2025, pursuant to such protocols, the City Council filed with the FERC a formal challenge relating to Entergy Services’ inclusion and allocation of net operating loss carryforward accumulated deferred income taxes in the MSS-4 replacement tariff rates charged to Entergy New Orleans’s monthly bills for calendar year 2023. In May 2025, Entergy Services filed a response to the formal challenge and is awaiting a response from the FERC.

Complaints Against System Energy

See Note 2 to the financial statements in the Form 10-K for information regarding pending complaints against System Energy and the settlements approved by the FERC that resolved all significant aspects of these complaints. The following are updates to that discussion.

Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue

As discussed in the Form 10-K, in February 2023, System Energy submitted a tariff compliance filing with the FERC to clarify that, consistent with the releases provided in the June 2022 MPSC settlement, Entergy Mississippi would continue to be charged for its allocation of the sale-leaseback renewal costs under the Unit Power Sales Agreement. In March 2023 the MPSC filed a protest to System Energy’s tariff compliance filing. The MPSC argued that the settlement did not specifically address post-settlement sale-leaseback renewal costs and that the sale-leaseback renewal costs may not be recovered under the Unit Power Sales Agreement. In February 2025, System Energy and the MPSC resolved their dispute concerning the sale-leaseback renewal costs. As a result, the MPSC withdrew its protest at the FERC on System Energy’s tariff compliance filing. Entergy Mississippi will continue to pay the allocated sale-leaseback renewal costs of approximately $5.7 million annually and there are no refunds due for prior periods. In March 2025, System Energy filed a status report with the FERC explaining that the dispute is resolved. In April 2025 the FERC accepted System Energy’s tariff compliance filing.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

System Energy Settlement with the LPSC

As discussed in the Form 10-K, in 2024, System Energy reached a settlement with the LPSC to globally resolve all of the LPSC’s actual and potential claims in multiple docketed proceedings pending before the FERC (including all docketed proceedings resolved by the MPSC, the APSC, and the City Council settlements) and associated with System Energy’s past implementation of the Unit Power Sales Agreement. In compliance with the settlement, in May 2025, System Energy, Entergy Louisiana, and Entergy Mississippi submitted the following filings with the FERC: (1) a Federal Power Act Section 203 application seeking approval for the permanent divestiture by Entergy Louisiana to Entergy Mississippi of its rights to capacity and energy from Grand Gulf; and (2) a Federal Power Act Section 205 application seeking approval to modify the entitlement percentages of the remaining purchasers under the Unit Power Sales Agreement in connection with the foregoing divestiture. In July 2025, the FERC issued an order accepting the Federal Power Act Section 205 application to remove Entergy Louisiana as a party to the Unit Power Sales Agreement. As a result of the order, the Unit Power Sales Agreement entitlement percentages of the remaining purchasers will be permanently modified to exclude Entergy Louisiana, to be effective beginning October 2025. The FERC also issued an order dismissing the Federal Power Act Section 203 application based on lack of jurisdiction.

Storm Cost Recovery Filings with Retail Regulators

See Note 2 to the financial statements in the Form 10-K for discussion regarding storm cost recovery filings. The following is an update to that discussion.

Entergy Louisiana

Hurricane Francine

In September 2024, Hurricane Francine caused damage to the areas served by Entergy Louisiana. The storm resulted in widespread power outages, primarily due to damage to distribution infrastructure as a result of strong winds and heavy rain, and the loss of sales during the power outages.

In December 2024, and subsequently amended in an errata filed in February 2025, Entergy Louisiana submitted an application to the LPSC seeking a determination that approximately $183.6 million in storm restoration costs associated with Hurricane Francine were reasonable and necessary and, therefore, eligible for recovery from customers, as well as approval to recover approximately $3.6 million in certain carrying costs from customers. In February 2025, Entergy Louisiana filed a second interim rate adjustment for the 2023 test year reflecting a revenue increase of $17.8 million from funds approved by the LPSC (on an interim basis) for Hurricane Francine recovery costs. The second interim rate adjustment was implemented with the first billing cycle of March 2025. See further discussion of the 2023 formula rate plan filing above. Also in February 2025, Entergy Louisiana withdrew $33.5 million from its funded storm reserves. In June 2025 the LPSC staff filed direct testimony. The LPSC staff recommends approval of Entergy Louisiana’s as-requested storm restoration costs with the exception of approximately $10.6 million, comprised primarily of estimates of mutual assistance invoices that have not yet been received at the time of filing and that ultimately exceeded the actual amounts invoiced, as well as certain incentive compensation, and $1.8 million associated with certain carrying costs. Entergy Louisiana’s rebuttal testimony is due in August 2025 and a hearing is scheduled for November 2025.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

NOTE 3. EQUITY (Entergy Corporation and Entergy Louisiana)

Common Stock

Earnings per Share

Historical share and share-based data presented in the accompanying financial statements has been retroactively adjusted to reflect the two-for-one forward stock split of Entergy Corporation common stock effective December 12, 2024. See Note 7 to the financial statements in the Form 10-K for discussion of the stock split.

The following tables present Entergy’s basic and diluted earnings per share calculations for the three and six months ended June 30, 2025 and 2024, included on the consolidated income statements:

Dollars In Thousands, Except Per Share Data; Shares in Millions

View SEC source
Line itemFor the Three Months Ended June 30, 2024For the Three Months Ended June 30, 2024$/share
Consolidated net income$51,732
Less: Preferred dividend requirements of subsidiaries and noncontrolling interests2,810
Net income attributable to Entergy Corporation
Basic shares and earnings per average common share
Average dilutive effect of:
Stock options0.6
Other equity plans1.0
Equity forwards
Diluted shares and earnings per average common share

Dollars In Thousands, Except Per Share Data; Shares in Millions

View SEC source
Line itemFor the Six Months Ended June 30, 2024For the Six Months Ended June 30, 2024$/share
Consolidated net income$128,268
Less: Preferred dividend requirements of subsidiaries and noncontrolling interests4,065
Net income attributable to Entergy Corporation
Basic shares and earnings per average common share
Average dilutive effect of:
Stock options0.5
Other equity plans1.0
Equity forwards
Diluted shares and earnings per average common share

Earnings per share dilution resulting from stock options outstanding and other equity plans is determined under the treasury stock method. The calculation of diluted earnings per share excluded 366,136 stock options

Entergy Corporation and Subsidiaries

Notes to Financial Statements

outstanding for the three months ended June 30, 2025 and 1,448,982 stock options outstanding for the three months ended June 30, 2024 because their effect would have been antidilutive. The calculation of diluted earnings per share excluded 305,113 stock options outstanding for the six months ended June 30, 2025 and 1,471,220 stock options outstanding for the six months ended June 30, 2024 because their effect would have been antidilutive. Until settlement of the forward sale agreements discussed below in “Equity Distribution Program” and “Equity Forward Sale Agreements,” earnings per share dilution resulting from the agreements, if any, is determined under the treasury stock method. Share dilution occurs when the average market price of Entergy Corporation’s common stock is higher than the average forward sales price. The calculation of diluted earnings per share excluded 2,423,880 shares for the three months ended June 30, 2025 and 2,897,964 shares for the three months ended June 30, 2024 under forward sale agreements outstanding because their effect would have been antidilutive. The calculation of diluted earnings per share excluded 1,304,889 shares for the six months ended June 30, 2025 and 2,942,440 shares for the six months ended June 30, 2024 under forward sale agreements outstanding because their effect would have been antidilutive.

Entergy’s stock options and other equity compensation plans are discussed in Note 5 to the financial statements herein and in Note 12 to the financial statements in the Form 10-K.

Dividends declared per common share were for the three months ended June 30, 2025 and for the three months ended June 30, 2024. Dividends declared per common share were for the six months ended June 30, 2025 and for the six months ended June 30, 2024.

(System Energy)

In February 2025, System Energy paid its parent, Entergy Corporation, a $20 million distribution out of its common stock.

In May 2025, System Energy paid its parent, Entergy Corporation, a $30 million distribution out of its common stock.

Equity Distribution Program

See Note 7 to the financial statements in the Form 10-K for discussion of Entergy Corporation’s at the market equity distribution program. The following are updates to that discussion.

In February 2025, Entergy Corporation increased by an additional $1.5 billion the aggregate gross sales price authorized under its at the market equity distribution program pursuant to the terms of the equity distribution sales agreement for such program. The aggregate number of shares of common stock sold under this sales agreement and under any forward sale agreement may not exceed an aggregate gross sales price of $4.5 billion. As of June 30, 2025, an aggregate gross sales price of approximately $2.8 billion has been sold under the at the market equity distribution program.

During the six months ended June 30, 2025 and 2024, there were no shares of common stock directly issued under the at the market equity distribution program.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The following forward sale agreements were entered into by Entergy Corporation under its at the market equity distribution program during the six months ended June 30, 2025:

Effective DateShares of Common Stock per Forward Sale AgreementMaturity DateForward Sale Price per ShareGross Sales PriceForward Sellers Fees
(Dollars In Thousands, Except Per Share Data)
March 20252,713,790August 2026$84.77$232,216$2,322

During the six months ended June 30, 2025, Entergy Corporation physically settled its obligations under the following forward sale agreements:

Line itemEffective Date of Forward Sale AgreementsShares of Common Stock IssuedGross Sales PriceForward Sellers FeesForward Sale Price per ShareCash Proceeds at Settlement
(Dollars In Thousands, Except Per Share Data)
Forward sale agreements settled in May 2025:
December 20235,506,492$280,459$2,805
March 2024569,844$29,318$293
March 20242,320,830$119,153$1,192
May 20242,556,832$142,387$1,424
May 20242,466,470$134,396$1,344
June 20242,140,006$114,540$1,145
Total15,560,474$51.78$805,669

Entergy Corporation incurred an aggregate amount of approximately $1.0 million of general issuance costs associated with the May 2025 settlement. Entergy Corporation used the net proceeds for general corporate purposes, which included repayment of commercial paper, outstanding loans under Entergy Corporation’s revolving credit facility, and other debt.

Equity Forward Sale Agreements

In March 2025, Entergy marketed an equity offering of 17.8 million shares of Entergy Corporation common stock. In lieu of issuing equity at the time of the offering, Entergy entered into forward sale agreements with several forward counterparties. No amounts have been or will be recorded on Entergy’s balance sheet with respect to the equity offering until settlements of the forward sale agreements occur. The forward sale agreements require Entergy to, at its election on or prior to September 30, 2026, either (1) physically settle the transactions by issuing the total of 17.8 million shares of its common stock to the forward counterparties in exchange for net proceeds at the then-applicable forward sale price specified by the agreements (initially $81.87 per share) or (2) net settle the transactions in whole or in part through the delivery or receipt of cash or shares. The forward sale price is subject to adjustment on a daily basis based on a floating interest rate factor and will decrease by other fixed amounts specified in the agreements.

Until settlement of the forward sale agreements, earnings per share dilution resulting from the agreements, if any, will be determined under the treasury stock method. Share dilution occurs when the average market price of Entergy’s common stock is higher than the average forward sales price. If Entergy had elected to net share settle the forward sale agreements as of June 30, 2025, Entergy would have been required to deliver 0.2 million shares.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Treasury Stock

During the six months ended June 30, 2025, Entergy Corporation reissued shares of its previously repurchased common stock to satisfy stock option exercises, vesting of shares of restricted stock, and other stock-based awards. Entergy Corporation did not repurchase any of its common stock during the six months ended June 30, 2025.

Retained Earnings

On July 25, 2025, Entergy Corporation’s Board of Directors declared a common stock dividend of $0.60 per share, payable on September 2, 2025 to holders of record as of August 13, 2025.

Comprehensive Income

Accumulated other comprehensive income (loss) is included in the equity section of the balance sheets of Entergy and Entergy Louisiana. The following table presents changes in accumulated other comprehensive income (loss) for Entergy for the three months ended June 30, 2025 and 2024:

In Thousands

View SEC source
Line itemPension and Other Postretirement Plan Changes2025Pension and Other Postretirement Plan Changes2024
Beginning balance, April 1,$39,040($166,128)
Amounts reclassified from accumulated other comprehensive income (loss)()
Net other comprehensive income (loss) for the period()
Ending balance, June 30,$34,438$80,361

The following table presents changes in accumulated other comprehensive income (loss) for Entergy for the six months ended June 30, 2025 and 2024:

In Thousands

View SEC source
Line itemPension and Other Postretirement Plan Changes2025Pension and Other Postretirement Plan Changes2024
Beginning balance, January 1,$42,769($162,460)
Amounts reclassified from accumulated other comprehensive income (loss)()
Net other comprehensive income (loss) for the period()
Ending balance, June 30,$34,438$80,361

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The following table presents changes in accumulated other comprehensive income for Entergy Louisiana for the three months ended June 30, 2025 and 2024:

In Thousands

View SEC source
Line itemPension and Other Postretirement Plan Changes2025Pension and Other Postretirement Plan Changes2024
Beginning balance, April 1,$52,687$52,774
Amounts reclassified from accumulated other comprehensive income(2,132)(2,023)
Net other comprehensive loss for the period(2,132)(2,023)
Ending balance, June 30,$50,555$50,751

The following table presents changes in accumulated other comprehensive income for Entergy Louisiana for the six months ended June 30, 2025 and 2024:

In Thousands

View SEC source
Line itemPension and Other Postretirement Plan Changes2025Pension and Other Postretirement Plan Changes2024
Beginning balance, January 1,$53,658$54,798
Amounts reclassified from accumulated other comprehensive income(3,103)(4,047)
Net other comprehensive loss for the period(3,103)(4,047)
Ending balance, June 30,$50,555$50,751

Total reclassifications out of accumulated other comprehensive income (loss) (AOCI) for Entergy for the three months ended June 30, 2025 and 2024 are as follows:

In Thousands

View SEC source
Pension and other postretirement plan changesAmounts reclassified from AOCI2025Amounts reclassified from AOCI2024
Amortization of prior service credit$3,462$3,473
Amortization of net gain2,5511,641
Settlement loss(316,974)
Total amortization and settlement loss6,013(311,860)
Income taxes(1,411)65,371
Total amortization and settlement loss (net of tax)$4,602($246,489)
Total reclassifications for the period (net of tax)$4,602($246,489)

(a)These accumulated other comprehensive income (loss) components are included in the computation of net periodic pension and other postretirement cost. See Note 6 to the financial statements herein for additional details.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Total reclassifications out of accumulated other comprehensive income (loss) (AOCI) for Entergy for the six months ended June 30, 2025 and 2024 are as follows:

In Thousands

View SEC source
Pension and other postretirement plan changesAmounts reclassified from AOCI2025Amounts reclassified from AOCI2024
Amortization of prior service credit$6,924$6,946
Amortization of net gain5,1023,037
Settlement loss(316,974)
Total amortization and settlement loss12,026(306,991)
Income taxes(3,695)64,170
Total amortization and settlement loss (net of tax)$8,331($242,821)
Total reclassifications for the period (net of tax)$8,331($242,821)

(a)These accumulated other comprehensive income (loss) components are included in the computation of net periodic pension and other postretirement cost. See Note 6 to the financial statements herein for additional details.

Total reclassifications out of accumulated other comprehensive income (AOCI) for Entergy Louisiana for the three months ended June 30, 2025 and 2024 are as follows:

In Thousands

View SEC source
Pension and other postretirement plan changesAmounts reclassified from AOCI2025Amounts reclassified from AOCI2024
Amortization of prior service credit$1,136$1,136
Amortization of net gain1,7191,632
Total amortization2,8552,768
Income taxes(723)(745)
Total amortization (net of tax)2,1322,023
Total reclassifications for the period (net of tax)$2,132$2,023

(a)These accumulated other comprehensive income components are included in the computation of net periodic pension and other postretirement cost. See Note 6 to the financial statements herein for additional details.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Total reclassifications out of accumulated other comprehensive income (AOCI) for Entergy Louisiana for the six months ended June 30, 2025 and 2024 are as follows:

In Thousands

View SEC source
Pension and other postretirement plan changesAmounts reclassified from AOCI2025Amounts reclassified from AOCI2024
Amortization of prior service credit$2,272$2,272
Amortization of net gain3,4383,266
Total amortization5,7105,538
Income taxes(2,607)(1,491)
Total amortization (net of tax)$3,103$4,047
Total reclassifications for the period (net of tax)$3,103$4,047

(a)These accumulated other comprehensive income components are included in the computation of net periodic pension and other postretirement cost. See Note 6 to the financial statements herein for additional details.

NOTE 4. REVOLVING CREDIT FACILITIES, LINES OF CREDIT, SHORT-TERM BORROWINGS, AND LONG-TERM DEBT (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy Corporation has in place a credit facility that has a borrowing capacity of $3 billion and expires in June 2030. The facility includes fronting commitments for the issuance of letters of credit against $20 million of the total borrowing capacity of the credit facility. The commitment fee is currently 0.225% of the undrawn commitment amount. Commitment fees and interest rates on loans under the credit facility can fluctuate depending on the senior unsecured debt ratings of Entergy Corporation. As there were no borrowings under the facility for the six months ended June 30, 2025, the estimated interest rate as of June 30, 2025 that would have been applied to outstanding borrowings under the facility was 5.93%. The following is a summary of the amounts outstanding and capacity available under the credit facility as of June 30, 2025:

In Millions

View SEC source
CapacityBorrowingsLettersof CreditCapacity Available
$3,000$—$4$2,996

Entergy Corporation’s credit facility includes a covenant requiring Entergy to maintain a consolidated debt ratio, as defined, of 65% or less of its total capitalization. Entergy is in compliance with this covenant. If Entergy fails to meet this ratio, or if Entergy Corporation or one of the Registrant Subsidiaries (except Entergy New Orleans and System Energy) defaults on other indebtedness or is in bankruptcy or insolvency proceedings, an acceleration of the Entergy Corporation credit facility’s maturity date may occur.

Entergy Corporation has a commercial paper program with a Board-approved program limit of $2 billion. As of June 30, 2025, Entergy Corporation had $459 million of commercial paper outstanding. The weighted-average interest rate for the six months ended June 30, 2025 was 4.65%.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas each had credit facilities available as of June 30, 2025 as follows:

CompanyExpiration DateAmount of FacilityInterest Rate (a)Amount Drawnas of June 30, 2025Letters of Credit Outstanding as of June 30, 2025
Entergy ArkansasApril 2026$25 million (b)6.28%$—$—
Entergy ArkansasJune 2030$300 million (c)5.55%$—$—
Entergy LouisianaJune 2030$400 million (c)5.68%$—$—
Entergy MississippiJune 2030$300 million (c)5.55%$—$—
Entergy New OrleansJune 2027$25 million (c)6.05%$—$—
Entergy TexasJune 2030$300 million (c)5.68%$—$1.1 million

(a)The interest rate is the estimated interest rate as of June 30, 2025 that would have been applied to outstanding borrowings under the facility.

(b)Borrowings under this Entergy Arkansas credit facility may be secured by a security interest in its accounts receivable at Entergy Arkansas’s option.

(c)The credit facility includes fronting commitments for the issuance of letters of credit against a portion of the borrowing capacity of the facility as follows: $5 million for Entergy Arkansas; $15 million for Entergy Louisiana; $5 million for Entergy Mississippi; $10 million for Entergy New Orleans; and $25 million for Entergy Texas.

The commitment fees on the credit facilities range from 0.075% to 0.375% of the undrawn commitment amount for Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas, and of the entire facility amount for Entergy New Orleans. Each of the credit facilities requires the Registrant Subsidiary borrower to maintain a debt ratio, as defined, of 65% or less of its total capitalization. Each Registrant Subsidiary is in compliance with this covenant.

In addition, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas each has one or more uncommitted standby letter of credit facilities as a means to post collateral to support its obligations to MISO and for other purposes. In July 2025, Entergy Texas entered into a second uncommitted standby letter of credit facility in the amount of $160 million with a letter of credit fee of 1.05%. The following is a summary of the uncommitted standby letter of credit facilities as of June 30, 2025:

CompanyAmount of Uncommitted FacilityLetter of Credit FeeLetters of Credit Issued as of June 30, 2025 (a)
Entergy Arkansas$25 million0.78%$23.6 million
Entergy Arkansas$75 million0.50%$—
Entergy Louisiana$125 million0.78%$74.3 million
Entergy Louisiana$45 million0.50%$—
Entergy Mississippi$65 million0.78%$47.3 million (b)
Entergy Mississippi$65 million0.50%$—
Entergy New Orleans$1 million1.625%$0.5 million
Entergy Texas$150 million1.250%$54.0 million

(a)As of June 30, 2025, letters of credit posted with MISO covered financial transmission rights exposure of $3.5 million for Entergy Arkansas, $1.2 million for Entergy Louisiana, $0.6 million for Entergy Mississippi, and $0.6 million for Entergy Texas. See Note 8 to the financial statements herein for discussion of financial transmission rights.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

(b)As of June 30, 2025, the letters of credit issued for Entergy Mississippi include $46.0 million in MISO letters of credit and $1.3 million in non-MISO letters of credit outstanding under this facility.

The short-term borrowings of the Registrant Subsidiaries are limited to amounts authorized by the FERC. Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy have FERC-authorized short-term borrowing limits effective through January 2027. In addition to borrowings from commercial banks, these companies may also borrow from the Entergy system money pool and from other internal short-term borrowing arrangements. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and the other internal borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings. Borrowings from internal and external short-term borrowings combined may not exceed the FERC-authorized limits. The following are the FERC-authorized limits for short-term borrowings and the outstanding short-term borrowings as of June 30, 2025 (aggregating both internal and external short-term borrowings) for the Registrant Subsidiaries:

In Millions

View SEC source
Line itemAuthorizedBorrowings
Entergy Arkansas$250$—
Entergy Louisiana$450$—
Entergy Mississippi$200$—
Entergy New Orleans$150$21
Entergy Texas$200$—
System Energy$200$—

Variable Interest Entities (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, and System Energy)

See Note 17 to the financial statements in the Form 10-K for a discussion of the consolidation of the nuclear fuel company variable interest entities (VIEs). To finance the acquisition and ownership of nuclear fuel, the nuclear fuel company VIEs have credit facilities and three of the four VIEs also issue commercial paper, details of which follow as of June 30, 2025:

CompanyExpiration DateAmountof FacilityWeighted- Average Interest Rate on Borrowings (a)Amount Outstanding as of June 30, 2025
(Dollars in Millions)
Entergy Arkansas VIEJune 2027$805.44%$33.2
Entergy Louisiana River Bend VIEJune 2027$1055.42%$69.5
Entergy Louisiana Waterford VIEJune 2027$1055.43%$61.0
System Energy VIEJune 2027$1205.43%$44.3

(a)Includes letter of credit fees and bank fronting fees on commercial paper issuances by the nuclear fuel company VIEs for Entergy Arkansas, Entergy Louisiana, and System Energy. The nuclear fuel company VIE for Entergy Louisiana River Bend does not issue commercial paper, but borrows directly on its bank credit facility.

The commitment fees on the credit facilities are 0.100% of the undrawn commitment amount for the Entergy Arkansas, Entergy Louisiana, and System Energy VIEs. Each credit facility requires the respective lessee of nuclear fuel (Entergy Arkansas, Entergy Louisiana, or Entergy Corporation as guarantor for System Energy) to maintain a consolidated debt ratio, as defined, of 70% or less of its total capitalization. Each lessee is in compliance with this covenant.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The nuclear fuel company VIEs had notes payable that were included in debt on the respective balance sheets as of June 30, 2025 as follows:

CompanyDescriptionAmount
Entergy Arkansas VIE1.84% Series N due July 2026$90 million
Entergy Arkansas VIE5.54% Series O due May 2029$70 million
Entergy Louisiana River Bend VIE2.51% Series V due June 2027$70 million
Entergy Louisiana Waterford VIE5.94% Series J due September 2026$70 million
System Energy VIE2.05% Series K due September 2027$90 million

In accordance with regulatory treatment, interest on the nuclear fuel company VIEs’ credit facilities, commercial paper, and long-term notes payable is reported in fuel expense.

As of June 30, 2025, Entergy Arkansas, Entergy Louisiana, and System Energy each has obtained financing authorization from the FERC that extends through January 2027 for issuances by its nuclear fuel company VIEs.

Debt Issuances and Retirements

(Entergy Arkansas)

In May 2025, Entergy Arkansas issued $300 million of 5.45% Series mortgage bonds due June 2034. Entergy Arkansas expects to use the proceeds, together with other funds, to finance the construction of Lake Catherine Unit 5, and for general corporate purposes.

(Entergy Louisiana)

In January 2025, Entergy Louisiana issued $750 million of 5.80% Series mortgage bonds due March 2055. Entergy Louisiana used the proceeds, together with other funds: (1) to repay, prior to maturity, its $190 million of 3.78% Series mortgage bonds due April 2025; (2) to repay, prior to maturity, its $110 million of 3.78% Series mortgage bonds due April 2025; (3) for capital expenditures; and (4) for general corporate purposes.

(Entergy Mississippi)

In March 2025, Entergy Mississippi issued $600 million of 5.80% Series mortgage bonds due April 2055. Entergy Mississippi expects to use the proceeds, together with other funds, to finance a portion of the construction of the Delta Blues Advanced Power Station, the Delta Solar facility, and the Penton Solar facility, and for general corporate purposes.

(Entergy New Orleans)

In February 2025, Entergy New Orleans entered into a term loan credit agreement providing a $80 million unsecured term loan due March 2026. The term loan bears interest at a variable interest rate based on an adjusted term Secured Overnight Financing Rate plus the applicable adjustment. The rate set as of June 30, 2025 was 5.79%. Entergy New Orleans received the funds in March 2025 and used the proceeds to repay, at maturity, its $78 million of 3.00% Series mortgage bonds due March 2025 and for general corporate purposes. The term loan was subsequently repaid, prior to its maturity, in July 2025.

(Entergy Texas)

In February 2025, Entergy Texas issued $500 million of 5.25% Series mortgage bonds due April 2035. Entergy Texas expects to use the proceeds, together with other funds, to finance the construction of the Orange County Advanced Power Station and the Lone Star Power Station, and for general corporate purposes.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

(System Energy)

In May 2025, System Energy issued $240 million of 5.30% Series mortgage bonds due December 2034. System Energy used the proceeds, together with other funds, to repay, prior to maturity, its $200 million of 2.14% Series mortgage bonds due December 2025, and for general corporate purposes.

Fair Value

The book value and the fair value of long-term debt for Entergy and the Registrant Subsidiaries as of June 30, 2025 were as follows:

In Thousands

View SEC source
Line itemBook Valueof Long-Term DebtFair Valueof Long-Term Debt (a)
Entergy$29,929,838
Entergy Arkansas$5,438,033$4,883,114
Entergy Louisiana$10,399,823$9,410,962
Entergy Mississippi$3,020,687$2,720,374
Entergy New Orleans$737,560$697,241
Entergy Texas$4,038,417$3,729,255
System Energy$1,094,396$1,101,434

(a)Fair values were classified as Level 2 in the fair value hierarchy discussed in Note 8 to the financial statements herein.

The book value and the fair value of long-term debt for Entergy and the Registrant Subsidiaries as of December 31, 2024 were as follows:

In Thousands

View SEC source
Line itemBook Valueof Long-Term DebtFair Valueof Long-Term Debt (a)
Entergy$27,991,595
Entergy Arkansas$5,122,494$4,546,643
Entergy Louisiana$9,866,453$8,751,266
Entergy Mississippi$2,427,073$2,116,246
Entergy New Orleans$735,467$697,466
Entergy Texas$3,552,443$3,176,230
System Energy$1,089,736$1,063,946

(a)Fair values were classified as Level 2 in the fair value hierarchy discussed in Note 8 to the financial statements herein.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

NOTE 5. STOCK-BASED COMPENSATION (Entergy Corporation)

Entergy grants stock and stock-based awards, which are described more fully in Note 12 to the financial statements in the Form 10-K. Awards under Entergy’s plans generally vest over three years.

Stock Options

In February 2025 the Board approved and Entergy granted long-term incentive awards in the form of options on 366,136 shares of its common stock under the 2019 Omnibus Incentive Plan with a fair value of $17.43 per option. As of June 30, 2025, there were options on 3,132,728 shares of common stock outstanding with a weighted-average exercise price of $56.71. The intrinsic value, which has no effect on net income, of the outstanding stock options is calculated by the positive difference between the weighted-average exercise price of the stock options granted and Entergy Corporation’s common stock price as of June 30, 2025. The aggregate intrinsic value of the stock options outstanding as of June 30, 2025 was $78.6 million.

The following table includes financial information for stock options for the three months ended June 30, 2025 and 2024:

In Millions

View SEC source
Line item20252024
Compensation expense included in Entergy’s consolidated net income$1.0$1.1
Tax benefit recognized in Entergy’s consolidated net income$0.2$0.3
Compensation cost capitalized as part of fixed assets and materials and supplies$0.5$0.5

The following table includes financial information for stock options for the six months ended June 30, 2025 and 2024:

In Millions

View SEC source
Line item20252024
Compensation expense included in Entergy’s consolidated net income$2.1$2.2
Tax benefit recognized in Entergy’s consolidated net income$0.5$0.6
Compensation cost capitalized as part of fixed assets and materials and supplies$1.0$1.0

Other Equity Awards

In February 2025 the Board approved and Entergy granted long-term incentive awards in the form of 510,009 restricted stock awards and 187,036 performance units under the 2019 Omnibus Incentive Plan. The restricted stock awards were made effective on February 6, 2025 and were valued at $82.79 per share, which was the closing price of Entergy Corporation’s common stock on the grant date. Shares of restricted stock have the same dividend and voting rights as other common stock, are considered issued and outstanding shares of Entergy upon vesting, and are expensed ratably over the three-year vesting period. One-third of the restricted stock awards and accrued dividends will vest upon each anniversary of the grant date.

The performance units represent the value of, and are settled with, one share of Entergy Corporation common stock at the end of the three-year performance period, plus dividends accrued during the performance period on the number of performance units earned. To emphasize the importance of environmental stewardship, specifically of carbon-free generation and resilience, an environmental achievement measure was selected as one of the performance measures for the 2025-2027 performance period. For the 2025-2027 performance period, performance will be measured based eighty percent on relative total shareholder return and twenty percent on the environmental achievement measure. The performance units were granted on February 6, 2025 and eighty percent

Entergy Corporation and Subsidiaries

Notes to Financial Statements

were valued at $115.13 per share based on various factors, primarily market conditions; and twenty percent were valued at $82.79 per share, the closing price of Entergy Corporation’s common stock on the grant date. Performance units have the same dividend and voting rights as other common stock, are considered issued and outstanding shares of Entergy upon vesting, and are expensed ratably over the three-year vesting period, and compensation cost for the portion of the award based on the selected environmental achievement measure will be adjusted based on the number of units that ultimately vest. See Note 12 to the financial statements in the Form 10-K for a description of the Long-Term Performance Unit Program.

The following table includes financial information for other outstanding equity awards for the three months ended June 30, 2025 and 2024:

In Millions

View SEC source
Line item20252024
Compensation expense included in Entergy’s consolidated net income$9.4$9.8
Tax benefit recognized in Entergy’s consolidated net income$2.3$2.5
Compensation cost capitalized as part of fixed assets and materials and supplies$4.7$4.6

The following table includes financial information for other equity awards for the six months ended June 30, 2025 and 2024:

In Millions

View SEC source
Line item20252024
Compensation expense included in Entergy’s consolidated net income$19.4$19.7
Tax benefit recognized in Entergy’s consolidated net income$4.8$5.0
Compensation cost capitalized as part of fixed assets and materials and supplies$9.5$9.1

NOTE 6. RETIREMENT AND OTHER POSTRETIREMENT BENEFITS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Components of Qualified Net Pension Cost

Entergy’s qualified pension costs, including amounts capitalized, for the second quarters of 2025 and 2024, included the following components:

In Thousands

View SEC source
Line item20252024
Service cost - benefits earned during the period$23,617$23,370
Interest cost on projected benefit obligation59,68065,961
Expected return on assets(75,280)(89,506)
Recognized net loss13,30914,854
Settlement charges325,253
Net pension cost$21,326$339,932

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Entergy’s qualified pension costs, including amounts capitalized, for the six months ended June 30, 2025 and 2024, included the following components:

In Thousands

View SEC source
Line item20252024
Service cost - benefits earned during the period$47,234$46,746
Interest cost on projected benefit obligation119,360136,587
Expected return on assets(150,560)(185,486)
Recognized net loss26,61829,974
Settlement charges325,253
Net pension cost$42,652$353,074

The Registrant Subsidiaries’ qualified pension costs, including amounts capitalized, for their current and former employees for the second quarters of 2025 and 2024, included the following components:

In Thousands

View SEC source
2025Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasSystem Energy
Service cost - benefits earned during the period$4,427$5,454$1,304$411$1,024$1,372
Interest cost on projected benefit obligation13,81414,7043,6991,6472,9733,585
Expected return on assets(17,676)(18,897)(4,949)(2,174)(3,889)(4,575)
Recognized net loss4,7912,2688224154541,114
Net pension cost$5,356$3,529$876$299$562$1,496

In Thousands

View SEC source
2024Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasSystem Energy
Service cost - benefits earned during the period$4,100$5,551$1,284$440$962$1,383
Interest cost on projected benefit obligation13,21713,9613,5211,5692,8313,386
Expected return on assets(18,155)(19,447)(5,113)(2,203)(4,077)(4,633)
Recognized net loss5,7462,6021,1404703931,162
Settlement charges611
Net pension cost$4,908$2,667$832$276$109$1,909

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The Registrant Subsidiaries’ qualified pension costs, including amounts capitalized, for their current and former employees for the six months ended June 30, 2025 and 2024, included the following components:

In Thousands

View SEC source
2025Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasSystem Energy
Service cost - benefits earned during the period$8,854$10,908$2,608$822$2,048$2,744
Interest cost on projected benefit obligation27,62829,4087,3983,2945,9467,170
Expected return on assets(35,352)(37,794)(9,898)(4,348)(7,778)(9,150)
Recognized net loss9,5824,5361,6448309082,228
Net pension cost$10,712$7,058$1,752$598$1,124$2,992

In Thousands

View SEC source
2024Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasSystem Energy
Service cost - benefits earned during the period$8,199$11,102$2,568$880$1,923$2,767
Interest cost on projected benefit obligation26,43427,9227,0423,1385,6626,777
Expected return on assets(36,310)(38,894)(10,226)(4,407)(8,154)(9,281)
Recognized net loss11,4925,2042,2809407862,327
Settlement charges611
Net pension cost$9,815$5,334$1,664$551$217$3,201

Non-Qualified Net Pension Cost

Entergy recognized $2.5 million and $2.7 million in pension cost for its non-qualified pension plans for the second quarters of 2025 and 2024, respectively. For the second quarters of 2025 and 2024, there were no settlement charges related to the payment of lump sum benefits out of the plan. Entergy recognized $5 million and $5.4 million in pension cost for its non-qualified pension plans for the six months ended June 30, 2025 and 2024, respectively. For the six months ended June 30, 2025 and 2024, there were no settlement charges related to the payment of lump sum benefits out of the plan.

The Registrant Subsidiaries recognized the following pension cost for their current and former employees for their non-qualified pension plans for second quarters of 2025 and 2024:

In Thousands

View SEC source
Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
2025$47$36$90$35$39
2024$68$51$83$31$62

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The Registrant Subsidiaries recognized the following pension cost for their current and former employees for their non-qualified pension plans for the six months ended June 30, 2025 and 2024:

In Thousands

View SEC source
Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
2025$94$72$180$70$78
2024$136$102$166$61$124

For the second quarters of 2025 and 2024, there were no settlement charges for the Registrant Subsidiaries related to the payment of lump sums benefits out of the plan. For the six months ended June 30, 2025 and 2024 there were no settlement charges for the Registrant Subsidiaries related to the payment of lump sum benefits out of the plan.

Components of Net Other Postretirement Benefits Income

Entergy’s other postretirement benefits income, including amounts capitalized, for the second quarters of 2025 and 2024, included the following components:

In Thousands

View SEC source
Line item20252024
Service cost - benefits earned during the period$2,757$3,126
Interest cost on accumulated postretirement benefit obligation (APBO)9,6909,852
Expected return on assets(10,209)(10,569)
Amortization of prior service credit(5,720)(5,720)
Recognized net gain(3,870)(2,761)
Net other postretirement benefits income($7,352)($6,072)

Entergy’s other postretirement benefits income, including amounts capitalized, for the six months ended June 30, 2025 and 2024, included the following components:

In Thousands

View SEC source
Line item20252024
Service cost - benefits earned during the period$5,514$6,252
Interest cost on APBO19,38019,704
Expected return on assets(20,418)(21,138)
Amortization of prior service credit(11,440)(11,440)
Recognized net gain(7,740)(5,522)
Net other postretirement benefits income($14,704)($12,144)

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The Registrant Subsidiaries’ other postretirement benefits income, including amounts capitalized, for their current and former employees for the second quarters of 2025 and 2024 included the following components:

In Thousands

View SEC source
2025Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasSystem Energy
Service cost - benefits earned during the period$572$671$162$52$159$174
Interest cost on APBO1,7752,012489249582394
Expected return on assets(4,225)(1,328)(1,445)(2,452)(702)
Amortization of prior service cost (credit)524(1,136)(239)(229)(1,093)(73)
Recognized net (gain) loss(353)(1,811)(57)(27)153(7)
Net other postretirement benefits income($1,707)($264)($973)($1,400)($2,651)($214)

In Thousands

View SEC source
2024Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasSystem Energy
Service cost - benefits earned during the period$642$700$184$51$168$175
Interest cost on APBO1,8331,999486253603398
Expected return on assets(4,384)(1,372)(1,479)(2,539)(728)
Amortization of prior service cost (credit)524(1,136)(239)(229)(1,093)(73)
Recognized net (gain) loss(1,738)1519148
Net other postretirement benefits income($1,385)($175)($926)($1,385)($2,713)($228)

The Registrant Subsidiaries’ other postretirement benefits income, including amounts capitalized, for their current and former employees for the six months ended June 30, 2025 and 2024 included the following components:

In Thousands

View SEC source
2025Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasSystem Energy
Service cost - benefits earned during the period$1,144$1,342$324$104$318$348
Interest cost on APBO3,5504,0249784981,164788
Expected return on assets(8,450)(2,656)(2,890)(4,904)(1,404)
Amortization of prior service cost (credit)1,048(2,272)(478)(458)(2,186)(146)
Recognized net (gain) loss(706)(3,622)(114)(54)306(14)
Net other postretirement benefits income($3,414)($528)($1,946)($2,800)($5,302)($428)

Entergy Corporation and Subsidiaries

Notes to Financial Statements

In Thousands

View SEC source
2024Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasSystem Energy
Service cost - benefits earned during the period$1,284$1,400$368$102$336$350
Interest cost on APBO3,6663,9989725061,206796
Expected return on assets(8,768)(2,744)(2,958)(5,078)(1,456)
Amortization of prior service cost (credit)1,048(2,272)(478)(458)(2,186)(146)
Recognized net (gain) loss(3,476)3038296
Net other postretirement benefits income($2,770)($350)($1,852)($2,770)($5,426)($456)

Reclassification out of Accumulated Other Comprehensive Income (Loss)

Entergy and Entergy Louisiana reclassified the following costs out of accumulated other comprehensive income (loss) (before taxes and including amounts capitalized) for the second quarters of 2025 and 2024:

2025Qualified Pension CostsOther Postretirement CostsNon-Qualified Pension CostsTotal
(In Thousands)
Entergy
Amortization of prior service credit (cost)$—$3,493($31)
Amortization of net gain (loss)(411)3,070(108)
($411)$6,563($139)$6,013
Entergy Louisiana
Amortization of prior service credit$—$1,136$—$1,136
Amortization of net gain (loss)(91)1,811(1)1,719
($91)$2,947($1)$2,855
2024Qualified Pension CostsOther Postretirement CostsNon-Qualified Pension CostsTotal
(In Thousands)
Entergy
Amortization of prior service credit (cost)$—$3,513($40)
Amortization of net gain (loss)(894)2,615(80)
Settlement loss(316,974)(316,974)
($317,868)$6,128($120)($311,860)
Entergy Louisiana
Amortization of prior service credit$—$1,136$—$1,136
Amortization of net gain (loss)(104)1,738(2)1,632
($104)$2,874($2)$2,768

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Entergy and Entergy Louisiana reclassified the following costs out of accumulated other comprehensive income (loss) (before taxes and including amounts capitalized) for the six months ended June 30, 2025 and 2024:

2025Qualified Pension CostsOther Postretirement CostsNon-Qualified Pension CostsTotal
(In Thousands)
Entergy
Amortization of prior service credit (cost)$—$6,986($62)
Amortization of net gain (loss)(822)6,140(216)
($822)$13,126($278)$12,026
Entergy Louisiana
Amortization of prior service credit$—$2,272$—$2,272
Amortization of net gain (loss)(182)3,622(2)3,438
($182)$5,894($2)$5,710
2024Qualified Pension CostsOther Postretirement CostsNon-Qualified Pension CostsTotal
(In Thousands)
Entergy
Amortization of prior service credit (cost)$—$7,026($80)
Amortization of net gain (loss)(2,033)5,230(160)
Settlement loss(316,974)(316,974)
($319,007)$12,256($240)($306,991)
Entergy Louisiana
Amortization of prior service credit$—$2,272$—$2,272
Amortization of net gain (loss)(208)3,476(2)3,266
($208)$5,748($2)$5,538

Accounting for Pension and Other Postretirement Benefits

In accordance with accounting standards, the other components of net benefit cost are required to be presented in the income statement separately from the service cost component and outside a subtotal of income from operations and are presented by Entergy in miscellaneous - net in other income.

See Note 11 to the financial statements in the Form 10-K for further discussion of pension and other postretirement benefits costs.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Employer Contributions

Based on current assumptions, Entergy expects to contribute $240 million to its qualified pension plans in 2025. As of June 30, 2025, Entergy had contributed $99.7 million to its pension plans. Based on current assumptions, the Registrant Subsidiaries expect to contribute the following to qualified pension plans for their current and former employees in 2025:

In Thousands

View SEC source
Line itemEntergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy TexasSystem Energy
Expected 2025 pension contributions$35,544$41,253$8,064$5,016$7,725$15,668
Pension contributions made through June 2025$16,968$17,448$3,951$2,112$3,240$6,413
Remaining estimated pension contributions to be made in 2025$18,576$23,805$4,113$2,904$4,485$9,255

NOTE 7. BUSINESS SEGMENT INFORMATION (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Entergy has a single reportable segment, Utility, which includes the generation, transmission, distribution, and sale of electric power in portions of Arkansas, Mississippi, Texas, and Louisiana, including the City of New Orleans; and operation of a small natural gas distribution business in portions of Louisiana through June 30, 2025. See Note 13 to the financial statements herein for discussion of the sale of the natural gas distribution business on July 1, 2025. Parent & Other includes the parent company, Entergy Corporation, and other business activity, including Entergy’s non-utility operations business, which is an operating segment that does not meet the quantitative thresholds for determining reportable segments.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The following table includes operating revenues and significant expense categories regularly provided to the chief operating decision maker for the Utility segment, a reconciliation of Utility operating revenues to Entergy’s consolidated operating revenues, and a reconciliation of Utility net income to consolidated net income and net income attributable to Entergy Corporation for the three and six months ended June 30, 2025 and 2024:

In Thousands · In Thousands

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
Utility operating revenues$3,315,723$2,941,404$6,145,320$5,713,577
Reconciliation of revenues:
Other revenues (a)13,14412,22730,44834,703
Elimination of intersegment revenues(18)(11)(45)(32)
Consolidated operating revenues3,328,8492,953,6206,175,7235,748,248
Less Utility expenses and other items:
Fuel, fuel-related expenses, and gas purchased for resale631,773514,223970,7561,118,627
Purchased power372,842193,010714,926412,204
Other operation and maintenance expenses713,296685,9901,375,7701,366,705
Other regulatory charges (credits) - net(55,957)125,607(72,800)234,954
Other Utility items (b)1,051,596979,2552,063,4531,941,788
Utility net income602,173443,3191,093,215639,299
Reconciliation of net income:
Non-cash pension settlement charge (c)(316,738)(316,738)
Income taxes on reconciling item noted above66,51566,515
Other loss(55,678)(62,479)(109,050)(102,362)
Elimination of intersegment loss(74,541)(78,885)(149,789)(158,446)
Consolidated net income471,95451,732834,376128,268
Preferred dividend requirements of subsidiaries and noncontrolling interests (d)4,0242,8105,6864,065
Net income attributable to Entergy Corporation

(a)See Note 12 to the financial statements herein and Note 19 to the financial statements in the Form 10-K for discussion of other revenues.

(b)Other Utility items includes nuclear refueling outage expenses, asset write-offs, decommissioning expenses, taxes other than income taxes, depreciation and amortization expenses, other income, interest expense, and income tax expense.

(c)See Note 11 to the financial statements in the Form 10-K for discussion of the one-time non-cash pension settlement charge resulting from a group annuity contract purchased in second quarter 2024 to settle certain pension liabilities, of which $8 million was recorded at Utility and $317 million was recorded at Parent & Other.

(d)Preferred dividend requirements of subsidiaries and noncontrolling interests is substantially derived from the Utility segment. See Note 6 to the financial statements in the Form 10-K for discussion of preferred stock and noncontrolling interests.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The following table presents segment financial information for Entergy’s single reportable segment, Utility, and a reconciliation to the corresponding consolidated amounts for Entergy Corporation for the three months ended June 30, 2025 and 2024:

In Thousands

View SEC source
Line itemUtilityParent & OtherEliminationsConsolidated
2025
Depreciation, amortization, and decommissioning$577,386$1,766$—$579,152
Interest and investment income$160,248$2,146($74,975)
Interest expense$261,033$61,475($434)$322,074
Income taxes$152,836($14,437)$—
2024
Depreciation, amortization, and decommissioning$557,962$1,594$—$559,556
Interest and investment income$141,249$9,985($80,647)
Interest expense$225,511$65,829($1,763)$289,577
Income taxes$113,017($79,383)$—

The following table presents segment financial information for Entergy’s single reportable segment, Utility, and a reconciliation to the corresponding consolidated amounts for Entergy Corporation for the six months ended June 30, 2025 and 2024:

In Thousands

View SEC source
Line itemUtilityParent & OtherEliminationsConsolidated
2025
Depreciation, amortization, and decommissioning$1,144,573$3,451$—$1,148,024
Interest and investment income$267,423$3,835($150,433)
Interest expense$528,164$124,344($643)$651,865
Income taxes$267,109($28,669)$—
Total assets as of June 30, 2025$72,511,224$777,674($4,905,758)$68,383,140
Total expenditures for additions to long-lived assets$3,798,452$606$—$3,799,058
2024
Asset write-offs, impairments, and related charges (credits)$131,775$—$—
Depreciation, amortization, and decommissioning$1,109,452$3,146$—$1,112,598
Interest and investment income$366,499$15,353($160,569)
Interest expense$437,659$121,242($2,124)$556,777
Income taxes$147,565($92,938)$—
Total assets as of December 31, 2024$68,951,564$721,459($4,882,991)$64,790,032
Total expenditures for additions to long-lived assets$2,457,683$693$—$2,458,376

Eliminations are primarily intersegment activity. All of Entergy’s goodwill is related to the Utility segment.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Registrant Subsidiaries

Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas each has one operating and reportable segment, an integrated utility business which includes the generation, transmission, and distribution of electric power; and operation of a small natural gas distribution business at each of Entergy Louisiana and Entergy New Orleans through June 30, 2025. See Note 13 to the financial statements herein for discussion of the sale of the Entergy New Orleans and Entergy Louisiana natural gas distribution businesses on July 1, 2025. System Energy has one operating and reportable segment, which is an electricity generation business. Each of the Registrant Subsidiaries’ operations are managed on an integrated basis by that company because of the substantial effect of cost-based rates and regulatory oversight on the business process, cost structures, and operating results. All segment financial information for the Registrant Subsidiaries is as reported on the respective financial statements for each of the Registrant Subsidiaries.

NOTE 8. RISK MANAGEMENT AND FAIR VALUES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Market Risk

In the normal course of business, Entergy is exposed to a number of market risks. Market risk is the potential loss that Entergy may incur as a result of changes in the market or fair value of a particular commodity or instrument. All financial and commodity-related instruments, including derivatives, are subject to market risk including commodity price risk, equity price, and interest rate risk. Entergy uses derivatives primarily to mitigate commodity price risk associated with the price of fuel.

The Utility has limited exposure to the effects of market risk because it operates primarily under cost-based rate regulation. To the extent approved by their retail regulators, the Utility operating companies use commodity and financial instruments to hedge the exposure to price volatility inherent in their purchased power, fuel, and gas purchased for resale costs, that are recovered from customers.

Derivatives

Entergy designates a significant portion of its derivative instruments as normal purchase/normal sale transactions due to their physical settlement provisions, including power purchase and sales agreements, fuel purchase agreements, and capacity contracts. Certain derivative instruments do not qualify for designation as normal purchase/normal sale transactions due to their financial settlement provisions. See further discussion below regarding the accounting for these derivative instruments.

Entergy manages fuel price volatility for its Louisiana jurisdictions (Entergy Louisiana and Entergy New Orleans) and Entergy Mississippi through the purchase of natural gas swaps that financially settle against either the average Henry Hub Gas Daily prices or the NYMEX Henry Hub. These swaps are marked-to-market through fuel expense with offsetting regulatory assets or liabilities. All benefits or costs of the program are recorded in fuel costs. The notional volumes of these swaps are based on a portion of projected annual exposure to gas price volatility for electric generation at Entergy Louisiana and Entergy Mississippi and projected winter purchases for gas distribution at Entergy New Orleans. The maximum length of time over which Entergy has executed natural gas swaps as of June 30, 2025 is 9 months for Entergy Mississippi. The total volume of natural gas swaps outstanding as of June 30, 2025 is 9,493,000 MMBtu for Entergy and Entergy Mississippi. As of June 30, 2025, Entergy Louisiana and Entergy New Orleans had no outstanding natural gas swaps. Credit support for these natural gas swaps is covered by master agreements that do not require Entergy to provide collateral based on mark-to-market value, but do carry adequate assurance language that may lead to requests for collateral.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

During the second quarter 2025, Entergy participated in the annual financial transmission rights auction process for the MISO planning year of June 1, 2025 through May 31, 2026. Financial transmission rights are derivative instruments that represent economic hedges of future congestion charges that will be incurred in serving Entergy’s customer load. They are not designated as hedging instruments. Entergy initially records financial transmission rights at their estimated fair value and subsequently adjusts the carrying value to their estimated fair value at the end of each accounting period prior to settlement. Unrealized gains or losses on financial transmission rights held by the non-utility operations are included in operating revenues. The Utility operating companies recognize regulatory liabilities or assets for unrealized gains or losses on financial transmission rights. The total volume of financial transmission rights outstanding as of June 30, 2025 is 102,393 GWh for Entergy, including 20,804 GWh for Entergy Arkansas, 55,064 GWh for Entergy Louisiana, 11,361 GWh for Entergy Mississippi, 3,660 GWh for Entergy New Orleans, and 11,505 GWh for Entergy Texas. Credit support for financial transmission rights held by the Utility operating companies is covered by cash and/or letters of credit issued by each Utility operating company as required by MISO. Credit support for financial transmission rights held by Entergy’s non-utility operations business is covered by cash. No cash or letters of credit were required to be posted for financial transmission rights exposure for the non-utility operations business as of June 30, 2025 and December 31, 2024. Letters of credit posted with MISO covered the financial transmission rights exposure for Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy Texas as of June 30, 2025 and for Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, and Entergy Texas as of December 31, 2024.

The fair values of Entergy’s derivative instruments not designated as hedging instruments on the consolidated balance sheets as of June 30, 2025 and December 31, 2024 are shown in the table below. Certain investments, including those not designated as hedging instruments, are subject to master netting agreements and are presented in the balance sheet on a net basis in accordance with accounting guidance for derivatives and hedging.

InstrumentBalance Sheet LocationGross Fair Value (a)Offsetting Position (b)Net Fair Value (c) (d)
(In Millions)
2025
Assets:
Financial transmission rightsPrepayments and other$49($1)$48
Liabilities:
Natural gas swapsOther current liabilities$3$—$3
2024
Assets:
Natural gas swapsPrepayments and other$2$—$2
Financial transmission rightsPrepayments and other$21($1)$20
Liabilities:
Financial transmission rightsOther current liabilities($—)$1$1

(a)Represents the gross amounts of recognized assets/liabilities

(b)Represents the netting of fair value balances with the same counterparty

(c)Represents the net amounts of assets/liabilities presented on the Entergy Corporation and Subsidiaries’ Consolidated Balance Sheets

(d)Excludes letters of credit posted with MISO to cover financial transmission rights exposure in the amount of $6 million as of June 30, 2025 and $2 million as of December 31, 2024

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The effects of Entergy’s derivative instruments not designated as hedging instruments on the consolidated income statements for the three months ended June 30, 2025 and 2024 are as follows:

InstrumentAmount of gainrecorded in the income statement
(In Millions)
2025
Natural gas swaps(a)$11
Financial transmission rights(b)$66
2024
Natural gas swaps(a)$3
Financial transmission rights(b)$47

The effects of Entergy’s derivative instruments not designated as hedging instruments on the consolidated income statements for the six months ended June 30, 2025 and 2024 are as follows:

InstrumentAmount of gain (loss)recorded in the income statement
(In Millions)
2025
Natural gas swaps(a)($1)
Financial transmission rights(b)$114
2024
Natural gas swaps(a)($3)
Financial transmission rights(b)$100

(a)Due to regulatory treatment, the natural gas swaps are marked-to-market through fuel, fuel-related expenses, and gas purchased for resale and then such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as fuel expenses when the swaps are settled are recovered or refunded through fuel cost recovery mechanisms.

(b)Due to regulatory treatment, the changes in the estimated fair value of financial transmission rights for the Utility operating companies are recorded through purchased power expense and then such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as purchased power expense when the financial transmission rights for the Utility operating companies are settled are recovered or refunded through fuel cost recovery mechanisms.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The fair values of derivative instruments not designated as hedging instruments on the Registrant Subsidiaries’ balance sheets as of June 30, 2025 and December 31, 2024 are shown in the tables below. Certain investments, including those not designated as hedging instruments, are subject to master netting agreements and are presented in the balance sheet on a net basis in accordance with accounting guidance for derivatives and hedging.

InstrumentBalance Sheet LocationGross Fair Value (a)Offsetting Position (b)Net Fair Value (c) (d)Registrant
(In Millions)
2025
Assets:
Financial transmission rightsPrepayments and other$11.1$—$11.1Entergy Arkansas
Financial transmission rightsPrepayments and other$28.6($0.3)$28.3Entergy Louisiana
Financial transmission rightsPrepayments and other$1.5($0.1)$1.4Entergy Mississippi
Financial transmission rightsPrepayments and other$3.0$—$3.0Entergy New Orleans
Financial transmission rightsPrepayments and other$4.5($0.6)$3.9Entergy Texas
Liabilities:
Natural gas swapsOther current liabilities$3.0$—$3.0Entergy Mississippi
InstrumentBalance Sheet LocationGross Fair Value (a)Offsetting Position (b)Net Fair Value (c) (d)Registrant
(In Millions)
2024
Assets:
Natural gas swapsPrepayments and other$1.6$—$1.6Entergy Mississippi
Financial transmission rightsPrepayments and other$8.6($0.1)$8.5Entergy Arkansas
Financial transmission rightsPrepayments and other$8.7($0.1)$8.6Entergy Louisiana
Financial transmission rightsPrepayments and other$1.3$—$1.3Entergy New Orleans
Financial transmission rightsPrepayments and other$2.0($0.1)$1.9Entergy Texas
Liabilities:
Financial transmission rightsOther current liabilities($0.4)$0.9$0.5Entergy Mississippi

(a)Represents the gross amounts of recognized assets/liabilities

(b)Represents the netting of fair value balances with the same counterparty

(c)Represents the net amounts of assets/liabilities presented on the Registrant Subsidiaries’ balance sheets

(d)Excludes letters of credit posted with MISO to cover financial transmission rights exposure in the amount of $3.5 million for Entergy Arkansas, $1.2 million for Entergy Louisiana, $0.6 million for Entergy Mississippi,

Entergy Corporation and Subsidiaries

Notes to Financial Statements

and $0.6 million for Entergy Texas as of June 30, 2025 and in the amount of $0.5 million for Entergy Arkansas, $0.1 million for Entergy Louisiana, $0.8 million for Entergy Mississippi, $0.1 million for Entergy New Orleans, and $0.3 million for Entergy Texas as of December 31, 2024.

The effects of derivative instruments not designated as hedging instruments on the Registrant Subsidiaries’ income statements for the three months ended June 30, 2025 and 2024 are as follows:

InstrumentIncome Statement LocationAmount of gain(loss) recordedin the income statementRegistrant
(In Millions)
2025
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale$11.4Entergy Mississippi
Financial transmission rightsPurchased power expense$9.5Entergy Arkansas
Financial transmission rightsPurchased power expense$42.0Entergy Louisiana
Financial transmission rightsPurchased power expense$3.1Entergy Mississippi
Financial transmission rightsPurchased power expense$8.8Entergy New Orleans
Financial transmission rightsPurchased power expense$2.3Entergy Texas
2024
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale($3.0)Entergy Mississippi
Financial transmission rightsPurchased power expense$12.0Entergy Arkansas
Financial transmission rightsPurchased power expense$25.0Entergy Louisiana
Financial transmission rightsPurchased power expense$2.1Entergy Mississippi
Financial transmission rightsPurchased power expense$3.3Entergy New Orleans
Financial transmission rightsPurchased power expense$4.6Entergy Texas

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The effects of derivative instruments not designated as hedging instruments on the Registrant Subsidiaries’ income statements for the six months ended June 30, 2025 and 2024 are as follows:

InstrumentIncome Statement LocationAmount of gain(loss) recordedin the income statementRegistrant
(In Millions)
2025
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale($1.2)Entergy Mississippi
Financial transmission rightsPurchased power expense$28.2Entergy Arkansas
Financial transmission rightsPurchased power expense$64.1Entergy Louisiana
Financial transmission rightsPurchased power expense$5.1Entergy Mississippi
Financial transmission rightsPurchased power expense$11.1Entergy New Orleans
Financial transmission rightsPurchased power expense$5.8Entergy Texas
2024
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale$2.3Entergy Mississippi
Natural gas swapsFuel, fuel-related expenses, and gas purchased for resale$0.5Entergy New Orleans
Financial transmission rightsPurchased power expense$38.9Entergy Arkansas
Financial transmission rightsPurchased power expense$41.2Entergy Louisiana
Financial transmission rightsPurchased power expense$3.1Entergy Mississippi
Financial transmission rightsPurchased power expense$4.4Entergy New Orleans
Financial transmission rightsPurchased power expense$12.1Entergy Texas

(a)Due to regulatory treatment, the natural gas swaps are marked-to-market through fuel, fuel-related expenses, and gas purchased for resale and then such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as fuel expenses when the swaps are settled are recovered or refunded through fuel cost recovery mechanisms.

(b)Due to regulatory treatment, the changes in the estimated fair value of financial transmission rights for the Utility operating companies are recorded through purchased power expense and then such amounts are simultaneously reversed and recorded as an offsetting regulatory asset or liability. The gains or losses recorded as purchased power expense when the financial transmission rights for the Utility operating companies are settled are recovered or refunded through fuel cost recovery mechanisms.

Fair Values

The estimated fair values of Entergy’s financial instruments and derivatives are determined using historical prices, bid prices, market quotes, and financial modeling. Considerable judgment is required in developing the estimates of fair value. Therefore, estimates are not necessarily indicative of the amounts that Entergy could realize in a current market exchange. Gains or losses realized on financial instruments are reflected in future rates and therefore do not affect net income. Entergy considers the carrying amounts of most financial instruments classified as current assets and liabilities to be a reasonable estimate of their fair value because of the short maturity of these instruments.

Accounting standards define fair value as an exit price, or the price that would be received to sell an asset or the amount that would be paid to transfer a liability in an orderly transaction between knowledgeable market

Entergy Corporation and Subsidiaries

Notes to Financial Statements

participants at the date of measurement. Entergy and the Registrant Subsidiaries use assumptions or market input data that market participants would use in pricing assets or liabilities at fair value. The inputs can be readily observable, corroborated by market data, or generally unobservable. Entergy and the Registrant Subsidiaries endeavor to use the best available information to determine fair value.

Accounting standards establish a fair value hierarchy that prioritizes the inputs used to measure fair value. The hierarchy establishes the highest priority for unadjusted market quotes in an active market for the identical asset or liability and the lowest priority for unobservable inputs.

The three levels of the fair value hierarchy are:

  • Level 1 - Level 1 inputs are unadjusted quoted prices in active markets for identical assets or liabilities that the entity has the ability to access at the measurement date. Active markets are those in which transactions for the asset or liability occur in sufficient frequency and volume to provide pricing information on an ongoing basis. Level 1 primarily consists of individually owned common stocks, cash equivalents (temporary cash investments, securitization recovery trust account, and escrow accounts), debt instruments, and gas swaps traded on exchanges with active markets. Cash equivalents includes all unrestricted highly liquid debt instruments with an original or remaining maturity of three months or less at the date of purchase.
  • Level 2 - Level 2 inputs are inputs other than quoted prices included in Level 1 that are, either directly or indirectly, observable for the asset or liability at the measurement date. Assets are valued based on prices derived by independent third parties that use inputs such as benchmark yields, reported trades, broker/dealer quotes, and issuer spreads. Prices are reviewed and can be challenged with the independent parties and/or overridden by Entergy if it is believed such would be more reflective of fair value. Level 2 inputs include the following:

–quoted prices for similar assets or liabilities in active markets;

–quoted prices for identical assets or liabilities in inactive markets;

–inputs other than quoted prices that are observable for the asset or liability; or

–inputs that are derived principally from or corroborated by observable market data by correlation or other means.

Level 2 consists primarily of individually-owned debt instruments and gas swaps valued using observable inputs.

  • Level 3 - Level 3 inputs are pricing inputs that are generally less observable or unobservable from objective sources. These inputs are used with internally developed methodologies to produce management’s best estimate of fair value for the asset or liability. Level 3 consists primarily of financial transmission rights.

The values of financial transmission rights are based on unobservable inputs, including estimates of congestion costs in MISO between applicable generation and load pricing nodes based on the 50th percentile of historical prices. They are classified as Level 3 assets and liabilities. The valuations of these assets and liabilities are performed by the Office of Corporate Risk Oversight. The values are calculated internally and verified against the data published by MISO. Entergy’s Accounting group reviews these valuations for reasonableness, with the assistance of others within the organization with knowledge of the various inputs and assumptions used in the valuation. The Office of Corporate Risk Oversight reports to the Vice President and Treasurer. The Accounting group reports to the Chief Accounting Officer.

The following tables set forth, by level within the fair value hierarchy, Entergy’s assets and liabilities that are accounted for at fair value on a recurring basis as of June 30, 2025 and December 31, 2024. The assessment of

Entergy Corporation and Subsidiaries

Notes to Financial Statements

the significance of a particular input to a fair value measurement requires judgment and may affect placement within the fair value hierarchy levels.

In Millions

View SEC source
2025Level 1Level 2Level 3Total
Assets:
Temporary cash investments$1,012$—$—$1,012
Decommissioning trust funds (a):
Equity securities4848
Debt securities8571,2502,107
Common trusts (b)3,678
Securitization recovery trust account11
Storm reserve escrow accounts303303
Financial transmission rights4848
$2,221$1,250$48$7,197
Liabilities:
Natural gas swaps$—$—$3$3

In Millions

View SEC source
2024Level 1Level 2Level 3Total
Assets:
Temporary cash investments$811$—$—$811
Decommissioning trust funds (a):
Equity securities3030
Debt securities8481,1992,047
Common trusts (b)3,486
Securitization recovery trust account44
Storm reserve escrow accounts340340
Natural gas swaps22
Financial transmission rights2020
$2,035$1,199$20$6,740
Liabilities:
Financial transmission rights$—$—$1$1

(a)The decommissioning trust funds hold equity and fixed income securities. Equity securities are invested to approximate the returns of major market indices. Fixed income securities are held in various governmental and corporate securities. See Note 9 to the financial statements herein for additional information on the investment portfolios.

(b)Common trust funds are not publicly quoted and are valued by the fund administrators using net asset value as a practical expedient. Accordingly, these funds are not assigned a level in the fair value table. The fund administrator of these investments allows daily trading at the net asset value and trades settle at a later date.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The following table sets forth a reconciliation of changes in the net assets for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the three months ended June 30, 2025 and 2024:

In Millions

View SEC source
Line item20252024
Balance as of April 1,
Issuances of financial transmission rights4953
Gains included as a regulatory liability/asset5834
Settlements()()
Balance as of June 30,

The following table sets forth a reconciliation of changes in the net assets for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the six months ended June 30, 2025 and 2024:

In Millions

View SEC source
Line item20252024
Balance as of January 1,
Issuances of financial transmission rights4953
Gains included as a regulatory liability/asset9375
Settlements()()
Balance as of June 30,

The fair values of the Level 3 financial transmission rights are based on unobservable inputs calculated internally and verified against historical pricing data published by MISO.

The following tables set forth, by level within the fair value hierarchy, the Registrant Subsidiaries’ assets and liabilities that are accounted for at fair value on a recurring basis as of June 30, 2025 and December 31, 2024. The assessment of the significance of a particular input to a fair value measurement requires judgment and may affect placement within the fair value hierarchy levels.

Entergy Arkansas

In Millions

View SEC source
2025Level 1Level 2Level 3Total
Assets:
Temporary cash investments$182.4$—$—$182.4
Decommissioning trust funds (a):
Equity securities23.323.3
Debt securities266.3327.8594.1
Common trusts (b)1,069.3
Financial transmission rights11.111.1
$472.0$327.8$11.1$1,880.2

Entergy Corporation and Subsidiaries

Notes to Financial Statements

In Millions

View SEC source
2024Level 1Level 2Level 3Total
Assets:
Temporary cash investments$3.4$—$—$3.4
Decommissioning trust funds (a):
Equity securities12.912.9
Debt securities259.9319.1579.0
Common trusts (b)1,012.5
Financial transmission rights8.58.5
$276.2$319.1$8.5$1,616.3

Entergy Louisiana

In Millions

View SEC source
2025Level 1Level 2Level 3Total
Assets:
Temporary cash investments$298.3$—$—$298.3
Decommissioning trust funds (a):
Equity securities20.820.8
Debt securities332.4598.9931.3
Common trusts (b)1,588.4
Storm reserve escrow account228.4228.4
Financial transmission rights28.328.3
$879.9$598.9$28.3$3,095.5

In Millions

View SEC source
2024Level 1Level 2Level 3Total
Assets:
Temporary cash investments$326.8$—$—$326.8
Decommissioning trust funds (a):
Equity securities14.514.5
Debt securities326.0582.1908.1
Common trusts (b)1,506.5
Storm reserve escrow account256.7256.7
Financial transmission rights8.68.6
$924.0$582.1$8.6$3,021.2

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Entergy Mississippi

In Millions

View SEC source
2025Level 1Level 2Level 3Total
Assets:
Temporary cash investments$401.3$—$—$401.3
Financial transmission rights1.41.4
$401.3$—$1.4$402.7
Liabilities:
Natural gas swaps$—$—$3.0$3.0

In Millions

View SEC source
2024Level 1Level 2Level 3Total
Assets:
Temporary cash investments$155.5$—$—$155.5
Natural gas swaps1.61.6
$157.1$—$—$157.1
Liabilities:
Financial transmission rights$—$—$0.5$0.5

Entergy New Orleans

In Millions

View SEC source
2025Level 1Level 2Level 3Total
Assets:
Storm reserve escrow account$75.1$—$—$75.1
Financial transmission rights3.03.0
$75.1$—$3.0$78.1

In Millions

View SEC source
2024Level 1Level 2Level 3Total
Assets:
Temporary cash investments$31.4$—$—$31.4
Securitization recovery trust account1.61.6
Storm reserve escrow account83.783.7
Financial transmission rights1.31.3
$116.7$—$1.3$118.0

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Entergy Texas

In Millions

View SEC source
2025Level 1Level 2Level 3Total
Assets:
Temporary cash investments$17.7$—$—$17.7
Securitization recovery trust account1.01.0
Financial transmission rights3.93.9
$18.7$—$3.9$22.6

In Millions

View SEC source
2024Level 1Level 2Level 3Total
Assets:
Temporary cash investments$184.7$—$—$184.7
Securitization recovery trust account2.72.7
Financial transmission rights1.91.9
$187.4$—$1.9$189.3

System Energy

In Millions

View SEC source
2025Level 1Level 2Level 3Total
Assets:
Temporary cash investments$31.7$—$—$31.7
Decommissioning trust funds (a):
Equity securities4.14.1
Debt securities258.6323.5582.1
Common trusts (b)1,020.1
$294.4$323.5$—$1,638.0

In Millions

View SEC source
2024Level 1Level 2Level 3Total
Assets:
Temporary cash investments$28.5$—$—$28.5
Decommissioning trust funds (a):
Equity securities2.42.4
Debt securities262.4297.4559.8
Common trusts (b)966.9
$293.3$297.4$—$1,557.6

(a)The decommissioning trust funds hold equity and fixed income securities. Equity securities are invested to approximate the returns of major market indices. Fixed income securities are held in various governmental and corporate securities. See Note 9 to the financial statements herein for additional information on the investment portfolios.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

(b)Common trust funds are not publicly quoted and are valued by the fund administrators using net asset value as a practical expedient. Accordingly, these funds are not assigned a level in the fair value table. The fund administrator of these investments allows daily trading at the net asset value and trades settle at a later date.

The following table sets forth a reconciliation of changes in the net assets (liabilities) for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the three months ended June 30, 2025.

In Millions

View SEC source
Line itemEntergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
Balance as of April 1,$3.0$3.4($0.1)$0.4$0.4
Issuances of financial transmission rights11.828.71.53.04.0
Gains included as a regulatory liability/asset5.838.23.18.41.8
Settlements(9.5)(42.0)(3.1)(8.8)(2.3)
Balance as of June 30,$11.1$28.3$1.4$3.0$3.9

The following table sets forth a reconciliation of changes in the net assets for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the three months ended June 30, 2024.

In Millions

View SEC source
Line itemEntergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
Balance as of April 1,$2.8$4.1$0.6$0.5$1.2
Issuances of financial transmission rights17.621.63.92.87.3
Gains included as a regulatory liability/asset7.719.11.22.62.7
Settlements(12.0)(25.0)(2.1)(3.3)(4.6)
Balance as of June 30,$16.1$19.8$3.6$2.6$6.6

The following table sets forth a reconciliation of changes in the net assets (liabilities) for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the six months ended June 30, 2025.

In Millions

View SEC source
Line itemEntergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
Balance as of January 1,$8.6$8.6($0.5)$1.3$1.9
Issuances of financial transmission rights11.828.71.52.94.0
Gains included as a regulatory liability/asset18.955.15.59.93.8
Settlements(28.2)(64.1)(5.1)(11.1)(5.8)
Balance as of June 30,$11.1$28.3$1.4$3.0$3.9

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The following table sets forth a reconciliation of changes in the net assets for the fair value of financial transmission rights classified as Level 3 in the fair value hierarchy for the six months ended June 30, 2024.

In Millions

View SEC source
Line itemEntergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
Balance as of January 1,$6.0$9.8$1.4$1.1$2.4
Issuances of financial transmission rights17.621.63.92.87.3
Gains included as a regulatory liability/asset31.429.61.43.19.0
Settlements(38.9)(41.2)(3.1)(4.4)(12.1)
Balance as of June 30,$16.1$19.8$3.6$2.6$6.6

NOTE 9. DECOMMISSIONING TRUST FUNDS (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, and System Energy)

The NRC requires certain of the Utility operating companies and System Energy to maintain nuclear decommissioning trusts to fund the costs of decommissioning ANO 1 and 2, River Bend, Waterford 3, and Grand Gulf. Entergy’s nuclear decommissioning trust funds invest in equity securities, fixed-rate debt securities, and cash and cash equivalents.

Entergy records decommissioning trust funds on the balance sheet at their fair value. Because of the ability of the Registrant Subsidiaries to recover decommissioning costs in rates and in accordance with the regulatory treatment for decommissioning trust funds, for unrealized gains/(losses) on investment securities, the Registrant Subsidiaries record an offsetting amount in other regulatory liabilities/assets. For the 30% interest in River Bend formerly owned by Cajun, Entergy Louisiana records an offsetting amount in other long-term liabilities on the consolidated balance sheets of Entergy and Entergy Louisiana for the unrealized trust earnings not currently expected to be needed to decommission the plant. Generally, Entergy records gains and losses on its debt and equity securities using the specific identification method to determine the cost basis of its securities.

The unrealized gains/(losses) recognized during the three and six months ended June 30, 2025 on equity securities still held as of June 30, 2025 were million and million, respectively. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor’s 500 Index. A relatively small percentage of the equity securities are held in funds that are designed to approximate or somewhat exceed the return of the Wilshire 4500 Index. The debt securities are generally held in individual government and credit issuances.

The available-for-sale debt securities held as of June 30, 2025 and December 31, 2024 are summarized as follows:

In Millions

View SEC source
Line item20252024
Fair value
Unrealized gains
Unrealized losses

As of June 30, 2025 and December 31, 2024, there were deferred taxes on unrealized gains/(losses). The amortized cost of available-for-sale debt securities was million as of June 30, 2025 and million as of December 31, 2024. As of June 30, 2025, available-for-sale debt securities had an average coupon rate of

Entergy Corporation and Subsidiaries

Notes to Financial Statements

approximately 4.14%, an average duration of approximately 6.39 years, and an average maturity of approximately 10.81 years.

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of June 30, 2025 and December 31, 2024:

In Millions

View SEC source
Line item2025Fair Value2025Gross Unrealized Losses2024Fair Value2024Gross Unrealized Losses
Less than 12 months$565$1,102
More than 12 months
Total$1,003$1,612

The fair value of available-for-sale debt securities, summarized by contractual maturities, as of June 30, 2025 and December 31, 2024 were as follows:

In Millions

View SEC source
Line item20252024
Less than 1 year
1 year - 5 years
5 years - 10 years
10 years - 15 years195166
15 years - 20 years197218
20 years+473424
Total

The following table summarizes proceeds from the dispositions of available-for-sale debt securities and the related gains and losses from the sales during the three and six months ended June 30, 2025 and 2024:

In Millions

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
Proceeds from disposition of securities
Realized gains$1$—$2$1
Realized losses

During the three and six months ended June 30, 2025 and 2024, gross gains and gross losses related to available-for-sale debt securities were reclassified out of other regulatory liabilities/assets into earnings.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Entergy Arkansas

Entergy Arkansas holds equity securities and available-for-sale debt securities in nuclear decommissioning trust accounts. The available-for-sale debt securities held as of June 30, 2025 and December 31, 2024 are summarized as follows:

In Millions

View SEC source
Line item20252024
Fair value$594.1$579.0
Unrealized gains$5.4$1.2
Unrealized losses$17.5$25.8

The amortized cost of available-for-sale debt securities was $606.1 million as of June 30, 2025 and $603.5 million as of December 31, 2024. As of June 30, 2025, the available-for-sale debt securities had an average coupon rate of approximately 3.75%, an average duration of approximately 6.20 years, and an average maturity of approximately 8.46 years.

The unrealized gains/(losses) recognized during the three and six months ended June 30, 2025 on equity securities still held as of June 30, 2025 were $138 million and $126.7 million, respectively. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor’s 500 Index. A relatively small percentage of the equity securities are held in funds that are designed to approximate or somewhat exceed the return of the Wilshire 4500 Index. The debt securities are generally held in individual government and credit issuances.

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of June 30, 2025 and December 31, 2024:

In Millions

View SEC source
Line item2025Fair Value2025Gross Unrealized Losses2024Fair Value2024Gross Unrealized Losses
Less than 12 months$141.8$4.6$282.8$8.2
More than 12 months174.012.9195.017.6
Total$315.8$17.5$477.8$25.8

The fair value of available-for-sale debt securities, summarized by contractual maturities, as of June 30, 2025 and December 31, 2024 were as follows:

In Millions

View SEC source
Line item20252024
Less than 1 year$26.3$31.7
1 year - 5 years159.2142.5
5 years - 10 years251.7231.0
10 years - 15 years37.462.2
15 years - 20 years43.162.8
20 years+76.448.8
Total$594.1$579.0

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The following table summarizes proceeds from the dispositions of available-for-sale debt securities and the related gains and losses from the sales during the three and six months ended June 30, 2025 and 2024:

In Millions

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
Proceeds from disposition of securities$—$5.5$—$17.9
Realized gains$—$0.1$—$0.1
Realized losses$—$0.4$—$0.9

During three and six months ended June 30, 2025 and 2024, gross gains and gross losses related to available-for-sale debt securities were reclassified out of other regulatory liabilities/assets into earnings.

Entergy Louisiana

Entergy Louisiana holds equity securities and available-for-sale debt securities in nuclear decommissioning trust accounts. The available-for-sale debt securities held as of June 30, 2025 and December 31, 2024 are summarized as follows:

In Millions

View SEC source
Line item20252024
Fair value$931.3$908.1
Unrealized gains$8.1$3.6
Unrealized losses$24.1$26.9

The amortized cost of available-for-sale debt securities was $947.3 million as of June 30, 2025 and $931.5 million as of December 31, 2024. As of June 30, 2025, the available-for-sale debt securities had an average coupon rate of approximately 4.40%, an average duration of approximately 6.57 years, and an average maturity of approximately 12.38 years.

The unrealized gains/(losses) recognized during the three and six months ended June 30, 2025 on equity securities still held as of June 30, 2025 were $267.9 million and $254.6 million, respectively. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor’s 500 Index. A relatively small percentage of the equity securities are held in funds that are designed to approximate or somewhat exceed the return of the Wilshire 4500 Index. The debt securities are generally held in individual government and credit issuances.

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of June 30, 2025 and December 31, 2024:

In Millions

View SEC source
Line item2025Fair Value2025Gross Unrealized Losses2024Fair Value2024Gross Unrealized Losses
Less than 12 months$318.7$9.4$543.8$8.8
More than 12 months150.614.7178.418.1
Total$469.3$24.1$722.2$26.9

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The fair value of available-for-sale debt securities, summarized by contractual maturities, as of June 30, 2025 and December 31, 2024 were as follows:

In Millions

View SEC source
Line item20252024
Less than 1 year$2.4$4.4
1 year - 5 years212.3188.2
5 years - 10 years214.3259.4
10 years - 15 years115.080.9
15 years - 20 years107.6106.1
20 years+279.7269.1
Total$931.3$908.1

The following table summarizes proceeds from the dispositions of available-for-sale debt securities and the related gains and losses from the sales during the three and six months ended June 30, 2025 and 2024:

In Millions

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
Proceeds from disposition of securities$71.5$62.5$181.5$110.9
Realized gains$0.1$0.1$0.2$0.2
Realized losses$2.4$4.8$4.0$7.7

During the three and six months ended June 30, 2025 and 2024, gross gains and gross losses related to available-for-sale debt securities were reclassified out of other regulatory liabilities/assets into earnings.

System Energy

System Energy holds equity securities and available-for-sale debt securities in nuclear decommissioning trust accounts. The available-for-sale debt securities held as of June 30, 2025 and December 31, 2024 are summarized as follows:

In Millions

View SEC source
Line item20252024
Fair value$582.1$559.8
Unrealized gains$6.1$1.9
Unrealized losses$19.0$27.6

The amortized cost of available-for-sale debt securities was $595 million as of June 30, 2025 and $585.5 million as of December 31, 2024. As of June 30, 2025, the available-for-sale debt securities had an average coupon rate of approximately 4.13%, an average duration of approximately 6.27 years, and an average maturity of approximately 10.73 years.

The unrealized gains/(losses) recognized during the three and six months ended June 30, 2025 on equity securities still held as of June 30, 2025 were $130.5 million and $131.3 million, respectively. The equity securities are generally held in funds that are designed to approximate or somewhat exceed the return of the Standard & Poor’s 500 Index. A relatively small percentage of the equity securities are held in funds that are designed to approximate or somewhat exceed the return of the Wilshire 4500 Index. The debt securities are generally held in individual government and credit issuances.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

The fair value and gross unrealized losses of available-for-sale debt securities, summarized by length of time that the securities had been in a continuous loss position, were as follows as of June 30, 2025 and December 31, 2024:

In Millions

View SEC source
Line item2025Fair Value2025Gross Unrealized Losses2024Fair Value2024Gross Unrealized Losses
Less than 12 months$104.2$3.3$275.6$6.8
More than 12 months113.815.7136.820.8
Total$218.0$19.0$412.4$27.6

The fair value of available-for-sale debt securities, summarized by contractual maturities, as of June 30, 2025 and December 31, 2024 were as follows:

In Millions

View SEC source
Line item20252024
Less than 1 year$0.2$0.2
1 year - 5 years169.2243.7
5 years - 10 years206.4138.9
10 years - 15 years42.522.7
15 years - 20 years46.449.4
20 years+117.4104.9
Total$582.1$559.8

The following table summarizes proceeds from the dispositions of available-for-sale debt securities and the related gains and losses from the sales during the three and six months ended June 30, 2025 and 2024:

In Millions

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
Proceeds from disposition of securities$155.3$93.5$307.6$201.5
Realized gains$0.8$—$1.3$0.2
Realized losses$1.4$8.4$4.0$11.9

During the three and six months ended June 30, 2025 and 2024, gross gains and gross losses related to available-for-sale debt securities were reclassified out of other regulatory liabilities/assets into earnings.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

NOTE 10. INCOME TAXES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

See “Income Tax Audits” and “Other Tax Matters” in Note 3 to the financial statements in the Form 10-K for a discussion of income tax audits, the Tax Cuts and Jobs Act, and other income tax matters involving Entergy. The following are updates to that discussion.

Other Tax Matters

Inflation Reduction Act of 2022

As discussed in the Note 3 to the financial statements in the Form 10-K, the Inflation Reduction Act, signed into law on August 16, 2022, significantly expanded federal tax incentives for clean energy production, including the extension of production tax credits to solar projects and certain qualified nuclear power facilities. Entergy Arkansas, Entergy Louisiana, and System Energy have the potential to generate zero-emission nuclear power production tax credits for electricity generated by their respective nuclear power facilities. Due to the uncertainty of the value, if any, of credits Entergy Arkansas, Entergy Louisiana, or System Energy may receive, such credits for the nuclear power produced in 2024 were not recognized as of December 31, 2024.

In second quarter 2025, Entergy, Entergy Arkansas, Entergy Louisiana, and System Energy determined, based on current analysis and evolving regulatory developments, that it was appropriate to record zero-emission nuclear power production tax credits for electricity generated in 2024 by their respective nuclear power facilities and the credits are expected to be claimed on the Entergy 2024 federal income tax return. Because the U.S. Treasury and the IRS have not issued final guidance on the application of Internal Revenue Code section 45U, including the definition of “gross receipts,” Entergy considers the tax position associated with these credits to be uncertain under the provisions of income tax accounting standards. As such, the recognition of the credits included a corresponding provision for uncertain tax positions for the full amount of the credits recognized.

The value of the credits was calculated based on the amount of electricity generated and sold by each nuclear generating unit owned by Entergy Arkansas, Entergy Louisiana, and System Energy during 2024, multiplied by the applicable credit rate (i.e. dollars per kW). The applicable credit rate included the incremental amount of credit for meeting the “prevailing wages” criteria under the Inflation Reduction Act. Entergy also applied the statutorily required reduction amount in arriving at the value of the credits. This reduction amount was driven by the “Gross receipts” received by each unit for its 2024 energy production. Entergy Arkansas, Entergy Louisiana, and System Energy recognized production tax credits of $221.4 million, $208.9 million, and $140.9 million, respectively, resulting in an Entergy consolidated production tax credit of $571.2 million. To the extent future guidance allows Entergy to realize the value of the credits under the provisions of income tax accounting standards, the monetized value of the credits are expected to be shared with customers.

Entergy Arkansas, Entergy Louisiana, and System Energy expect to transfer the credits to third parties for cash (including a reasonable discount) prior to the filing of the Entergy 2024 federal income tax return. As such, Entergy Arkansas, Entergy Louisiana, System Energy, and the relevant affiliates are preparing or have submitted filings with the FERC and their respective retail regulators to determine a fair and reasonable approach, including risk sharing and timing, to incorporate the net cash proceeds received for these credits into future customer rates, particularly in light of the related provision for uncertain tax position. Entergy will continue to monitor developments and reassess its tax position as additional guidance or other information emerges.

Sale of Natural Gas Distribution Businesses

See Note 13 to the financial statements herein for discussion of the sale of Entergy New Orleans’ and Entergy Louisiana’s natural gas distribution businesses on July 1, 2025. Entergy is expected to recognize a gain of approximately $335 million for tax purposes, with Entergy Louisiana and Entergy New Orleans recognizing

Entergy Corporation and Subsidiaries

Notes to Financial Statements

$150 million and $185 million, respectively. Both Entergy and Entergy Louisiana have sufficient federal tax net operating loss carryforwards to offset their respective gains. Accordingly, Entergy does not have a resulting federal income tax obligation as a result of the transaction, nor will Entergy Louisiana be required to make a federal tax payment under the terms of the intercompany income tax allocation agreement. Entergy New Orleans is expected to fully absorb its federal tax net operating loss carryforward in 2025, and its resulting federal tax payment under the intercompany income tax allocation agreement will be dependent on its results of operations for the remainder of the year. Estimated state tax payments for Entergy, Entergy Louisiana, and Entergy New Orleans are not anticipated to be significant.

NOTE 11. VARIABLE INTEREST ENTITIES (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

See Note 17 to the financial statements in the Form 10-K for a discussion of variable interest entities (VIEs). See Note 4 to the financial statements herein for details of the nuclear fuel companies’ credit facilities, commercial paper borrowings, and long-term debt. See Note 6 to the financial statements in the Form 10-K for discussion of noncontrolling interests.

Restoration Law Trust I (the storm trust I), a trust consolidated by Entergy Louisiana, is a VIE and Entergy Louisiana is the primary beneficiary. As of June 30, 2025 and December 31, 2024, the primary asset held by the storm trust I was $2.8 billion and $2.9 billion, respectively, of outstanding Entergy Finance Company preferred membership interests, which is reflected as an investment in affiliate preferred membership interests on the consolidated balance sheets of Entergy Louisiana. The LURC’s 1% beneficial interest in the storm trust I is recorded as noncontrolling interest on the consolidated balance sheets of Entergy and Entergy Louisiana, with balances of $28.9 million as of June 30, 2025 and $28.8 million as of December 31, 2024.

Restoration Law Trust II (the storm trust II), a trust consolidated by Entergy Louisiana, is a VIE and Entergy Louisiana is the primary beneficiary. As of June 30, 2025 and December 31, 2024, the primary asset held by the storm trust II was $1.3 billion and $1.4 billion, respectively, of outstanding Entergy Finance Company preferred membership interests, which is reflected as an investment in affiliate preferred membership interests on the consolidated balance sheets of Entergy Louisiana. The LURC’s 1% beneficial interest in the storm trust II is recorded as noncontrolling interest on the consolidated balance sheets of Entergy and Entergy Louisiana, with balances of $14.1 million as of June 30, 2025 and $13.9 million as of December 31, 2024.

System Energy is considered to hold a variable interest in the lessor from which it leases an undivided interest in the Grand Gulf nuclear plant. System Energy is the lessee under this arrangement, which is described in more detail in Note 5 to the financial statements in the Form 10-K. System Energy made payments under this arrangement, including interest, of $8.6 million in each of the six months ended June 30, 2025 and the six months ended June 30, 2024.

AR Searcy Partnership, LLC is a tax equity partnership that qualifies as a VIE, which Entergy Arkansas is required to consolidate as it is the primary beneficiary. As of June 30, 2025, AR Searcy Partnership, LLC recorded assets equal to $127.5 million, primarily consisting of property, plant, and equipment, and the carrying value of Entergy Arkansas’s ownership interest in the partnership was approximately $114 million. As of December 31, 2024, AR Searcy Partnership, LLC recorded assets equal to $129.7 million, primarily consisting of property, plant, and equipment, and the carrying value of Entergy Arkansas’s ownership interest in the partnership was approximately $113.2 million. The tax equity investor’s ownership interest is recorded as noncontrolling interest on the consolidated balance sheets of Entergy and Entergy Arkansas.

MS Sunflower Partnership, LLC is a tax equity partnership that qualifies as a VIE, which Entergy Mississippi is required to consolidate as it is the primary beneficiary. As of June 30, 2025, MS Sunflower Partnership, LLC recorded assets equal to $155.4 million, primarily consisting of property, plant, and equipment,

Entergy Corporation and Subsidiaries

Notes to Financial Statements

and the carrying value of Entergy Mississippi’s ownership interest in the partnership was approximately $136.9 million. As of December 31, 2024, MS Sunflower Partnership, LLC recorded assets equal to $157.8 million, primarily consisting of property, plant, and equipment, and the carrying value of Entergy Mississippi’s ownership interest in the partnership was approximately $132.7 million. The tax equity investor’s ownership interest is recorded as noncontrolling interest on the consolidated balance sheets of Entergy and Entergy Mississippi.

NOTE 12. REVENUE (Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy)

Operating Revenues

See Note 19 to the financial statements in the Form 10-K for a discussion of revenue recognition. Entergy’s total revenues for the three months ended June 30, 2025 and 2024 were as follows:

In Thousands

View SEC source
Line item20252024
Utility:
Residential$1,091,035$1,009,836
Commercial771,097713,282
Industrial945,901792,721
Governmental70,62365,861
Total billed retail2,878,6562,581,700
Sales for resale (a)146,45754,579
Other electric revenues (b)246,674257,813
Revenues from contracts with customers3,271,7872,894,092
Other Utility revenues (c)3,15811,955
Electric revenues3,274,9452,906,047
Natural gas revenues40,77835,357
Other revenues (d)13,12612,216
Total operating revenues$3,328,849$2,953,620

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Entergy’s total revenues for the six months ended June 30, 2025 and 2024 were as follows:

In Thousands

View SEC source
Line item20252024
Utility:
Residential$2,204,340$2,080,177
Commercial1,455,1041,405,133
Industrial1,720,0201,541,679
Governmental133,441131,172
Total billed retail5,512,9055,158,161
Sales for resale (a)198,330133,583
Other electric revenues (b)322,892293,847
Revenues from contracts with customers6,034,1275,585,591
Other Utility revenues (c)(1,316)26,962
Electric revenues6,032,8115,612,553
Natural gas revenues112,509101,024
Other revenues (d)30,40334,671
Total operating revenues$6,175,723$5,748,248

The Utility operating companies’ total revenues for the three months ended June 30, 2025 and 2024 were as follows:

In Thousands

View SEC source
2025Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
Residential$212,265$408,293$172,575$73,279$224,623
Commercial141,468306,916147,05258,133117,528
Industrial174,555570,30353,6297,800139,614
Governmental4,91123,62214,54420,6566,890
Total billed retail533,1991,309,134387,800159,868488,655
Sales for resale (a)84,533109,24361,71310,0275,195
Other electric revenues (b)78,80875,87141,73913,77937,761
Revenues from contracts with customers696,5401,494,248491,252183,674531,611
Other revenues (c)1,1471,25662310730
Electric revenues697,6871,495,504491,875183,781531,641
Natural gas revenues14,55926,219
Total operating revenues$697,687$1,510,063$491,875$210,000$531,641

Entergy Corporation and Subsidiaries

Notes to Financial Statements

In Thousands

View SEC source
2024Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
Residential$204,822$353,975$163,049$71,842$216,148
Commercial132,950265,869142,17357,360114,930
Industrial138,786458,42049,1807,602138,733
Governmental4,43321,22314,06119,1676,977
Total billed retail480,9911,099,487368,463155,971476,788
Sales for resale (a)43,84280,82321,2608,5753,015
Other electric revenues (b)81,73374,67050,71812,81139,224
Revenues from contracts with customers606,5661,254,980440,441177,357519,027
Other revenues (c)2,2326,4642,4531,30750
Electric revenues608,7981,261,444442,894178,664519,077
Natural gas revenues14,68020,677
Total operating revenues$608,798$1,276,124$442,894$199,341$519,077

The Utility operating companies’ total revenues for the six months ended June 30, 2025 and 2024 were as follows:

In Thousands

View SEC source
2025Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
Residential$486,871$786,531$358,883$138,969$433,086
Commercial273,085570,116282,925105,755223,223
Industrial323,6201,036,010100,97413,454245,962
Governmental9,13045,29028,23437,18513,602
Total billed retail1,092,7062,437,947771,016295,363915,873
Sales for resale (a)121,262220,79189,81013,9177,590
Other electric revenues (b)94,884113,86153,53813,21450,057
Revenues from contracts with customers1,308,8522,772,599914,364322,494973,520
Other revenues (c)2,346(5,149)1,22021260
Electric revenues1,311,1982,767,450915,584322,706973,580
Natural gas revenues44,16068,349
Total operating revenues$1,311,198$2,811,610$915,584$391,055$973,580

Entergy Corporation and Subsidiaries

Notes to Financial Statements

In Thousands

View SEC source
2024Entergy ArkansasEntergy LouisianaEntergy MississippiEntergy New OrleansEntergy Texas
Residential$480,574$699,003$341,666$139,520$419,414
Commercial274,258522,565274,491110,585223,234
Industrial288,193880,01795,60714,580263,282
Governmental9,13343,04427,39037,52114,084
Total billed retail1,052,1582,144,629739,154302,206920,014
Sales for resale (a)82,807163,55169,19321,0754,922
Other electric revenues (b)91,074112,61544,5169,59238,736
Revenues from contracts with customers1,226,0392,420,795852,863332,873963,672
Other revenues (c)4,80413,4424,8872,732(104)
Electric revenues1,230,8432,434,237857,750335,605963,568
Natural gas revenues44,32756,697
Total operating revenues$1,230,843$2,478,564$857,750$392,302$963,568

(a)Sales for resale includes day-ahead sales of energy in a market administered by an ISO. These sales represent financially binding commitments for the sale of physical energy the next day. These sales are adjusted to actual power generated and delivered in the real time market. Given the short duration of these transactions, Entergy does not consider them to be derivatives subject to fair value adjustments and includes them as part of customer revenues.

(b)Other electric revenues consist primarily of transmission and ancillary services provided to participants of an ISO-administered market, unbilled revenue, and certain customer credits as directed by regulators.

(c)Other Utility revenues include the occasional sales of inventory, alternative revenue programs, provisions for revenue subject to refund, and late fees.

(d)Other revenues include the sale of electric power and capacity to wholesale customers, day-ahead sales of energy in a market administered by an ISO, and operation and management services fees.

NOTE 13. HELD FOR SALE AND DISPOSITIONS (Entergy Corporation, Entergy Louisiana, and Entergy New Orleans)

Natural Gas Distribution Businesses

See Note 14 to the financial statements in the Form 10-K for information regarding the planned sale of the Entergy New Orleans and Entergy Louisiana natural gas distribution businesses. The following are updates to that discussion.

On October 28, 2023, Entergy New Orleans and Entergy Louisiana each entered into separate purchase and sale agreements with respect to the sale of their respective regulated natural gas local distribution company businesses to two separate affiliates of Bernhard Capital Partners Management LP. Under the purchase and sale agreements, Entergy New Orleans agreed to sell its regulated natural gas local distribution company business that serves customers in the Parish of Orleans, Louisiana, and Entergy Louisiana agreed to sell its regulated natural gas local distribution company business that serves customers in the Parish of East Baton Rouge, Louisiana. The Entergy New Orleans and Entergy Louisiana natural gas distribution businesses are reflected in Entergy’s Utility reportable segment and in the respective single reportable segment for each of Entergy New Orleans and Entergy Louisiana through June 30, 2025.

Entergy Corporation and Subsidiaries

Notes to Financial Statements

Required regulatory approval was received from the LPSC and the City Council in August 2024 and December 2024, respectively. In February 2025 the Metropolitan Council of the Parish of East Baton Rouge approved the proposed sale of the Entergy Louisiana natural gas distribution business and also approved the assignment of the parish franchise from Entergy Louisiana to Delta Capital Gas Company, LLC (a Bernhard Capital Partners Management LP affiliate).

The transactions had two phases: (1) an “Initial Phase” prior to regulatory approvals in connection with both transactions; and (2) a “Second Phase” following regulatory approvals in connection with both transactions to the extent that certain conditions were satisfied or, where permissible, waived for both transactions. As described above, the transactions received all required regulatory approvals, and the Second Phase commenced on March 5, 2025.

The Entergy Louisiana and Entergy New Orleans natural gas distribution businesses first met the criteria to be classified as held for sale in the quarter ended December 31, 2024, and continued to meet such criteria as of June 30, 2025. As of June 30, 2025, neither Entergy Louisiana nor Entergy New Orleans had recognized any write downs of the natural gas distribution business assets as a result of their classification as held for sale, as neither sale was expected to result in a loss. The assets and liabilities of the Entergy Louisiana and Entergy New Orleans natural gas distribution businesses classified as held for sale on Entergy’s, Entergy Louisiana’s, and Entergy New Orleans’s consolidated balance sheets as of June 30, 2025 and December 31, 2024 included the following amounts:

In Thousands · In Thousands

View SEC source
Line itemJune 30, 2025EntergyJune 30, 2025Entergy LouisianaJune 30, 2025Entergy New OrleansDecember 31, 2024EntergyDecember 31, 2024Entergy LouisianaDecember 31, 2024Entergy New Orleans
Deferred fuel$5,829$3,324$2,505$5,608$727$4,881
Fuel inventory - at average cost4,8282954,5334,4937023,791
Materials and supplies7,6041,1726,4325,4511,0454,406
Prepayments and other1,341541,2872222
Total current assets held for sale$19,602$4,845$14,757$15,574$2,474$13,100
Property, plant, and equipment - natural gas$697,812$311,898$385,914$679,502$303,193$376,309
Construction work in progress2,7101,7309802,9591,0851,874
Less - accumulated depreciation and amortization(283,404)(141,818)(141,586)(276,388)(139,556)(136,832)
Other regulatory assets33,5236,93623,66735,3818,94723,682
Goodwill (a)6,5176,474
Pension and other postretirement assets15,17119,95214,66319,499
Other199199206206
Total non-current assets held for sale$472,528$178,746$289,126$462,797$173,669$284,738
Accounts payable$2,945$295$2,650$702$702$—
Customer deposits5,3272,5722,7556,2141,9844,230
Taxes accrued1313
Other1,3525368161,401589812
Total current liabilities held for sale (b)$9,624$3,403$6,221$8,330$3,288$5,042
Regulatory liability for income taxes - net$28,438$3,193$25,245$31,575$4,981$26,594
Other regulatory liabilities2,5799451,6341,6111,214397
Pension and other postretirement liabilities4,2364,6431,6103,9764,5251,197
Other4,1461,4142,7323,8441,1942,650
Total non-current liabilities held for sale (c)$39,399$10,195$31,221$41,006$11,914$30,838

Entergy Corporation and Subsidiaries

Notes to Financial Statements

(a) Goodwill was allocated to the natural gas distribution business based on its relative fair value compared to the retained portion of the reporting unit.

(b) Included within other current liabilities on the respective consolidated balance sheets.

(c) Included within other non-current liabilities on the respective consolidated balance sheets.

Entergy Louisiana and Entergy New Orleans continued to recognize depreciation on the natural gas distribution businesses assets through June 30, 2025 since they received revenues through utility customer rates through the closing of the transaction, and because the final purchase price for the natural gas distribution businesses was adjusted by an amount equal to that depreciation, among other adjustments.

The pre-tax income for the Entergy Louisiana and Entergy New Orleans natural gas distribution businesses, excluding interest and corporate allocations, included in Entergy’s, Entergy Louisiana’s, and Entergy New Orleans’s consolidated income statements for the three and six months ended June 30, 2025 and 2024 is as follows:

In Thousands · In Thousands

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
Entergy$9,484$7,527$31,500$27,459
Entergy Louisiana$2,272$2,754$12,047$12,858
Entergy New Orleans$7,212$4,773$19,453$14,601

On July 1, 2025, Entergy Louisiana and Entergy New Orleans completed the sale of their natural gas distribution businesses. The Entergy Louisiana natural gas distribution business was sold for a purchase price of $203 million and results in an expected gain of $12 million ($9 million net-of-tax), net of $20 million in transaction costs. The Entergy New Orleans natural gas distribution business was sold for a purchase price of $288 million and results in an expected gain of $5 million ($4 million net-of-tax), net of $19 million in transaction costs. The sale of the natural gas distribution businesses results in an expected gain of $11 million ($6 million net-of-tax) for Entergy, which includes goodwill of $7 million that was attributed to the businesses sold and derecognized following the completion of the sale. Entergy New Orleans deferred $4 million of its respective gain as a regulatory liability, which will be amortized over three years beginning September 2026, to be shared with electric utility customers, as required by the City Council. The sale price is subject to a true-up related to the estimated value of assets and liabilities transferred, which may result in subsequent adjustments to the gain recorded in third quarter 2025. Additionally, as a result of the sale, in third quarter 2025, Entergy New Orleans expects to write-off $12 million of natural gas plant assets that were not included in the sale to Delta Capital Gas Company, LLC, and which will not be recovered. See Note 10 to the financial statements herein for discussion of the tax accounting effects of the sale.

In the opinion of the management of Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy, the accompanying unaudited financial statements contain all adjustments (consisting primarily of normal recurring accruals and reclassification of previously reported amounts to conform to current classifications) necessary for a fair statement of the results for the interim periods presented. Entergy’s business is subject to seasonal fluctuations, however, with peak periods occurring typically during the first and third quarters. The results for the interim periods presented should not be used as a basis for estimating results of operations for a full year.

Part I, Item 3. Quantitative and Qualitative Disclosures About Market Risk

See the “Market and Credit Risk Sensitive Instruments” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis.

Part I, Item 4. Controls and Procedures

Disclosure Controls and Procedures

As of June 30, 2025, evaluations were performed under the supervision and with the participation of Entergy Corporation, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, Entergy New Orleans, Entergy Texas, and System Energy (each individually a “Registrant” and collectively the “Registrants”) management, including their respective Principal Executive Officers (PEO) and Principal Financial Officers (PFO). The evaluations assessed the effectiveness of the Registrants’ disclosure controls and procedures. Based on the evaluations, each PEO and PFO has concluded that, as to the Registrant or Registrants for which they serve as PEO or PFO, the Registrant’s or Registrants’ disclosure controls and procedures are effective to ensure that information required to be disclosed by each Registrant in reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized, and reported within the time periods specified in Securities and Exchange Commission rules and forms; and that the Registrant’s or Registrants’ disclosure controls and procedures are also effective in reasonably assuring that such information is accumulated and communicated to the Registrant’s or Registrants’ management, including their respective PEOs and PFOs, as appropriate to allow timely decisions regarding required disclosure.

Changes in Internal Control over Financial Reporting

Under the supervision and with the participation of each Registrant’s management, including its respective PEO and PFO, each Registrant evaluated changes in internal control over financial reporting that occurred during the quarter ended June 30, 2025 and found no change that has materially affected, or is reasonably likely to materially affect, internal control over financial reporting.

ENTERGY ARKANSAS, LLC AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

Second Quarter 2025 Compared to Second Quarter 2024

Net income increased $3.8 million primarily due to higher volume/weather and higher retail electric price, partially offset by higher depreciation and amortization expenses, higher other operation and maintenance expenses, and higher interest expense.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Net income increased $122.6 million primarily due to a $131.8 million ($99.1 million net-of-tax) charge to reflect the write-off of a previously recorded regulatory asset as a result of an adverse decision in the opportunity sales proceeding in March 2024, higher volume/weather, and higher retail electric price, partially offset by higher depreciation and amortization expenses and higher interest expense. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the opportunity sales proceeding.

Operating Revenues

Second Quarter 2025 Compared to Second Quarter 2024

Following is an analysis of the change in operating revenues comparing the second quarter 2025 to the second quarter 2024:

In Millions

View SEC source
Line itemAmount
2024 operating revenues$608.8
Fuel, rider, and other revenues that do not significantly affect net income61.6
Volume/weather14.1
Retail electric price13.2
2025 operating revenues$697.7

Entergy Arkansas’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The volume/weather variance is primarily due to an increase in industrial usage and an increase in weather-adjusted residential usage, partially offset by the effect of less favorable weather on residential sales. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the primary metals and technology industries, and an increase in demand from small industrial customers. The increase in weather-adjusted residential usage is primarily due to an increase in customers.

The retail electric price variance is primarily due to an increase in formula rate plan rates effective January 2025. See Note 2 to the financial statements in the Form 10-K for discussion of the 2024 formula rate plan filing.

Entergy Arkansas, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Total electric energy sales for Entergy Arkansas for the three months ended June 30, 2025 and 2024 are as follows:

Line item20252024% Change
(GWh)
Residential1,6741,855(10)
Commercial1,3931,419(2)
Industrial3,0642,44325
Governmental4950(2)
Total retail6,1805,7677
Sales for resale:
Associated companies5595227
Non-associated companies1,89398293
Total8,6327,27119

See Note 12 to the financial statements herein for additional discussion of Entergy Arkansas’s operating revenues.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Following is an analysis of the change in operating revenues comparing the six months ended June 30, 2025 to the six months ended June 30, 2024:

In Millions

View SEC source
Line itemAmount
2024 operating revenues$1,230.8
Fuel, rider, and other revenues that do not significantly affect net income1.3
Volume/weather49.4
Retail electric price29.7
2025 operating revenues$1,311.2

Entergy Arkansas’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The volume/weather variance is primarily due to an increase in industrial usage and the effect of more favorable weather on residential sales. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the primary metals and technology industries, and an increase in demand from small industrial customers.

The retail electric price variance is primarily due to an increase in formula rate plan rates effective January 2025. See Note 2 to the financial statements in the Form 10-K for discussion of the 2024 formula rate plan filing.

Entergy Arkansas, LLC and Subsidiaries

Management's Financial Discussion and Analysis

Total electric energy sales for Entergy Arkansas for the six months ended June 30, 2025 and 2024 are as follows:

Line item20252024% Change
(GWh)
Residential3,8853,8212
Commercial2,6532,699(2)
Industrial5,6064,71119
Governmental8895(7)
Total retail12,23211,3268
Sales for resale:
Associated companies1,09698411
Non-associated companies2,4561,94926
Total15,78414,25911

See Note 12 to the financial statements herein for additional discussion of Entergy Arkansas’s operating revenues.

Other Income Statement Variances

Second Quarter 2025 Compared to Second Quarter 2024

Other operation and maintenance expenses increased primarily due to an increase of $7.1 million in non-nuclear generation expenses primarily due to a higher scope of work performed during plant outages in 2025 as compared to 2024.

Depreciation and amortization expenses increased primarily due to additions to plant in service, including the Walnut Bend Solar facility, which was placed in service in September 2024, and the West Memphis Solar facility and the Driver Solar facility, which were placed in service in December 2024.

Entergy Arkansas records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

Other income increased primarily due to changes in decommissioning trust fund activity.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Fuel, fuel-related expenses, and gas purchased for resale includes a credit of $9 million, recorded in first quarter 2024, for costs related to net metering. The costs were incurred in 2023 and included within Entergy Arkansas’s annual redetermination of its energy cost recovery rider filed in March 2024 due to a change in law in the state of Arkansas. See Note 2 to the financial statements in the Form 10-K for discussion of the March 2024 energy cost recovery rider filing.

Other operation and maintenance expenses decreased slightly primarily due to:

  • contract costs of $5.8 million in 2024 related to operational performance, customer service, and organizational health initiatives;
  • a decrease of $4.7 million in power delivery expenses primarily due to a lower scope of work performed in 2025 as compared to 2024; and

Entergy Arkansas, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

  • a decrease of $4.9 million in nuclear generation expenses primarily due to a lower scope of work performed in 2025 as compared to 2024.

The decrease was substantially offset by an increase of $12 million in non-nuclear generation expenses primarily due to a higher scope of work performed during plant outages in 2025 as compared to 2024.

Asset write-offs includes a $131.8 million charge to reflect the write-off of a previously recorded regulatory asset as a result of an adverse decision in the opportunity sales proceeding in March 2024. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the opportunity sales proceeding.

Depreciation and amortization expenses increased primarily due to additions to plant in service, including the Walnut Bend Solar facility, which was placed in service in September 2024, and the West Memphis Solar facility and the Driver Solar facility, which were placed in service in December 2024.

Entergy Arkansas records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

Other income decreased primarily due to changes in decommissioning trust fund activity, including portfolio rebalancing of decommissioning trust funds in 2024.

Interest expense increased primarily due to the issuances of $400 million of 5.75% Series mortgage bonds and $400 million of 5.45% Series mortgage bonds, each in May 2024. The increase was partially offset by the repayment of $375 million of 3.70% Series mortgage bonds in June 2024.

Income Taxes

The effective income tax rates were 20.6% for the second quarter 2025 and 20.8% for the six months ended June 30, 2025. The differences in the effective income tax rates for the second quarter 2025 and the six months ended June 30, 2025 versus the federal statutory rate of 21% were primarily due to the amortization of excess accumulated deferred income taxes as a result of tax rate changes and certain book and tax differences related to utility plant items, partially offset by the accrual for state income taxes.

The effective income tax rate was 25.2% for the second quarter 2024. The difference in the effective income tax rate for the second quarter 2024 versus the federal statutory rate of 21% was primarily due to the accrual for state income taxes and the amortization of accumulated deferred income taxes as a result of tax rate changes, partially offset by certain book and tax differences related to utility plant items and book and tax differences related to the allowance for equity funds used during construction.

The effective income tax rate was 25.4% for the six months ended June 30, 2024. The difference in the effective income tax rate for the six months ended June 30, 2024 versus the federal statutory rate of 21% was primarily due to the amortization of accumulated deferred income taxes as a result of tax rate changes and the accrual for state income taxes, partially offset by certain book and tax differences related to utility plant items and book and tax differences related to the allowance for equity funds used during construction.

Income Tax Legislation and Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Income Tax Legislation and Regulation” herein and in the Form 10-K for discussion of income tax legislation and regulation. See Note 10 to the financial statements herein for discussion of the nuclear production tax credits recorded in second quarter 2025.

Entergy Arkansas, LLC and Subsidiaries

Management's Financial Discussion and Analysis

Liquidity and Capital Resources

Cash Flow

Cash flows for the six months ended June 30, 2025 and 2024 were as follows:

In Thousands

View SEC source
Line item20252024
Cash and cash equivalents at beginning of period$4,747$3,632
Net cash provided by (used in):
Operating activities437,887524,708
Investing activities(493,179)(721,529)
Financing activities277,533979,521
Net increase in cash and cash equivalents222,241782,700
Cash and cash equivalents at end of period$226,988$786,332

Operating Activities

Net cash flow provided by operating activities decreased $86.8 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to:

  • the receipt of $92 million in settlement proceeds in May 2024 as a result of the System Energy settlement with the APSC. See Note 2 to the financial statements in the Form 10-K for a discussion of the System Energy settlement agreement with the APSC;
  • higher fuel and purchased power payments. See Note 2 to the financial statements herein and in the Form 10-K for a discussion of fuel and purchased power cost recovery; and
  • the timing of payments to vendors.

The decrease was partially offset by higher collections from customers and a decrease of $14.6 million in spending on nuclear refueling outages in 2025 as compared to 2024.

Investing Activities

Net cash flow used in investing activities decreased $228.4 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to:

  • the initial payment of approximately $169.7 million in February 2024 for the purchase of the Walnut Bend Solar facility. See Note 14 to the financial statements in the Form 10-K for discussion of the Walnut Bend Solar facility purchase;
  • money pool activity;
  • a decrease of $27.7 million in information technology capital expenditures primarily due to decreased spending on technology upgrade projects in 2025; and
  • a decrease of $26.9 million in transmission construction expenditures primarily due to decreased spending on various transmission projects in 2025.

The decrease was partially offset by an increase of $50.8 million in non-nuclear generation construction expenditures primarily due to higher spending on the Lake Catherine Unit 5 project and an increase of $36.3 million in distribution construction expenditures primarily due to higher capital expenditures for storm restoration in 2025.

Entergy Arkansas, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Increases in Entergy Arkansas’s receivable from the money pool are a use of cash flow, and Entergy Arkansas’s receivable from the money pool increased $49 million for the six months ended June 30, 2025 compared to increasing by $130.6 million for the six months ended June 30, 2024. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and other borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings.

Financing Activities

Net cash flow provided by financing activities decreased $702 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to:

  • the issuances of $400 million of 5.45% Series mortgage bonds and $400 million of 5.75% Series mortgage bonds, each in May 2024;
  • capital contributions of approximately $695 million received from Entergy Corporation in 2024 to partially finance the acquisitions of the Walnut Bend Solar facility, the West Memphis Solar facility, and the Driver Solar facility;
  • the issuance of $70 million of 5.54% Series O notes by the Entergy Arkansas nuclear fuel company variable interest entity in March 2024; and
  • a decrease of $32.5 million in advance payments from customers for construction related to transmission, distribution, and generator interconnection agreements.

The decrease was partially offset by:

  • the repayment, at maturity, of $375 million of 3.70% Series mortgage bonds in June 2024;
  • the issuance of $300 million of 5.45% Series mortgage bonds in May 2025;
  • money pool activity; and
  • net long-term borrowings of $10.7 million in 2025 compared to net repayments of $70.2 million in 2024 on the nuclear fuel company variable interest entity’s credit facility.

Decreases in Entergy Arkansas’s payable to the money pool are a use of cash flow, and Entergy Arkansas’s payable to the money pool decreased $15.2 million for the six months ended June 30, 2025 compared to decreasing by $145.4 million for the six months ended June 30, 2024.

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Capital Structure

Entergy Arkansas’s debt to capital ratio is shown in the following table.

Line itemJune 30, 2025December 31, 2024
Debt to capital54.1%53.6%
Effect of subtracting cash(1.1%)
Net debt to net capital (non-GAAP)53.0%53.6%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. Entergy Arkansas uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Arkansas’s financial condition. The net debt to net capital ratio is a non-GAAP measure.

Entergy Arkansas, LLC and Subsidiaries

Management's Financial Discussion and Analysis

Entergy Arkansas also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Arkansas’s financial condition because net debt indicates Entergy Arkansas’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Arkansas’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Following are the current annual amounts of Entergy Arkansas’s planned construction and other capital investments.

In Millions

View SEC source
Line item202520262027
Planned construction and capital investment:
Generation$565$1,270$1,480
Transmission8585110
Distribution320295320
Utility Support1055040
Total$1,075$1,700$1,950

The updated capital plan for 2025-2027 reflects incremental capital investments for potential generation projects. In addition to routine capital spending to maintain operations, the capital plan includes investments in generation projects to modernize, decarbonize, expand, and diversify Entergy Arkansas’s portfolio, as well as to support customer growth, including Lake Catherine Unit 5 and Jefferson Power Station; investments in ANO 1 and 2; distribution and Utility support spending to improve reliability, resilience, and customer experience; transmission spending to improve reliability and resilience while also supporting renewables expansion; and other investments.

Recent announcements of changes to international trade policy and tariffs and further similar changes may impact Entergy Arkansas’s business, operations, results of operations, and liquidity and capital resources. Potential impacts may include increases in costs associated with Entergy Arkansas’s capital investments or operation and maintenance expenses; operational impacts, such as supply chain, manufacturing, or raw materials sourcing disruptions which may affect Entergy Arkansas’s ability to make planned capital investments as and when expected and needed; legal uncertainties, such as potential legal or other challenges to presidential tariff authority; or broader economic risks, including shifting customer demand, impacts on customer investment decisions, and volatile or uncertain credit and capital markets, which may affect Entergy Arkansas’s ability to access needed capital. The nature and extent of any such effects will depend on, among other things, the specifics of the changes that are ultimately implemented both domestically and internationally, the responses of vendors, suppliers, and other counterparties to those changes, indirect effects on the price and availability of non-tariffed goods, and the effectiveness of mitigation measures.

Entergy Arkansas’s receivables from or (payables to) the money pool were as follows:

In Thousands

View SEC source
June 30, 2025December 31, 2024June 30, 2024December 31, 2023
$49,019($15,190)$130,602($145,385)

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

Entergy Arkansas, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Entergy Arkansas has a credit facility in the amount of $300 million scheduled to expire in June 2030. Entergy Arkansas also has a $25 million credit facility scheduled to expire in April 2026. The $300 million credit facility includes fronting commitments for the issuance of letters of credit against $5 million of the borrowing capacity of the facility. As of June 30, 2025, there were no cash borrowings under either credit facility and no letters of credit outstanding under the $300 million credit facility. In addition, Entergy Arkansas is a party to two uncommitted letter of credit facilities as a means to post collateral to support its obligations to MISO. As of June 30, 2025, $23.6 million in letters of credit were outstanding under one of Entergy Arkansas’s uncommitted letter of credit facilities. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

The Entergy Arkansas nuclear fuel company variable interest entity has a credit facility in the amount of $80 million scheduled to expire in June 2027. As of June 30, 2025, there were $33.2 million in loans outstanding under the credit facility for the Entergy Arkansas nuclear fuel company variable interest entity. See Note 4 to the financial statements herein for discussion of the nuclear fuel company variable interest entity credit facility.

Lake Catherine Unit 5

As discussed in the Form 10-K, in November 2024, Entergy Arkansas filed an application with the APSC seeking a certificate of environmental compatibility and public need for the construction and operation of Lake Catherine Unit 5, a 446 MW hydrogen-capable simple-cycle natural gas combustion turbine facility to be located at the existing Lake Catherine facility site in Hot Spring County, Arkansas. In December 2024 other parties, including the APSC general staff, filed testimony opposing the resource, although the APSC general staff recognized the capacity need for the resource. Entergy Arkansas filed testimony in January 2025 further supporting its application, and in February 2025 the opposing parties filed responsive rebuttal testimony continuing to dispute the estimated costs and to dispute that Entergy Arkansas performed a market solicitation sufficient to demonstrate that this resource is the most reasonable option for customers. Also in February 2025, Entergy Arkansas filed surrebuttal testimony responding to the opposing parties’ testimony. A hearing was held in March 2025, and in April 2025 the APSC issued an order approving certification of the facility. The order also provided a presumption of prudence finding with respect to a benchmark project cost. In May 2025, Entergy Arkansas filed a motion for clarification concerning the appropriate calculation of the benchmark. Entergy Arkansas will have the opportunity to later present all actual costs to the APSC for review and a prudence determination, including costs incremental to the benchmark. The facility is expected to be in service by the end of 2028.

Jefferson Power Station

Entergy Arkansas expects to file an application with the APSC in third quarter 2025 seeking a certificate of environmental compatibility and public need for the construction and operation of Jefferson Power Station, an approximately 754 MW natural gas-fired combined cycle combustion turbine facility. Subject to receipt of required regulatory approval and other conditions, the facility is expected to be in service by the end of 2029.

State and Local Rate Regulation and Fuel-Cost Recovery

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – State and Local Rate Regulation and Fuel-Cost Recovery” in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery. The following are updates to that discussion.

Retail Rates

2025 Formula Rate Plan Filing

In July 2025, Entergy Arkansas filed with the APSC its 2025 formula rate plan filing to set its formula rate for the 2026 calendar year. The filing contained an evaluation of Entergy Arkansas’s earnings for the 2026

Entergy Arkansas, LLC and Subsidiaries

Management's Financial Discussion and Analysis

projected year and a netting adjustment for the 2024 historical year. The filing showed that Entergy Arkansas’s earned rate of return on common equity for the 2026 projected year was 8.45% resulting in a revenue deficiency of $68.9 million. The earned rate of return on common equity for the 2024 historical year was 7.71% resulting in a $48.8 million netting adjustment. The total proposed revenue change for the 2026 projected year and 2024 historical year netting adjustment is $117.7 million. By operation of the formula rate plan, Entergy Arkansas’s recovery of the revenue requirement is subject to a four percent annual revenue constraint. Because Entergy Arkansas’s revenue requirement in this filing exceeded the constraint, the resulting increase was limited to $92.3 million. Entergy Arkansas proposed a procedural schedule that includes a hearing in November 2025 and requests an APSC order in December 2025.

Grand Gulf Credit Rider

As discussed in the Form 10-K, in June 2024, Entergy Arkansas filed with the APSC a tariff to provide retail customers a credit resulting from the terms of the settlement agreement between Entergy Arkansas, System Energy, additional named Entergy parties, and the APSC pertaining to System Energy’s billings for wholesale sales of energy and capacity from the Grand Gulf nuclear plant. See “Complaints Against System Energy - System Energy Settlement with the APSC” in Note 2 to the financial statements in the Form 10-K for discussion of the System Energy settlement with the APSC. In July 2024 the APSC approved the tariff, under which Entergy Arkansas would refund to retail customers a total of $100.6 million. Entergy Arkansas refunded $92.3 million of the total through one-time bill credits under the Grand Gulf credit rider during the August 2024 billing cycle. In March 2025, Entergy Arkansas included the remaining balance as a credit to retail customers in its energy cost recovery rider rate redetermination filing. See further discussion within “Energy Cost Recovery Rider” below. In April 2025 the APSC approved Entergy Arkansas’s proposal to include the remaining balance in its energy cost recovery rider effective with the first billing cycle of April 2025 and the withdrawal of the Grand Gulf credit rider after all credits had been issued. Credits to retail customers were completed in second quarter 2025, and the Grand Gulf credit rider was subsequently withdrawn.

Energy Cost Recovery Rider

In March 2025, Entergy Arkansas filed its annual redetermination of its energy cost rate pursuant to the energy cost recovery rider, which reflected an increase in the rate from $0.00882 per kWh to $0.01333 per kWh. The annual redetermination included a credit related to the remaining balance due to retail customers from the System Energy settlement with the APSC, plus carrying charges and interest. See “Retail Rates - Grand Gulf Credit Rider” above for further discussion. The primary reason for the rate increase is an adjustment to account for projected increases in natural gas prices in 2025. This adjustment is expected to reduce the rate change that will be reflected in its 2026 energy cost rate redetermination. The redetermined rate of $0.01333 per kWh became effective with the first billing cycle in April 2025 through the normal operation of the tariff.

Opportunity Sales Proceeding

As discussed in the Form 10-K, in September 2020, Entergy Arkansas filed a complaint in the U.S. District Court for the Eastern District of Arkansas challenging the APSC’s denial of recovery of $135 million of payments to other Utility operating companies in December 2018 relating to off-system sales of electricity from 2002-2009, as ordered by the FERC. The complaint also involved a challenge to the $13.7 million, plus interest, of related refunds ordered by the APSC and paid by Entergy Arkansas in August 2020. The trial was held in February 2023.

In March 2024 the U.S. District Court for the Eastern District of Arkansas issued a judgment in favor of the APSC and against Entergy Arkansas. In March 2024 Entergy Arkansas filed a notice of appeal and a motion to expedite oral arguments with the United States Court of Appeals for the Eighth Circuit and the court granted the motion to expedite. As a result of the adverse decision by the U.S. District Court for the Eastern District of Arkansas, Entergy Arkansas concluded that it could no longer support the recognition of its $131.8 million regulatory asset reflecting the previously-expected recovery of a portion of the costs at issue in the opportunity sales

Entergy Arkansas, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

proceeding and recorded a $131.8 million ($99.1 million net-of-tax) charge to earnings in first quarter 2024. In December 2024 the United States Court of Appeals for the Eighth Circuit affirmed the decision of the U.S. District Court for the Eastern District of Arkansas, and Entergy Arkansas filed a petition for rehearing en banc. In January 2025 the United States Court of Appeals for the Eighth Circuit denied Entergy Arkansas’s petition. In April 2025, Entergy Arkansas filed a petition for certiorari with the United States Supreme Court. In June 2025 the United States Supreme Court denied Entergy Arkansas’s petition for certiorari.

Generating Arkansas Jobs Act of 2025

In March 2025 the State of Arkansas passed the Generating Arkansas Jobs Act of 2025, now Act 373 (Act 373), that authorizes the recovery of financing costs during construction of generation and transmission investments through a rider separate from the formula rate plan. Act 373 also permits cost recovery of those investments when completed and in service, either through the next general rate case proceeding or under the formula rate plan. Act 373 streamlines and simplifies the regulatory approval process and provides increased timeliness and certainty of cost recovery.

In July 2025, Entergy Arkansas submitted a tariff filing with the APSC requesting approval of a strategic investment recovery rider, consistent with the provisions of Act 373. Entergy Arkansas requested the APSC issue an order approving the rider by October 2025. A procedural schedule has been established with a hearing in September 2025.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation” in the Form 10-K for a discussion of federal regulation.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Arkansas’s accounting for nuclear decommissioning costs, utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

  • (Unaudited)
  • (In Thousands)
  • (In Thousands)_

CONSOLIDATED INCOME STATEMENTS

For the Three and Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands · In Thousands

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
OPERATING REVENUES
Electric$697,687$608,798$1,311,198$1,230,843
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale113,09352,756160,652159,195
Purchased power58,96455,602123,911107,922
Nuclear refueling outage expenses10,66814,10121,24928,189
Other operation and maintenance180,510174,835352,028352,876
Asset write-offs131,775
Decommissioning24,98822,83249,61045,479
Taxes other than income taxes35,43034,39071,41170,614
Depreciation and amortization117,121103,966230,389206,957
Other regulatory charges (credits) - net(7,763)(20,934)(12,880)27,685
TOTAL533,011437,548996,3701,130,692
OPERATING INCOME164,676171,250314,828100,151
OTHER INCOME
Allowance for equity funds used during construction5,3555,8629,61711,394
Interest and investment income14,8015,18128,38077,941
Miscellaneous - net(3,547)(2,799)(6,325)(6,380)
TOTAL16,6098,24431,67282,955
INTEREST EXPENSE
Interest expense59,05754,879116,800104,144
Allowance for borrowed funds used during construction(2,642)(2,864)(4,695)(5,563)
TOTAL56,41552,015112,10598,581
INCOME BEFORE INCOME TAXES124,870127,479234,39584,525
Income taxes25,67732,12048,67921,446
NET INCOME99,19395,359185,71663,079
Net loss attributable to noncontrolling interest(889)(825)(2,080)(2,643)
EARNINGS APPLICABLE TO MEMBER'S EQUITY$100,082$96,184$187,796$65,722
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED STATEMENTS OF CASH FLOWS

For the Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
OPERATING ACTIVITIES
Net income$185,716$63,079
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization324,540287,564
Deferred income taxes, investment tax credits, and non-current taxes accrued65,49441,130
Asset write-offs131,775
Changes in assets and liabilities:
Receivables(63,276)67,067
Fuel inventory(14,868)10,890
Accounts payable43,55126,093
Taxes accrued(19,741)(15,496)
Interest accrued694,647
Deferred fuel costs(33,234)2,317
Other working capital accounts(25,426)(13,243)
Provisions for estimated losses(2,436)5,725
Other regulatory assets(4,658)179,719
Other regulatory liabilities65,97071,529
Pension and other postretirement funded status(20,651)(27,588)
Other assets and liabilities(63,163)(310,500)
Net cash flow provided by operating activities437,887524,708
INVESTING ACTIVITIES
Construction expenditures(400,384)(394,973)
Allowance for equity funds used during construction9,61711,394
Payment for purchase of plant(1,608)(169,694)
Nuclear fuel purchases(73,283)(65,010)
Proceeds from sale of nuclear fuel40,60133,213
Proceeds from nuclear decommissioning trust fund sales51,462412,931
Investment in nuclear decommissioning trust funds(70,616)(418,818)
Changes in money pool receivable - net(49,019)(130,602)
Decrease in other investments5130
Net cash flow used in investing activities(493,179)(721,529)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt350,312970,030
Retirement of long-term debt(40,311)(555,411)
Capital contributions from parent695,000
Changes in money pool payable - net(15,190)(145,385)
Other(17,278)15,287
Net cash flow provided by financing activities277,533979,521
Net increase in cash and cash equivalents222,241782,700
Cash and cash equivalents at beginning of period4,7473,632
Cash and cash equivalents at end of period$226,988$786,332
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid during the period for:
Interest - net of amount capitalized$115,404$49,597
Income taxes$—$1,569
Noncash investing activities:
Accrued construction expenditures$77,169$36,355
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED BALANCE SHEETS · ASSETS

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT ASSETS
Cash and cash equivalents:
Cash$44,574$1,306
Temporary cash investments182,4143,441
Total cash and cash equivalents226,9884,747
Accounts receivable:
Customer156,578139,234
Allowance for doubtful accounts(6,356)(4,672)
Associated companies82,91335,412
Other97,18870,927
Accrued unbilled revenues148,697125,824
Total accounts receivable479,020366,725
Fuel inventory - at average cost64,80549,937
Materials and supplies426,029384,238
Deferred nuclear refueling outage costs27,40848,879
Prepayments and other55,24941,404
TOTAL1,279,499895,930
OTHER PROPERTY AND INVESTMENTS
Decommissioning trust funds1,686,6521,604,428
Other795797
TOTAL1,687,4471,605,225
UTILITY PLANT
Electric16,502,57616,371,182
Construction work in progress576,593320,447
Nuclear fuel229,701257,533
TOTAL UTILITY PLANT17,308,87016,949,162
Less - accumulated depreciation and amortization6,452,9256,275,150
UTILITY PLANT - NET10,855,94510,674,012
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets1,704,7681,700,110
Other212,976198,706
TOTAL1,917,7441,898,816
TOTAL ASSETS$15,740,635$15,073,983
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED BALANCE SHEETS · LIABILITIES AND EQUITY

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT LIABILITIES
Currently maturing long-term debt$600,000$—
Accounts payable:
Associated companies49,65385,137
Other310,648210,040
Customer deposits132,692129,267
Taxes accrued73,47493,215
Interest accrued38,44638,377
Deferred fuel costs11,92445,158
Other64,93255,313
TOTAL1,281,769656,507
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued1,550,5331,489,169
Accumulated deferred investment tax credits25,46926,069
Regulatory liability for income taxes - net425,296417,561
Other regulatory liabilities889,400831,165
Decommissioning1,741,1941,691,583
Accumulated provisions74,04376,479
Long-term debt4,838,0335,122,494
Other265,633298,951
TOTAL9,809,6019,953,471
Commitments and Contingencies
EQUITY
Member's equity4,636,6334,448,837
Noncontrolling interest12,63215,168
TOTAL4,649,2654,464,005
TOTAL LIABILITIES AND EQUITY$15,740,635$15,073,983
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY

For the Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands

View SEC source
Line itemNoncontrolling InterestMember's EquityTotal
Balance at December 31, 2023$21,599$3,739,071$3,760,670
Net loss(1,818)(30,462)(32,280)
Capital contribution from parent275,000275,000
Distributions to noncontrolling interest(250)(250)
Balance at March 31, 202419,5313,983,6094,003,140
Net income (loss)(825)96,18495,359
Capital contribution from parent420,000420,000
Distributions to noncontrolling interest(31)(31)
Balance at June 30, 2024$18,675$4,499,793$4,518,468
Balance at December 31, 2024$15,168$4,448,837$4,464,005
Net income (loss)(1,191)87,71486,523
Distributions to noncontrolling interest(181)(181)
Balance at March 31, 202513,7964,536,5514,550,347
Net income (loss)(889)100,08299,193
Distributions to noncontrolling interest(275)(275)
Balance at June 30, 2025$12,632$4,636,633$4,649,265
See Notes to Financial Statements.

ENTERGY LOUISIANA, LLC AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

Second Quarter 2025 Compared to Second Quarter 2024

Net income increased $169.1 million primarily due to expenses of $151.5 million ($110.7 million net-of-tax), recorded in second quarter 2024, primarily consisting of regulatory charges to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023. Also contributing to the increase was higher other income. The increase was partially offset by higher depreciation and amortization expenses and higher interest expense. See Note 2 to the financial statements in the Form 10-K for discussion of the agreement in principle and the subsequently filed global stipulated settlement agreement.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Net income increased $240.5 million primarily due to expenses of $151.5 million ($110.7 million net-of-tax), recorded in second quarter 2024, primarily consisting of regulatory charges to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023. Also contributing to the increase were higher other income, higher volume/weather, and higher retail electric price. The increase was partially offset by higher depreciation and amortization expenses and higher interest expense. See Note 2 to the financial statements in the Form 10-K for discussion of the agreement in principle and the subsequently filed global stipulated settlement agreement.

Operating Revenues

Second Quarter 2025 Compared to Second Quarter 2024

Following is an analysis of the change in operating revenues comparing the second quarter 2025 to the second quarter 2024:

In Millions

View SEC source
Line itemAmount
2024 operating revenues$1,276.1
Fuel, rider, and other revenues that do not significantly affect net income221.8
Retail electric price11.6
Volume/weather0.6
2025 operating revenues$1,510.1

Entergy Louisiana’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

The retail electric price variance is primarily due to an increase in formula rate plan revenues, including an increase in the distribution recovery mechanism, effective September 2024. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the 2023 formula rate plan proceeding.

The volume/weather variance is insignificant and primarily due to an increase in weather-adjusted residential usage and an increase in commercial and industrial usage, substantially offset by the effect of less favorable weather on residential sales. The increase in weather-adjusted residential usage and the increase in commercial usage are primarily due to an increase in customers. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the chlor-alkali and industrial gases industries. The increased usage from these industrial customers has a relatively smaller effect on operating revenues because a larger portion of the revenues from these customers comes from fixed charges.

Total electric energy sales for Entergy Louisiana for the three months ended June 30, 2025 and 2024 are as follows:

Line item20252024% Change
(GWh)
Residential3,5833,913(8)
Commercial2,8862,881
Industrial9,1838,4149
Governmental203209(3)
Total retail15,85515,4173
Sales for resale:
Associated companies1,5331,4823
Non-associated companies167395(58)
Total17,55517,2942

See Note 12 to the financial statements herein for additional discussion of Entergy Louisiana’s operating revenues.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Following is an analysis of the change in operating revenues comparing the six months ended June 30, 2025 to the six months ended June 30, 2024:

In Millions

View SEC source
Line itemAmount
2024 operating revenues$2,478.6
Fuel, rider, and other revenues that do not significantly affect net income262.0
Retail electric price37.1
Volume/weather33.9
2025 operating revenues$2,811.6

Entergy Louisiana’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The volume/weather variance is primarily due to an increase in weather-adjusted residential usage, an increase in commercial and industrial usage, and the effect of more favorable weather on residential sales. The

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

increase in weather-adjusted residential usage and the increase in commercial usage are primarily due to an increase in customers. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the chlor-alkali, petroleum refining, and industrial gases industries.

The retail electric price variance is primarily due to an increase in formula rate plan revenues, including an increase in the distribution recovery mechanism, effective September 2024. See Note 2 to the financial statements herein and in the Form 10-K for discussion of the 2023 formula rate plan proceeding.

Total electric energy sales for Entergy Louisiana for the six months ended June 30, 2025 and 2024 are as follows:

Line item20252024% Change
(GWh)
Residential6,7536,728
Commercial5,3185,335
Industrial17,71616,17510
Governmental398408(2)
Total retail30,18528,6465
Sales for resale:
Associated companies2,9812,7409
Non-associated companies395777(49)
Total33,56132,1634

See Note 12 to the financial statements herein for additional discussion of Entergy Louisiana’s operating revenues.

Other Income Statement Variances

Second Quarter 2025 Compared to Second Quarter 2024

Other operation and maintenance expenses increased slightly primarily due to:

  • an increase of $6.9 million in non-nuclear generation expenses primarily due to a higher scope of work performed during plant outages in 2025 as compared to 2024;
  • an increase of $3.3 million in power delivery expenses primarily due to higher vegetation maintenance costs; and
  • several individually insignificant items.

The increase was substantially offset by:

  • a decrease of $10.1 million in nuclear generation expenses primarily due to a lower scope of work performed in 2025 as compared to 2024;
  • contract costs of $4.4 million, in second quarter 2024, related to operational performance, customer service, and organizational health initiatives; and
  • a decrease of $4.4 million in energy efficiency expenses primarily due to the timing of recovery from customers, partially offset by higher energy efficiency costs.

Depreciation and amortization expenses increased primarily due to additions to plant in service and an increase in nuclear depreciation rates effective September 2024 in accordance with the global stipulated settlement agreement approved by the LPSC in August 2024. See Note 2 to the financial statements in the Form 10-K for discussion of the global stipulated settlement agreement.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Other regulatory charges (credits) - net includes regulatory charges of $150.2 million, recorded in second quarter 2024, to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023. See Note 2 to the financial statements in the Form 10-K for discussion of the agreement in principle and the subsequently filed global stipulated settlement agreement. In addition, Entergy Louisiana records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue.

Other income increased primarily due to:

  • a $17.1 million true-up of Entergy Louisiana's MISO cost recovery mechanism over-recovery balance to the 2024 formula rate plan filing, which was filed with the LPSC in May 2025. See Note 2 to the financial statements herein for discussion of the 2024 formula rate plan filing;
  • an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2025, including the projects for new generation resources in north Louisiana;
  • an increase of $6.9 million in the amortization of tax gross ups on customer advances for construction; and
  • an increase of $5.4 million in interest earned on money pool investments.

The increase was partially offset by a decrease of $4.3 million in affiliated dividend income from affiliated preferred membership interests related to storm cost securitization.

Interest expense increased primarily due to the issuance of $700 million of 5.15% Series mortgage bonds in August 2024, the issuance of $750 million of 5.80% Series mortgage bonds in January 2025, and carrying costs of $7.3 million in 2025 on customer advances for construction. The increase was partially offset by an increase in the allowance for borrowed funds used during construction due to higher construction work in progress in 2025.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Other operation and maintenance expenses decreased primarily due to:

  • a decrease of $10.3 million in nuclear generation expenses primarily due to a lower scope of work performed, including during plant outages, in 2025 as compared to 2024;
  • contract costs of $8.8 million in 2024 related to operational performance, customer service, and organizational health initiatives; and
  • a decrease of $4.4 million in energy efficiency expenses primarily due to the timing of recovery from customers, partially offset by higher energy efficiency costs.

The decrease was partially offset by:

  • an increase of $5.1 million in loss provisions;
  • an increase of $4.5 million in non-nuclear power generation expenses primarily due to a higher scope of work performed during plant outages in 2025 as compared to 2024;
  • an increase of $4.3 million in transmission costs allocated by MISO. See Note 2 to the financial statements in the Form 10-K for discussion of the recovery of these costs; and
  • several individually insignificant items.

Depreciation and amortization expenses increased primarily due to additions to plant in service and an increase in nuclear depreciation rates effective September 2024 in accordance with the global stipulated settlement

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

agreement approved by the LPSC in August 2024. See Note 2 to the financial statements in the Form 10-K for discussion of the global stipulated settlement agreement.

Other regulatory charges (credits) - net includes regulatory charges of $150.2 million, recorded in second quarter 2024, to reflect the effects of an agreement in principle between Entergy Louisiana and the LPSC staff and the intervenors in July 2024 to renew Entergy Louisiana’s formula rate plan and resolve a number of other retail dockets and matters, including all formula rate plan test years prior to 2023. In addition, Entergy Louisiana records a regulatory charge or credit for the difference between asset retirement obligation-related expenses and nuclear decommissioning trust earnings plus asset retirement obligation-related costs collected in revenue. See Note 2 to the financial statements in the Form 10-K for discussion of the agreement in principle and the subsequently filed global stipulated settlement agreement.

Other income increased primarily due to:

  • an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2025, including the projects for new generation resources in north Louisiana;
  • a $17.1 million true-up of Entergy Louisiana's MISO cost recovery mechanism over-recovery balance to the 2024 formula rate plan filing, which was filed with the LPSC in May 2025. See Note 2 to the financial statements herein for discussion of the 2024 formula rate plan filing;
  • an increase of $14.2 million in interest earned on money pool investments; and
  • an increase of $13.4 million in the amortization of tax gross ups on customer advances for construction.

The increase was offset by changes in decommissioning trust fund activity, including portfolio rebalancing of the River Bend decommissioning trust fund in 2024, and a decrease of $8.7 million in affiliated dividend income from affiliated preferred membership interests related to storm cost securitization.

Interest expense increased primarily due to the issuance of $700 million of 5.15% Series mortgage bonds in August 2024, the issuance of $750 million of 5.80% Series mortgage bonds in January 2025, and carrying costs of $12.1 million in 2025 on customer advances for construction. The increase was partially offset by an increase in the allowance for borrowed funds used during construction due to higher construction work in progress in 2025.

Income Taxes

The effective income tax rates were 19.5% for the second quarter 2025 and 18.6% for the six months ended June 30, 2025. The differences in the effective income tax rates for the second quarter 2025 and the six months ended June 30, 2025 versus the federal statutory rate of 21% were primarily due to the book and tax differences related to the non-taxable income distributions earned on preferred membership interests, book and tax differences related to the allowance for equity funds used during construction, and certain book and tax differences related to utility plant items, partially offset by the accrual for state income taxes.

The effective income tax rate was 13.7% for the second quarter 2024 and 16% for the six months ended June 30, 2024. The differences in the effective income tax rates for the second quarter 2024 and for the six months ended June 30, 2024 versus the federal statutory rate of 21% were primarily due to the book and tax differences related to the non-taxable income distributions earned on preferred membership interests and certain book and tax differences related to utility plant items, partially offset by the accrual for state income taxes and the amortization of state accumulated deferred income taxes as a result of tax rate changes.

Income Tax Legislation and Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Income Tax Legislation and Regulation” herein and in the Form 10-K for discussion of income tax legislation and regulation. See Note 10 to the financial statements herein for discussion of the nuclear production tax credits recorded in second quarter 2025.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Sale of Natural Gas Distribution Business

See Note 13 to the financial statements herein and the “Held For Sale - Natural Gas Distribution Businesses” section in Note 14 to the financial statements in the Form 10-K discussion of the sale of Entergy Louisiana’s gas distribution business on July 1, 2025.

Liquidity and Capital Resources

Cash Flow

Cash flows for the six months ended June 30, 2025 and 2024 were as follows:

In Thousands

View SEC source
Line item20252024
Cash and cash equivalents at beginning of period$327,102$2,772
Net cash provided by (used in):
Operating activities978,699808,398
Investing activities(1,467,670)(639,095)
Financing activities461,31913,706
Net increase (decrease) in cash and cash equivalents(27,652)183,009
Cash and cash equivalents at end of period$299,450$185,781

Operating Activities

Net cash flow provided by operating activities increased $170.3 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to the receipt of $204.7 million in advance payments related to customer agreements in 2025, which are recorded as current liabilities and included within changes in other working capital accounts, and higher collections from customers. The increase was partially offset by:

  • higher fuel and purchased power payments and the timing of recovery of fuel and purchased power costs. See Note 2 to the financial statements herein and in the Form 10-K for a discussion of fuel and purchased power cost recovery;
  • an increase of $45.4 million in interest paid; and
  • an increase of $19 million in spending on nuclear refueling outages in 2025 as compared to 2024.

Investing Activities

Net cash flow used in investing activities increased $828.6 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to:

  • an increase of $347.7 million in non-nuclear generation construction expenditures primarily due to higher spending on new generation resources in north Louisiana and the Sterlington solar project;
  • an increase of $183.9 million in distribution construction expenditures primarily due to increased investment in the resilience of the distribution system;
  • an increase of $135.7 million in transmission construction expenditures primarily due to higher capital expenditures as a result of increased development in Entergy Louisiana’s service area, higher spending on the Commodore transmission projects, and increased spending on various other transmission projects in 2025;

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

  • an increase in cash used of $98.9 million as a result of fluctuations in nuclear fuel activity due to variations from year to year in the timing and pricing of fuel reload requirements, materials and services deliveries, and the timing of cash payments during the nuclear fuel cycle;
  • an increase of $94.5 million in nuclear construction expenditures primarily due to increased spending on various nuclear projects in 2025; and
  • money pool activity.

The increase was partially offset by the receipt of $33.5 million from the storm reserve escrow account in 2025 and a decrease of $22.8 million in information technology capital expenditures primarily due to decreased spending on technology upgrade projects in 2025. See Note 2 to the financial statements herein for a discussion of the storm reserve funds.

Increases in Entergy Louisiana’s receivable from the money pool are a use of cash flow, and Entergy Louisiana’s receivable from the money pool increased $48.5 million for the six months ended June 30, 2025 compared to increasing by $31.4 million for the six months ended June 30, 2024. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and other borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings.

Financing Activities

Net cash flow provided by financing activities increased $447.6 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to:

  • the issuance of $750 million of 5.80% Series mortgage bonds in January 2025;
  • the repayment, prior to maturity, of $400 million of 5.40% Series mortgage bonds in April 2024;
  • an increase of $357.3 million in net customer advances for construction related to transmission, distribution, and generator interconnection agreements;
  • a decrease of $169.1 million in common equity distributions paid in 2025 in order to maintain Entergy Louisiana’s capital structure;
  • money pool activity; and
  • net long-term borrowings of $92.9 million in 2025 compared to net repayments of $27.1 million in 2024 on the nuclear fuel company variable interest entities’ credit facilities.

The increase was partially offset by:

  • the issuances of $500 million of 5.35% Series mortgage bonds and $700 million of 5.70% Series mortgage bonds, each in March 2024;
  • the repayment, prior to maturity, of $190 million of 3.78% Series mortgage bonds in March 2025; and
  • the repayment, prior to maturity, of $110 million of 3.78% Series mortgage bonds in March 2025.

Decreases in Entergy Louisiana’s payable to the money pool are a use of cash flow, and Entergy Louisiana’s payable to the money pool decreased $156.2 million for the six months ended June 30, 2024.

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Capital Structure

Entergy Louisiana’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio for Entergy Louisiana is primarily due to the net issuance of long-term debt in 2025.

Line itemJune 30,2025December 31, 2024
Debt to capital47.2%46.0%
Effect of subtracting cash(0.7%)(0.8%)
Net debt to net capital (non-GAAP)46.5%45.2%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. Entergy Louisiana uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Louisiana’s financial condition. The net debt to net capital ratio is a non-GAAP measure. Entergy Louisiana also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Louisiana’s financial condition because net debt indicates Entergy Louisiana’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Louisiana’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Recent announcements of changes to international trade policy and tariffs and further similar changes may impact Entergy Louisiana’s business, operations, results of operations, and liquidity and capital resources. Potential impacts may include increases in costs associated with Entergy Louisiana’s capital investments or operation and maintenance expenses; operational impacts, such as supply chain, manufacturing, or raw materials sourcing disruptions which may affect Entergy Louisiana’s ability to make planned capital investments as and when expected and needed; legal uncertainties, such as potential legal or other challenges to presidential tariff authority; or broader economic risks, including shifting customer demand, impacts on customer investment decisions, and volatile or uncertain credit and capital markets, which may affect Entergy Louisiana’s ability to access needed capital. The nature and extent of any such effects will depend on, among other things, the specifics of the changes that are ultimately implemented both domestically and internationally, the responses of vendors, suppliers, and other counterparties to those changes, indirect effects on the price and availability of non-tariffed goods, and the effectiveness of mitigation measures.

Entergy Louisiana’s receivables from or (payables to) the money pool were as follows:

In Thousands

View SEC source
June 30, 2025December 31, 2024June 30, 2024December 31, 2023
$81,208$32,668$31,361($156,166)

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

Entergy Louisiana has a credit facility in the amount of $400 million scheduled to expire in June 2030. The credit facility includes fronting commitments for the issuance of letters of credit against $15 million of the borrowing capacity of the facility. As of June 30, 2025, there were no cash borrowings and no letters of credit

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

outstanding under the credit facility. In addition, Entergy Louisiana is a party to two uncommitted letter of credit facilities as a means to post collateral to support its obligations to MISO. As of June 30, 2025, $74.3 million in letters of credit were outstanding under one of Entergy Louisiana’s uncommitted letter of credit facilities. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

The Entergy Louisiana nuclear fuel company variable interest entities have two separate credit facilities, each in the amount of $105 million and scheduled to expire in June 2027. As of June 30, 2025, $69.5 million in loans were outstanding under the credit facility for the Entergy Louisiana River Bend nuclear fuel company variable interest entity and $61 million in loans were outstanding under the credit facility for the Entergy Louisiana Waterford nuclear fuel company variable interest entity. See Note 4 to the financial statements herein for additional discussion of the nuclear fuel company variable interest entity credit facilities.

2021 Solar Certification and the Geaux Green Option

As discussed in the Form 10-K, in November 2021, Entergy Louisiana filed an application with the LPSC seeking certification of and approval for the addition of four new solar photovoltaic resources with a combined nameplate capacity of 475 megawatts (the 2021 Solar Portfolio) and the implementation of a new green tariff, the Geaux Green Option (Rider GGO). The 2021 Solar Portfolio consists of four resources which include (i) the Vacherie Facility, a 150 megawatt resource in St. James Parish; (ii) the Sunlight Road Facility, a 50 megawatt resource in Washington Parish; (iii) the St. Jacques Facility, a 150 megawatt resource in St. James Parish; and (iv) the Elizabeth Facility, a 125 megawatt resource in Allen Parish. The St. Jacques Facility would be acquired through a build-own-transfer agreement; the remaining resources involve power purchase agreements. The Sunlight Road Facility and the Elizabeth Facility each achieved commercial operation in 2024, and the Vacherie Facility and the St. Jacques Facility originally had estimated in service dates in 2025.

In August 2022 the parties reached a settlement certifying the 2021 Solar Portfolio and approving implementation of Rider GGO. In September 2022 the LPSC approved the settlement. Following the LPSC approval, the St. James Parish council issued a moratorium on new land use permits for solar facilities until the later of March 2023 or the completion of an environmental and economic impact study. In November 2023, St. James Parish lifted the moratorium and adopted an ordinance modifying the parish’s land use plan to establish solar as an approved land use and defining corresponding solar regulations. In March 2024 the project developer submitted a solar energy facility farm permit application to the St. James Parish planning commission to request approval for the Vacherie and St. Jacques Facilities. In June 2024 the St. James Parish council denied the application and following this denial, the project developer and one of the project’s ground lessors filed separate lawsuits seeking to overturn the council’s decision. The council’s decision was subsequently affirmed by the Louisiana 23rd Judicial District Court. Entergy Louisiana is no longer pursuing the addition of resources through an acquisition of the St. Jacques Facility or through a power purchase agreement with the Vacherie Facility.

Additional Generation and Transmission Resources

As discussed in the Form 10-K, in October 2024, Entergy Louisiana filed an application with the LPSC seeking approval of a variety of generation and transmission resources proposed in connection with establishing service to a new data center to be developed by a subsidiary of Meta Platforms, Inc. in north Louisiana, for which an electric service agreement has been executed. The filing requests LPSC certification of three new combined cycle combustion turbine generation resources totaling 2,262 MW, each of which will be enabled for future carbon capture and storage, a new 500 kV transmission line, and 500 kV substation upgrades. The application also requests approval to implement a corporate sustainability rider applicable to the new customer. The corporate sustainability rider contemplates the new customer contributing to the costs of the future addition of 1,500 MW of new solar and energy storage resources, agreements involving carbon capture and storage at Entergy Louisiana’s existing Lake Charles Power Station, and potential future wind and nuclear resources. Entergy Louisiana anticipates funding the incremental cost to serve the customer through direct financial contributions from the customer and the revenues it expects to earn under the electric service agreement. The electric service agreement also contains provisions for

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

termination payments that will help ensure that there is no harm to Entergy Louisiana and its customers in the event of early termination. A directive was issued at the LPSC’s November 2024 meeting for the matter to be decided by October 2025. In February 2025 intervenors filed a motion asking the LPSC to deny Entergy Louisiana’s requested exemption from the LPSC’s order addressing competitive solicitation procedures and further asking the LPSC to dismiss the application. The ALJ issued an order denying the motion to dismiss the application and deferring the LPSC’s consideration of the motion regarding the competitive solicitation procedures until the hearing. In March 2025 the same intervenors filed a motion requesting the LPSC to require the customer and its parent company to be joined as parties to the proceeding or dismiss the application. In April 2025 the ALJ issued an order denying the March 2025 motion, and the moving parties filed a motion asking the LPSC to review and reverse the ALJ’s decision.

In February 2025, Entergy Louisiana filed supplemental testimony with the LPSC stating that the third combined cycle combustion turbine resource presented in the October 2024 application would be sited at Entergy Louisiana’s Waterford site in Killona, Louisiana, alongside existing Entergy Louisiana generation resources. The testimony also notes that Entergy Louisiana is negotiating with the customer in response to the customer’s request to increase the load associated with its project in north Louisiana. The testimony indicates further that the additional load can be served without additional generation capacity beyond what was presented in the October 2024 application, but that additional transmission facilities, which will be funded directly by the customer, are needed to serve this additional load.

In April 2025 and May 2025 the LPSC staff and certain intervenors each filed their direct testimony and cross-answering testimony, respectively. The LPSC staff’s testimony discussed the significant projected benefits associated with the data center project; however, both the LPSC staff and such intervenors also identified purported risks associated with constructing the requested resources based on the terms and conditions under which the customer would be taking service. Both the LPSC staff and such intervenors also recommended that the LPSC impose certain conditions on its approval which, if adopted, would support approval of Entergy Louisiana’s application. The LPSC staff’s recommendations included a condition that would require, under specified circumstances, certain sharing of net revenues from service to the project with Entergy Louisiana’s other customers. The LPSC staff also recommended that the LPSC deny approval of the corporate sustainability rider terms providing for the customer to supply funding toward the cost of installing carbon capture and storage infrastructure at Entergy Louisiana’s Lake Charles Power Station. The Louisiana Energy Users Group and other intervenors recommended that the LPSC require various changes to the terms of the electric service agreement with the customer that would shift additional risk and cost to the customer rather than Entergy Louisiana’s broader customer base. Certain intervenors also challenged approval on the basis that Entergy Louisiana did not conduct a request for proposals to procure the proposed generation resources to serve the customer’s project; these intervenors also advocated that Entergy Louisiana be required to procure more renewable generation and evaluate transmission alternatives rather than proceeding with development of all of the proposed new generation resources. In May 2025, Entergy Louisiana filed its rebuttal testimony responding to the direct and cross-answering testimony of the LPSC staff and intervenors. The rebuttal testimony expressed support for or no opposition to the LPSC’s adoption of certain of the proposed recommendations and identified why other proposed recommendations should not be adopted. In addition, the rebuttal testimony stated that the negotiations related to the increase in the load amount for the customer’s project had concluded and that a rider to the electric service agreement reflecting this increase had been executed. In advance of the July 2025 hearing, Entergy Louisiana reached a settlement agreement with the LPSC staff and three separate intervenors. The hearing concluded and the matter is currently under consideration by the ALJ.

Transmission Projects

As discussed in the Form 10-K, in March 2024, Entergy Louisiana filed an application with the LPSC seeking an exemption determination, or alternatively, a certificate of public convenience and necessity, for a transmission project that includes a new 500 kV/230 kV Commodore substation and an approximately 60-mile 230 kV line connecting the new Commodore substation to the Waterford substation. In February 2025, Entergy

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Louisiana and the LPSC staff jointly filed, for consideration by the LPSC, an uncontested stipulated settlement agreement resolving all issues in the proceeding. The LPSC approved the uncontested stipulated settlement agreement in March 2025 and thereby granted certification of the project.

As discussed in the Form 10-K, in December 2024, Entergy Louisiana filed an application with the LPSC seeking a certificate of public convenience and necessity for a 500 kV transmission project that includes the construction of a new 84-mile Commodore to Churchill 500 kV transmission line, the expansion of the Waterford 500 kV substation, the construction of a new Churchill 500 kV substation and improvements to the Churchill 230 kV substation, and the conversion of the existing 230 kV Waterford to Churchill transmission line to 500 kV, forming a 500 kV loop into the Downstream of Gypsy load pocket. In April 2025 the LPSC staff and the Louisiana Energy Users Group, an intervenor, filed direct testimony. The LPSC staff’s testimony recommends LPSC approval of the project. The Louisiana Energy Users Group’s testimony opines that Entergy Louisiana has shown that there is a need for additional transmission investment in the West Bank area of Amite South but recommends that the LPSC withhold approval pending further analysis, including analysis of potential lower cost alternatives to the proposed project, and also pending Entergy Louisiana demonstrating that it has contributions in aid of construction or minimum bill revenues from the customers whose block load additions would be enabled by the proposed transmission project in amounts sufficient to substantially, if not fully, cover the revenue requirement of the proposed project. In June 2025, Entergy Louisiana filed rebuttal testimony. The hearing is set for August 2025, and an LPSC decision is expected in fourth quarter 2025.

State and Local Rate Regulation and Fuel-Cost Recovery

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – State and Local Rate Regulation and Fuel Cost Recovery” in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery. The following are updates to that discussion.

Retail Rates

2023 Formula Rate Plan Filing

As discussed in the Form 10-K, in August 2024, pursuant to the global stipulated settlement agreement approved by the LPSC also in August 2024, Entergy Louisiana filed its formula rate plan evaluation report for its 2023 calendar year operations. Consistent with the global stipulated settlement agreement, the filing reflected a 9.7% allowed return on common equity with a bandwidth of 40 basis points above and below the midpoint. For the 2023 test year, however, the bandwidth provisions of the formula rate plan were temporarily suspended and, pursuant to the terms of the global stipulated settlement agreement, Entergy Louisiana implemented the September 2024 formula rate plan rate adjustments effective with the first billing cycle of September 2024. In January 2025, Entergy Louisiana and the LPSC filed a joint report indicating that no disputed issues remained in the proceeding and requesting that the LPSC issue an order accepting Entergy Louisiana’s evaluation report and, ultimately, resolving this matter. In March 2025 the LPSC issued an order accepting the evaluation report.

In December 2024, pursuant to the terms of the global stipulated settlement agreement, Entergy Louisiana filed an interim rate adjustment for the 2023 test year reflecting the return of $25.1 million of refunds from the System Energy settlement with the LPSC to customers from January through August 2025. In February 2025, pursuant to the terms of the global stipulated settlement agreement, Entergy Louisiana filed a second interim rate adjustment for the 2023 test year reflecting the divestiture of Entergy Louisiana’s share of Grand Gulf capacity and energy, which was effective as of January 1, 2025. The second interim rate adjustment also reflected a revenue increase of $17.8 million for the recovery of Hurricane Francine costs as approved by the LPSC (on an interim basis). The second interim rate adjustment was implemented with the first billing cycle of March 2025. See further discussion of the Hurricane Francine proceeding in Note 2 to the financial statements herein. See Note 8 to the financial statements in the Form 10-K for discussion of Entergy Louisiana’s divestiture from the Unit Power Sales Agreement.

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

2024 Formula Rate Plan Filing

In May 2025, Entergy Louisiana filed its formula rate plan evaluation report for its 2024 calendar year operations. Consistent with the global stipulated settlement agreement approved by the LPSC in August 2024, the filing reflected a 9.7% allowed return on common equity with a bandwidth of 40 basis points above and below the midpoint. For the test year 2024, however, any earnings above the allowed return on common equity are to be returned to customers through a credit, pursuant to the terms of the global stipulated settlement agreement. The 2024 test year evaluation produced an earned return on common equity of 9.98%, which is within the approved formula rate plan bandwidth, but above the allowed return on common equity, resulting in a customer credit of $31.9 million to be returned to customers during September and October 2025.

Other changes in formula rate plan revenue are driven by higher nuclear depreciation rates, additions to transmission and distribution plant in service reflected through the transmission recovery mechanism and distribution recovery mechanism, and the expiration of customer credits related to the LPSC’s order, offset by increased customer credits resulting from an increase in net MISO revenues reflected through the MISO cost recovery mechanism and the reduction in the Louisiana corporate income tax rate effective January 1, 2025, reflected through the tax adjustment mechanism, as discussed below. Excluding the customer credit for earnings above the authorized return on common equity discussed above, the net result of these changes on an annualized basis is a $2 million increase in formula rate plan revenue.

As noted above, the 2024 evaluation report included the effects of the change in Louisiana state tax law that reduced the corporate income tax rate to a flat 5.5% (from the then-current highest marginal rate of 7.5%) effective January 1, 2025. As such, the 2024 evaluation report reflected the calculation of current and deferred income tax expenses as well as the revaluation of accumulated deferred income taxes based on the income tax laws currently in effect. The 2024 evaluation report proposes that the rate effects associated with the revaluation of accumulated deferred income taxes, including the collection of any net accumulated deferred income tax deficiency and any related effects on rate base, should be reflected in the tax adjustment mechanism consistent with the treatment of similar Tax Cuts and Jobs Act and prior state tax change-related impacts. The effects of the change in tax law on Entergy Louisiana’s authorized return on rate base are also reflected in the 2024 evaluation report consistent with the treatment cited above, including a credit in the extraordinary cost change mechanism for the prospective change in Entergy Louisiana’s authorized return and a credit within the tax adjustment mechanism for over-collection of income tax expense through August 2025.

Fuel and purchased power cost recovery

As discussed in the Form 10-K, in January 2023 the LPSC staff provided notice of an audit of Entergy Louisiana’s purchased gas adjustment clause filings. The audit includes a review of the reasonableness of charges flowed through Entergy Louisiana’s purchased gas adjustment clause for the period from 2021 through 2022. In April 2025 the LPSC staff issued its audit report (for Entergy Louisiana’s gas operations), which included several prospective recommendations but no financial disallowances. The LPSC accepted the report in June 2025.

COVID-19 Orders

As discussed in the Form 10-K, in April 2020 the LPSC issued an order authorizing utilities to record as a regulatory asset expenses incurred from the suspension of disconnections and collection of late fees imposed by LPSC orders associated with the COVID-19 pandemic. In April 2023, Entergy Louisiana filed an application proposing to utilize approximately $1.6 billion in certain low interest debt to generate earnings to apply toward the reduction of the COVID-19 regulatory asset, as well as to conduct additional outside right-of-way vegetation management activities and fund the minor storm reserve account. In that filing, Entergy Louisiana proposed to delay repayment of certain shorter-term first mortgage bonds that were issued to finance storm restoration costs until the costs could be securitized, and to invest the funds that otherwise would be used to repay those bonds in the

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

money pool to take advantage of the spread between prevailing interest rates on investments in the money pool and the interest rates on the bonds. The LPSC approved Entergy Louisiana’s requested relief in June 2023. In November 2024, Entergy Louisiana submitted a filing to the LPSC requesting that the LPSC review Entergy Louisiana’s computation of the COVID-19 regulatory asset as well as Entergy Louisiana’s proposal to offset the regulatory asset against the net interest earned on the short-term debt funds, resulting in no increased costs to customers. At the time of the filing, Entergy Louisiana had a regulatory asset of $47.8 million for costs associated with the COVID-19 pandemic. As of June 30, 2025, Entergy Louisiana had a regulatory liability of $48.9 million for the deferred earnings related to the approximately $1.6 billion in low interest debt, which had been fully repaid by August 2024. In granting Entergy Louisiana’s requested relief in June 2023, the LPSC ordered that any amount of earnings exceeding the amount of the COVID-19 regulatory asset be transferred to Entergy Louisiana’s storm reserve escrow account. In May 2025 the LPSC staff filed direct testimony finding that Entergy Louisiana had complied with the relevant orders and recommending approval of the requested treatment. In June 2025, Entergy Louisiana and the LPSC staff filed a joint motion requesting a hearing for the admission of an uncontested stipulated settlement agreement in the matter. A settlement hearing took place in July 2025 and Entergy Louisiana expects the settlement to be considered at an upcoming meeting of the LPSC. The settlement terms provide for LPSC approval of Entergy Louisiana’s calculation of the COVID-19 regulatory assets and Entergy Louisiana’s proposal to offset the regulatory asset as described above and as proposed in Entergy Louisiana’s November 2024 filing.

Storm Cost Recovery

In March 2025, Entergy Louisiana filed an application asking that the LPSC issue an order establishing a presumption, in future proceedings involving Entergy Louisiana’s petition for a financing order allowing securitization of storm costs, that the LPSC will enter a decision on the request for a financing order within 120 days from the date of the filing of the petition, while preserving the LPSC’s jurisdiction to complete its full prudence review. The filing was rejected on procedural grounds. In June 2025 the LPSC approved a directive providing, among other things, that any utility seeking securitization for storm costs this year must file a proposed financing order with its application and that the LPSC staff must use best efforts to deliver the financing order to the LPSC for consideration at the next available Business and Executive meeting after the application is filed.

Industrial and Commercial Customers

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Industrial and Commercial Customers” in the Form 10-K for a discussion of industrial and commercial customers.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation” in the Form 10-K for a discussion of federal regulation.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Nuclear Matters” in the Form 10-K for a discussion of nuclear matters. The following is an update to that discussion.

NRC Reactor Oversight Process

The NRC’s Reactor Oversight Process is a program to collect information about plant performance, assess the information for its safety significance, and provide for appropriate licensee and NRC response. The NRC evaluates plant performance by analyzing two distinct inputs: inspection findings resulting from the NRC’s inspection program and performance indicators reported by the licensee. The evaluations result in the placement of each plant in one of the NRC’s Reactor Oversight Process Action Matrix columns: “licensee response column,” or

Entergy Louisiana, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Column 1, “regulatory response column,” or Column 2, “degraded cornerstone column,” or Column 3, “multiple/repetitive degraded cornerstone column,” or Column 4, and “unacceptable performance,” or Column 5. Plants in Column 1 are subject to normal NRC inspection activities. Plants in Column 2, Column 3, or Column 4 are subject to progressively increasing levels of inspection by the NRC with, in general, progressively increasing levels of associated costs. Continued plant operation is not permitted for plants in Column 5. River Bend is currently in Column 1, and Waterford 3 is currently in Column 2.

In June 2025 the NRC placed Waterford 3 in Column 2, effective second quarter 2025, based on the failure to properly develop and implement adequate maintenance instructions for the fuel linkage connection to the mechanical governor for an emergency diesel generator. Waterford 3 will remain in Column 2 until a supplemental inspection is satisfactorily completed.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Louisiana’s accounting for nuclear decommissioning costs, utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

  • (Unaudited)
  • (In Thousands)
  • (In Thousands)_

CONSOLIDATED INCOME STATEMENTS

For the Three and Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands · In Thousands

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
OPERATING REVENUES
Electric$1,495,504$1,261,444$2,767,450$2,434,237
Natural gas14,55914,68044,16044,327
TOTAL1,510,0631,276,1242,811,6102,478,564
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale326,256246,571540,108486,658
Purchased power297,179166,868558,967367,148
Nuclear refueling outage expenses14,80920,04133,18037,554
Other operation and maintenance275,187275,168533,224536,147
Decommissioning19,60820,06139,02539,725
Taxes other than income taxes68,01070,629134,231140,468
Depreciation and amortization201,842190,861399,464380,405
Other regulatory charges (credits) - net(61,915)120,298(109,148)111,944
TOTAL1,140,9761,110,4972,129,0512,100,049
OPERATING INCOME369,087165,627682,559378,515
OTHER INCOME
Allowance for equity funds used during construction18,4707,52233,67614,807
Interest and investment income53,59915,22954,68778,192
Interest and investment income - affiliated75,19580,075151,766160,479
Miscellaneous - net(33,797)(20,646)(16,726)(67,821)
TOTAL113,46782,180223,403185,657
INTEREST EXPENSE
Interest expense116,52498,536237,858195,731
Allowance for borrowed funds used during construction(6,691)(2,593)(12,876)(5,070)
TOTAL109,83395,943224,982190,661
INCOME BEFORE INCOME TAXES372,721151,864680,980373,511
Income taxes72,54120,750126,60359,674
NET INCOME300,180131,114554,377313,837
Net income attributable to noncontrolling interests7457881,4971,583
EARNINGS APPLICABLE TO MEMBER'S EQUITY$299,435$130,326$552,880$312,254
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)
  • (In Thousands)_

CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME

For the Three and Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands · In Thousands

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
Net Income$300,180$131,114$554,377$313,837
Other comprehensive loss
Pension and other postretirement adjustment (net of tax benefit of $723, $745, $2,607, and $1,491)(2,132)(2,023)(3,103)(4,047)
Other comprehensive loss(2,132)(2,023)(3,103)(4,047)
Comprehensive Income298,048129,091551,274309,790
Net income attributable to noncontrolling interests7457881,4971,583
Comprehensive Income Applicable to Member’s Equity$297,303$128,303$549,777$308,207
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED STATEMENTS OF CASH FLOWS

For the Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
OPERATING ACTIVITIES
Net income$554,377$313,837
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization474,334453,888
Deferred income taxes, investment tax credits, and non-current taxes accrued225,635146,540
Changes in working capital:
Receivables(122,848)(161,001)
Fuel inventory8,3006,890
Accounts payable9,253(1,443)
Taxes accrued(790)27,677
Interest accrued10,43014,163
Deferred fuel costs(92,390)11,364
Other working capital accounts77,581(190,407)
Changes in provisions for estimated losses(23,918)9,519
Changes in other regulatory assets48,355(9,005)
Changes in other regulatory liabilities(70,161)286,036
Changes in pension and other postretirement funded status(18,124)(22,548)
Other(101,335)(77,112)
Net cash flow provided by operating activities978,699808,398
INVESTING ACTIVITIES
Construction expenditures(1,450,693)(685,206)
Allowance for equity funds used during construction26,56014,807
Proceeds from sale of assets366
Nuclear fuel purchases(130,279)(52,992)
Proceeds from sale of nuclear fuel17,24038,822
Payments to storm reserve escrow account(5,144)(6,553)
Receipt from storm reserve escrow account33,456
Redemption of preferred membership interests of affiliate118,805113,942
Proceeds from nuclear decommissioning trust fund sales291,901333,149
Investment in nuclear decommissioning trust funds(321,342)(363,736)
Changes in money pool receivable - net(48,540)(31,361)
Decrease in other investments33
Net cash flow used in investing activities(1,467,670)(639,095)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt1,465,7471,825,954
Retirement of long-term debt(936,318)(1,061,918)
Change in money pool payable - net(156,166)
Customer advances received for construction548,476113,712
Customer advances used for construction(117,339)(39,888)
Common equity distributions paid(495,000)(664,100)
Other(4,247)(3,888)
Net cash flow provided by financing activities461,31913,706
Net increase (decrease) in cash and cash equivalents(27,652)183,009
Cash and cash equivalents at beginning of period327,1022,772
Cash and cash equivalents at end of period$299,450$185,781
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid during the period for:
Interest - net of amount capitalized$222,889$177,455
Income taxes$—$58
Noncash investing activities:
Accrued construction expenditures$258,408$81,177
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED BALANCE SHEETS · ASSETS

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT ASSETS
Cash and cash equivalents:
Cash$1,186$327
Temporary cash investments298,264326,775
Total cash and cash equivalents299,450327,102
Accounts receivable:
Customer369,748294,089
Allowance for doubtful accounts(6,246)(3,036)
Associated companies163,851103,055
Other67,70539,056
Accrued unbilled revenues222,520213,026
Total accounts receivable817,578646,190
Deferred fuel costs84,372
Fuel inventory - at average cost41,62249,515
Materials and supplies718,589782,459
Deferred nuclear refueling outage costs63,82131,121
Current assets held for sale4,8452,474
Prepayments and other273,29884,236
TOTAL2,303,5751,923,097
OTHER PROPERTY AND INVESTMENTS
Investment in affiliate preferred membership interests4,138,1914,256,997
Decommissioning trust funds2,540,4762,429,088
Non-utility property - at cost (less accumulated depreciation)455,274410,611
Storm reserve escrow account228,406256,718
Other9,9699,749
TOTAL7,372,3167,363,163
UTILITY PLANT
Electric29,556,06028,736,547
Natural gas34,46033,775
Construction work in progress1,350,603761,090
Nuclear fuel339,822288,084
TOTAL UTILITY PLANT31,280,94529,819,496
Less - accumulated depreciation and amortization11,019,30710,794,817
UTILITY PLANT - NET20,261,63819,024,679
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets1,591,6211,637,967
Deferred fuel costs168,122168,122
Non-current assets held for sale178,746173,669
Other76,62457,853
TOTAL2,015,1132,037,611
TOTAL ASSETS$31,952,642$30,348,550
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED BALANCE SHEETS · LIABILITIES AND EQUITY

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT LIABILITIES
Currently maturing long-term debt$250,000$300,000
Accounts payable:
Associated companies83,160108,688
Other688,784533,087
Customer deposits173,957169,544
Taxes accrued28,22529,002
Interest accrued130,616120,186
Deferred fuel costs5,421
Customer advances352,052151,662
Other119,51096,426
TOTAL1,826,3041,514,016
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued2,726,8232,477,954
Accumulated deferred investment tax credits86,42888,679
Regulatory liability for income taxes - net339,104355,432
Other regulatory liabilities1,640,7711,692,547
Decommissioning1,884,7451,842,855
Accumulated provisions255,705279,623
Pension and other postretirement liabilities149,085160,577
Long-term debt10,149,8239,566,453
Customer advances for construction722,979291,842
Other516,438479,178
TOTAL18,471,90117,235,140
Commitments and Contingencies
EQUITY
Member’s equity11,560,88611,503,030
Accumulated other comprehensive income50,55553,658
Noncontrolling interests42,99642,706
TOTAL11,654,43711,599,394
TOTAL LIABILITIES AND EQUITY$31,952,642$30,348,550
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY

For the Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands

View SEC source
Line itemNoncontrolling InterestsMember’s EquityAccumulated Other Comprehensive IncomeTotal
Balance at December 31, 2023$45,107$11,473,614$54,798$11,573,519
Net income795181,928182,723
Other comprehensive loss(2,024)(2,024)
Non-cash contribution from parent976976
Common equity distributions(97,500)(97,500)
Distributions to LURC(858)(858)
Other(43)(43)
Balance at March 31, 202445,04411,558,97552,77411,656,793
Net income788130,326131,114
Other comprehensive loss(2,023)(2,023)
Common equity distributions(566,600)(566,600)
Distributions to LURC(299)(299)
Other(40)(40)
Balance at June 30, 2024$45,533$11,122,661$50,751$11,218,945
Balance at December 31, 2024$42,706$11,503,030$53,658$11,599,394
Net income752253,445254,197
Other comprehensive loss(971)(971)
Common equity distributions(36,250)(36,250)
Distributions to LURC(888)(888)
Other(12)(12)
Balance at March 31, 202542,57011,720,21352,68711,815,470
Net income745299,435300,180
Other comprehensive loss(2,132)(2,132)
Common equity distributions(458,750)(458,750)
Distributions to LURC(319)(319)
Other(12)(12)
Balance at June 30, 2025$42,996$11,560,886$50,555$11,654,437
See Notes to Financial Statements.

ENTERGY MISSISSIPPI, LLC AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

Second Quarter 2025 Compared to Second Quarter 2024

Net income increased $4.7 million primarily due to higher retail electric price and higher other income, partially offset by higher other operation and maintenance expenses and higher interest expense.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Net income increased $24.1 million primarily due to higher retail electric price, higher other income, and higher volume/weather. The increase was partially offset by higher other operation and maintenance expenses, a regulatory charge, recorded in the first quarter 2025, to reflect an adjustment to the grid modernization over/under recovery deferral balance, and higher interest expense.

Operating Revenues

Second Quarter 2025 Compared to Second Quarter 2024

Following is an analysis of the change in operating revenues comparing the second quarter 2025 to the second quarter 2024:

In Millions

View SEC source
Line itemAmount
2024 operating revenues$442.9
Fuel, rider, and other revenues that do not significantly affect net income35.2
Retail electric price14.1
Volume/weather(0.3)
2025 operating revenues$491.9

Entergy Mississippi’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to an increase in formula rate plan rates effective July 2024 and an increase in the interim facilities rate adjustment revenues effective January 2025. See Note 2 to the financial statements in the Form 10-K for discussion of the 2024 formula rate plan filing, and see Note 2 to the financial statements herein for discussion of the interim facilities rate adjustment.

The volume/weather variance for second quarter 2025 as compared to second quarter 2024 is insignificant.

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Total electric energy sales for Entergy Mississippi for the three months ended June 30, 2025 and 2024 are as follows:

Line item20252024% Change
(GWh)
Residential1,3081,397(6)
Commercial1,1721,172
Industrial6465968
Governmental101101
Total retail3,2273,266(1)
Sales for resale:
Non-associated companies1,72597078
Total4,9524,23617

See Note 12 to the financial statements herein for additional discussion of Entergy Mississippi’s operating revenues.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Following is an analysis of the change in operating revenues comparing the six months ended June 30, 2025 to the six months ended June 30, 2024:

In Millions

View SEC source
Line itemAmount
2024 operating revenues$857.8
Fuel, rider, and other revenues that do not significantly affect net income0.7
Retail electric price38.3
Volume/weather18.8
2025 operating revenues$915.6

Entergy Mississippi’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to increases in formula rate plan rates effective April 2024 and July 2024 and an increase in the interim facilities rate adjustment revenues effective January 2025. See Note 2 to the financial statements in the Form 10-K for discussion of the 2024 formula rate plan filing, and see Note 2 to the financial statements herein for discussion of the interim facilities rate adjustment.

The volume/weather variance is primarily due to an increase in industrial usage and the effect of more favorable weather on residential sales. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the technology and primary metals industries, and an increase in demand from small industrial customers.

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Total electric energy sales for Entergy Mississippi for the six months ended June 30, 2025 and 2024 are as follows:

Line item20252024% Change
(GWh)
Residential2,6192,5841
Commercial2,1742,1352
Industrial1,1721,0908
Governmental1891881
Total retail6,1545,9973
Sales for resale:
Non-associated companies2,4192,958(18)
Total8,5738,955(4)

See Note 12 to the financial statements herein for additional discussion of Entergy Mississippi’s operating revenues.

Other Income Statement Variances

Second Quarter 2025 Compared to Second Quarter 2024

Other operation and maintenance expenses increased primarily due to an increase of $8.2 million in power delivery expenses primarily due to higher vegetation maintenance costs and an increase of $5.7 million in storm damage provisions. See Note 2 to the financial statements in the Form 10-K for discussion of the storm damage mitigation and restoration rider.

Taxes other than income taxes increased primarily due to increases in ad valorem taxes resulting from higher assessments.

Other regulatory charges (credits) - net includes regulatory credits of $7.3 million, recorded in second quarter 2024, to reflect the effects of the joint stipulation reached in the 2024 formula rate plan filing proceeding. See Note 2 to the financial statements in the Form 10-K for discussion of the 2024 formula rate plan filing.

Other income increased primarily due to an increase of $4.4 million in interest earned on money pool investments and an increase in the allowance for equity funds used during construction due to higher construction in progress in 2025.

Interest expense increased primarily due to the issuance of $600 million of 5.80% Series mortgage bonds in March 2025.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Other operation and maintenance expenses increased primarily due to an increase of $11.7 million in power delivery expenses primarily due to higher vegetation maintenance costs and an increase of $9.8 million in storm damage provisions. See Note 2 to the financial statements in the Form 10-K for discussion of the storm damage mitigation and restoration rider.

Taxes other than income taxes increased primarily due to increases in ad valorem taxes resulting from higher assessments.

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Other regulatory charges (credits) – net includes:

  • a regulatory charge of $21 million, recorded in first quarter 2025, to reflect an adjustment to the grid modernization over/under recovery deferral balance; and
  • regulatory credits of $7.3 million, recorded in second quarter 2024, to reflect the effects of the joint stipulation reached in the 2024 formula rate plan filing proceeding. See Note 2 to the financial statements in the Form 10-K for discussion of the 2024 formula rate plan filing.

Other income increased primarily due to an increase of $7.6 million in the amortization of tax gross ups on customer advances for construction, an increase of $6.3 million in interest earned on money pool investments, and an increase in the allowance for equity funds used during construction due to higher construction in progress in 2025.

Interest expense increased primarily due to the issuance of $600 million of 5.80% Series mortgage bonds in March 2025, the issuance of $300 million of 5.85% Series mortgage bonds in May 2024, and carrying costs of $9 million in 2025 on customer advances for construction.

Income Taxes

The effective income tax rates were 23.7% for the second quarter 2025 and 23.8% for the six months ended June 30, 2025. The differences in the effective income tax rates for the second quarter 2025 and the six months ended June 30, 2025 versus the federal statutory rate of 21% were primarily due to the accrual for state income taxes, partially offset by certain book and tax differences related to utility plant items.

The effective income tax rates were 24.1% for the second quarter 2024 and 23.6% for the six months ended June 30, 2024. The differences in the effective income tax rates for the second quarter 2024 and the six months ended June 30, 2024 versus the federal statutory rate of 21% were primarily due to the accrual for state income taxes, partially offset by certain book and tax differences related to utility plant items.

Income Tax Legislation and Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Income Tax Legislation and Regulation” herein and in the Form 10-K for discussion of income tax legislation and regulation.

Liquidity and Capital Resources

Cash Flow

Cash flows for the six months ended June 30, 2025 and 2024 were as follows:

In Thousands

View SEC source
Line item20252024
Cash and cash equivalents at beginning of period$155,693$6,630
Net cash provided by (used in):
Operating activities287,013185,304
Investing activities(791,448)(314,145)
Financing activities750,108125,324
Net increase (decrease) in cash and cash equivalents245,673(3,517)
Cash and cash equivalents at end of period$401,366$3,113

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Operating Activities

Net cash flow provided by operating activities increased $101.7 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to the receipt of $108.4 million in advance payments related to customer agreements in 2025, which are recorded as current liabilities and included within changes in other working capital accounts, and higher collections from customers, including $25 million of deferred revenue in 2025. The increase was partially offset by the timing of payments to vendors and higher fuel and purchased power payments. See Note 2 to the financial statements in the Form 10-K for a discussion of fuel and purchased power cost recovery.

Investing Activities

Net cash flow used in investing activities increased $477.3 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to:

  • an increase of $394.8 million in non-nuclear generation construction expenditures primarily due to higher spending on the Delta Blues Advanced Power Station project, the Penton Solar project, the Delta Solar project, and other non-nuclear generation projects;
  • money pool activity; and
  • an increase of $29.1 million in distribution construction expenditures primarily due to increased investment in the resilience of the distribution system.

The increase was partially offset by a decrease of $21.2 million in transmission construction expenditures primarily due to decreased spending on various transmission projects in 2025 and a decrease of $16.3 million in information technology capital expenditures primarily due to decreased spending on technology upgrade projects in 2025.

Increases in Entergy Mississippi’s receivable from the money pool are a use of cash flow, and Entergy Mississippi’s receivable from the money pool increased $93.5 million for the six months ended June 30, 2025. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and other borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings.

Financing Activities

Net cash flow provided by financing activities increased $624.8 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to:

  • the issuance of $600 million of 5.80% Series mortgage bonds in March 2025;
  • an increase of $110.1 million in net customer advances for construction related to transmission, distribution, and generator interconnection agreements;
  • the repayment, prior to maturity, of $100 million of 3.75% Series mortgage bonds in June 2024;
  • a capital contribution of $62.5 million received from Entergy Corporation in February 2025 in order to maintain Entergy Mississippi’s capital structure;
  • money pool activity; and
  • $22.3 million in common equity distributions paid in 2024 in order to maintain Entergy Mississippi’s capital structure.

The increase was partially offset by the issuance of $300 million of 5.85% Series mortgage bonds in May 2024.

Decreases in Entergy Mississippi’s payable to the money pool are a use of cash flow, and Entergy Mississippi’s payable to the money pool decreased by $33.4 million for the six months ended June 30, 2024.

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Capital Structure

Entergy Mississippi’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio for Entergy Mississippi is primarily due to net issuance of long-term debt in 2025.

Line itemJune 30, 2025December 31, 2024
Debt to capital53.9%50.4%
Effect of subtracting cash(3.5%)(1.6%)
Net debt to net capital (non-GAAP)50.4%48.8%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, and long-term debt, including the currently maturing portion. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. Entergy Mississippi uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Mississippi’s financial condition. The net debt to net capital ratio is a non-GAAP measure. Entergy Mississippi uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Mississippi’s financial condition because net debt indicates Entergy Mississippi’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Mississippi’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Recent announcements of changes to international trade policy and tariffs and further similar changes may impact Entergy Mississippi’s business, operations, results of operations, and liquidity and capital resources. Potential impacts may include increases in costs associated with Entergy Mississippi’s capital investments or operation and maintenance expenses; operational impacts, such as supply chain, manufacturing, or raw materials sourcing disruptions which may affect Entergy Mississippi’s ability to make planned capital investments as and when expected and needed; legal uncertainties, such as potential legal or other challenges to presidential tariff authority; or broader economic risks, including shifting customer demand, impacts on customer investment decisions, and volatile or uncertain credit and capital markets, which may affect Entergy Mississippi’s ability to access needed capital. The nature and extent of any such effects will depend on, among other things, the specifics of the changes that are ultimately implemented both domestically and internationally, the responses of vendors, suppliers, and other counterparties to those changes, indirect effects on the price and availability of non-tariffed goods, and the effectiveness of mitigation measures.

Entergy Mississippi’s receivables from or (payables to) the money pool were as follows:

In Thousands

View SEC source
June 30, 2025December 31, 2024June 30, 2024December 31, 2023
$108,677$15,218($40,355)($73,769)

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Entergy Mississippi has a credit facility in the amount of $300 million scheduled to expire in June 2030. The credit facility includes fronting commitments for the issuance of letters of credit against $5 million of the borrowing capacity of the facility. As of June 30, 2025, there were no cash borrowings and no letters of credit outstanding under the credit facility. In addition, Entergy Mississippi is a party to two uncommitted letter of credit facilities as a means to post collateral to support its obligations to MISO and for other purposes. As of June 30, 2025, $46.0 million in MISO letters of credit and $1.3 million in non-MISO letters of credit were outstanding under one of Entergy Mississippi’s uncommitted letter of credit facilities. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

New Advanced Power Station

Entergy Mississippi plans to construct, own, and operate a 754 MW combined cycle combustion turbine facility to be located in the City of Ridgeland, Madison County, Mississippi. The facility will be powered primarily by natural gas, and it will also be enabled for future carbon capture and storage and for hydrogen co-firing optionality. The project is expected to cost in excess of $1 billion. The facility is expected to be in service in 2029.

State and Local Rate Regulation and Fuel-Cost Recovery

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - State and Local Rate Regulation and Fuel-Cost Recovery” in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery. The following are updates to that discussion.

Retail Rates

2025 Formula Rate Plan Filing

In February 2025, Entergy Mississippi submitted its formula rate plan 2025 test year filing and 2024 look-back filing showing Entergy Mississippi’s earned return on rate base for the historical 2024 calendar year to be within the formula rate plan bandwidth and projected earned return for the 2025 calendar year also to be within the formula rate plan bandwidth. The 2025 test year filing showed an earned return on rate base of 7.64% and reflected no change in formula rate plan revenues. The 2024 look-back filing compared actual 2024 results to the approved benchmark return on rate base and reflected no change in formula rate plan revenues, although Entergy Mississippi proposed to adjust interim rates by $135 thousand to reflect two outside-the-bandwidth changes: (1) the completion of Entergy Mississippi’s return to customers of credits under its restructuring credit rider; and (2) a true-up of demand side management costs.

In June 2025, Entergy Mississippi and the Mississippi Public Utilities Staff entered into a joint stipulation that confirmed the 2025 test year filing, with the exception of immaterial adjustments to certain operation and maintenance expenses. The formula rate plan reflected an earned return on rate base of 7.68% for calendar year 2025, resulting in no change in formula rate plan revenues for 2025. Pursuant to the stipulation, Entergy Mississippi’s 2024 look-back filing reflected an earned return on rate base of 7.55%, which also resulted in no change in formula rate plan revenues for 2024. In addition, the stipulation included the recovery of the two outside-the-bandwidth changes discussed above as well as the ratemaking treatment of customer contributions (deferred revenue and prepaid contributions in aid of construction). In June 2025 the MPSC approved the joint stipulation with rates effective in July 2025.

Interim Facilities Rate Adjustments

In May 2024, Entergy Mississippi received approval from the MPSC for formula rate plan revisions that were necessary for Entergy Mississippi to comply with state legislation passed in January 2024. The legislation allows Entergy Mississippi to make interim rate adjustments to recover the non-fuel related annual ownership cost of certain facilities that directly or indirectly provide service to customers who own certain data processing center

Entergy Mississippi, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

projects as specified in the legislation. Entergy Mississippi filed the first of its annual interim facilities rate adjustment reports in May 2024 to recover approximately $8.7 million of these costs over a six-month period with rates effective beginning in July 2024. Entergy Mississippi filed its second interim facilities rate adjustment report in November 2024 to recover approximately $46.7 million of these costs over a 12-month period with rates effective beginning in January 2025. In February 2025, Entergy Mississippi filed a true-up interim facilities rate adjustment report to the initial annual interim facilities rate adjustment report filed in May 2024, reflecting the recovery of an additional approximately $1.0 million of costs over a 12-month period with rates effective with the first billing cycle of April 2025.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation” in the Form 10-K for a discussion of federal regulation.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Mississippi’s accounting for utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

  • (Unaudited)
  • (In Thousands)
  • (In Thousands)_

CONSOLIDATED INCOME STATEMENTS

For the Three and Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands · In Thousands

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
OPERATING REVENUES
Electric$491,875$442,894$915,584$857,750
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale53,06163,97879,112181,827
Purchased power90,66066,848178,171134,502
Other operation and maintenance85,06667,700163,866138,906
Taxes other than income taxes43,80037,49687,31075,806
Depreciation and amortization68,47867,130136,462133,048
Other regulatory charges (credits) - net16,7679,87352,3543,382
TOTAL357,832313,025697,275667,471
OPERATING INCOME134,043129,869218,309190,279
OTHER INCOME
Allowance for equity funds used during construction5,1423,09410,4125,012
Interest and investment income6,5539488,8701,141
Miscellaneous - net(777)(1,771)3,317(3,393)
TOTAL10,9182,27122,5992,760
INTEREST EXPENSE
Interest expense36,54028,49972,72054,896
Allowance for borrowed funds used during construction(1,966)(1,204)(3,982)(1,951)
TOTAL34,57427,29568,73852,945
INCOME BEFORE INCOME TAXES110,387104,845172,170140,094
Income taxes26,11525,28041,03233,097
NET INCOME84,27279,565131,138106,997
Net loss attributable to noncontrolling interest(412)(1,733)(2,891)(4,035)
EARNINGS APPLICABLE TO MEMBER'S EQUITY$84,684$81,298$134,029$111,032
See Notes to Financial Statements.

(Page left blank intentionally)

  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED STATEMENTS OF CASH FLOWS

For the Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
OPERATING ACTIVITIES
Net income$131,138$106,997
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation and amortization136,462133,048
Deferred income taxes, investment tax credits, and non-current taxes accrued(19,714)24,931
Changes in assets and liabilities:
Receivables(41,738)(26,254)
Fuel inventory(4,855)(2,331)
Accounts payable(9,305)475
Taxes accrued(3,929)(48,627)
Interest accrued9,125(1,845)
Deferred fuel costs(64,303)41,104
Other working capital accounts85,185(18,367)
Provisions for estimated losses(3,962)(11,575)
Other regulatory assets52,1325,325
Other regulatory liabilities(1,066)(3,415)
Pension and other postretirement funded status(6,261)(8,968)
Other assets and liabilities28,104(5,194)
Net cash flow provided by operating activities287,013185,304
INVESTING ACTIVITIES
Construction expenditures(703,400)(319,053)
Allowance for equity funds used during construction5,3655,012
Change in money pool receivable - net(93,459)
Increase (decrease) in other investments46(104)
Net cash flow used in investing activities(791,448)(314,145)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt592,679396,105
Retirement of long-term debt(200,000)
Capital contribution from parent62,500
Change in money pool payable - net(33,414)
Customer advances received for construction155,5944,290
Customer advances used for construction(59,271)(18,080)
Common equity distributions paid(22,300)
Other(1,394)(1,277)
Net cash flow provided by financing activities750,108125,324
Net increase (decrease) in cash and cash equivalents245,673(3,517)
Cash and cash equivalents at beginning of period155,6936,630
Cash and cash equivalents at end of period$401,366$3,113
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid during the period for:
Interest - net of amount capitalized$62,373$55,538
Income taxes$—$2,356
Noncash investing activities:
Accrued construction expenditures$78,363$22,334
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED BALANCE SHEETS · ASSETS

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT ASSETS
Cash and cash equivalents:
Cash$30$184
Temporary cash investments401,336155,509
Total cash and cash equivalents401,366155,693
Accounts receivable:
Customer117,42197,609
Allowance for doubtful accounts(2,733)(2,172)
Associated companies123,71023,909
Other28,62225,148
Accrued unbilled revenues88,41175,740
Total accounts receivable355,431220,234
Fuel inventory - at average cost19,81814,963
Materials and supplies115,092113,256
Prepayments and other41,42219,764
TOTAL933,129523,910
OTHER PROPERTY AND INVESTMENTS
Non-utility property - at cost (less accumulated depreciation)4,4744,482
Other834880
TOTAL5,3085,362
UTILITY PLANT
Electric8,053,0377,860,409
Construction work in progress869,314487,273
TOTAL UTILITY PLANT8,922,3518,347,682
Less - accumulated depreciation and amortization2,592,5122,511,091
UTILITY PLANT - NET6,329,8395,836,591
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets473,715525,847
Other108,54397,260
TOTAL582,258623,107
TOTAL ASSETS$7,850,534$6,988,970
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED BALANCE SHEETS · LIABILITIES AND EQUITY

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT LIABILITIES
Accounts payable:
Associated companies$50,498$58,087
Other213,938283,755
Customer deposits97,04994,009
Taxes accrued175,095179,024
Interest accrued29,79220,667
Deferred fuel costs62,013126,316
Customer advances103,402
Other22,57120,720
TOTAL754,358782,578
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued857,418870,116
Accumulated deferred investment tax credits13,23413,446
Regulatory liability for income taxes - net175,747180,851
Other regulatory liabilities63,58259,544
Asset retirement cost liabilities25,81425,110
Accumulated provisions43,23847,200
Long-term debt3,020,6872,427,073
Customer advances for construction208,941112,618
Other84,88961,446
TOTAL4,493,5503,797,404
Commitments and Contingencies
EQUITY
Member's equity2,597,3152,400,786
Noncontrolling interest5,3118,202
TOTAL2,602,6262,408,988
TOTAL LIABILITIES AND EQUITY$7,850,534$6,988,970
See Notes to Financial Statements.

CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY

For the Six Months Ended June 30, 2025 and 2024 · Unaudited

View SEC source
Line itemNoncontrolling InterestMember's EquityTotal
(In Thousands)
Balance at December 31, 2023$18,753$2,189,461$2,208,214
Net income (loss)(2,302)29,73427,432
Balance at March 31, 202416,4512,219,1952,235,646
Net income (loss)(1,733)81,29879,565
Common equity distributions(22,300)(22,300)
Balance at June 30, 2024$14,718$2,278,193$2,292,911
Balance at December 31, 2024$8,202$2,400,786$2,408,988
Net income (loss)(2,479)49,34546,866
Capital contribution from parent62,50062,500
Balance at March 31, 20255,7232,512,6312,518,354
Net income (loss)(412)84,68484,272
Balance at June 30, 2025$5,311$2,597,315$2,602,626
See Notes to Financial Statements.

ENTERGY NEW ORLEANS, LLC AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

Second Quarter 2025 Compared to Second Quarter 2024

Net income decreased $3.1 million primarily due to higher other operation and maintenance expenses and higher interest expense.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Entergy New Orleans had net income of $30.1 million for the six months ended June 30, 2025 compared to a net loss of $27.8 million for the six months ended June 30, 2024 primarily due to a $78.5 million ($57.4 million net-of-tax) regulatory charge, recorded in first quarter 2024, primarily to reflect a settlement in principle between Entergy New Orleans and the City Council in April 2024 for additional sharing with customers of income tax benefits from the resolution of the 2016-2018 IRS audit. Also contributing to the net income variance were higher volume/weather, higher retail electric price, and lower other operation and maintenance expenses, partially offset by higher interest expense and higher depreciation and amortization expenses. See Note 3 to the financial statements in the Form 10-K for discussion of the April 2024 settlement in principle and discussion of the resolution of the 2016-2018 IRS audit.

Operating Revenues

Second Quarter 2025 Compared to Second Quarter 2024

Following is an analysis of the change in operating revenues comparing the second quarter 2025 to the second quarter 2024:

In Millions

View SEC source
Line itemAmount
2024 operating revenues$199.3
Fuel, rider, and other revenues that do not significantly affect net income9.8
Retail electric price1.8
Volume/weather(0.9)
2025 operating revenues$210.0

Entergy New Orleans’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to an increase in formula rate plan rates effective September 2024 in accordance with the terms of the 2024 formula rate plan filing. See Note 2 to the financial statements in the Form 10-K for discussion of the formula rate plan filing.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

The volume/weather variance is primarily due to a decrease in industrial usage and the effect of less favorable weather on residential sales, partially offset by an increase in weather-adjusted residential usage. The decrease in industrial usage is primarily due to a decrease in demand from large industrial customers, primarily in the industrial gases industry.

Total electric energy sales for Entergy New Orleans for the three months ended June 30, 2025 and 2024 are as follows:

Line item20252024% Change
(GWh)
Residential593614(3)
Commercial5345311
Industrial106115(8)
Governmental198198
Total retail1,4311,458(2)
Sales for resale:
Non-associated companies255476(46)
Total1,6861,934(13)

See Note 12 to the financial statements herein for additional discussion of Entergy New Orleans’s operating revenues.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Following is an analysis of the change in operating revenues comparing the six months ended June 30, 2025 to the six months ended June 30, 2024:

In Millions

View SEC source
Line itemAmount
2024 operating revenues$392.3
Fuel, rider, and other revenues that do not significantly affect net income(8.2)
Retail electric price3.4
Volume/weather3.6
2025 operating revenues$391.1

Entergy New Orleans’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to an increase in formula rate plan rates effective September 2024 in accordance with the terms of the 2024 formula rate plan filing. See Note 2 to the financial statements in the Form 10-K for discussion of the formula rate plan filing.

The volume/weather variance is primarily due to the effect of more favorable weather on residential sales, partially offset by a decrease in commercial and industrial usage. The decrease in industrial usage is primarily due to a decrease in demand from large industrial customers, primarily in the industrial gases industry, and a decrease in demand from small industrial customers.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Total electric energy sales for Entergy New Orleans for the six months ended June 30, 2025 and 2024 are as follows:

Line item20252024% Change
(GWh)
Residential1,1261,0943
Commercial972974
Industrial177200(12)
Governmental372375(1)
Total retail2,6472,643
Sales for resale:
Non-associated companies352981(64)
Total2,9993,624(17)

See Note 12 to the financial statements herein for additional discussion of Entergy New Orleans’s operating revenues.

Other Income Statement Variances

Second Quarter 2025 Compared to Second Quarter 2024

Other operation and maintenance expenses increased primarily due to an increase of $1.0 million in loss provisions and an increase of $1.0 million in energy efficiency expenses primarily due to higher energy efficiency costs. The increase was partially offset by contract costs of $0.8 million, in second quarter 2024, related to operational performance, customer service, and organizational health initiatives.

Depreciation and amortization expenses increased primarily due to additions to plant in service.

Other income (deductions) decreased primarily due to the deferral of certain other postretirement benefit expense credits, effective September 2024, in accordance with the terms of the 2024 formula rate plan filing. See Note 2 to the financial statements in the Form 10-K for discussion of the 2024 formula rate plan filing and Note 11 to the financial statements in the Form 10-K for discussion of the other postretirement benefits accounting treatment.

Interest expense increased primarily due to an increase of $3.3 million in carrying costs on regulatory liability balances.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Other operation and maintenance expenses decreased primarily due to $1.8 million in costs recognized in 2024 related to credits provided to customers as part of the rate mitigation plan approved in the settlement of the 2023 formula rate plan filing and contract costs of $1.7 million in 2024 related to operational performance, customer service, and organizational health initiatives. The decrease was partially offset by an increase of $1.8 million in energy efficiency expenses primarily due to higher energy efficiency costs, partially offset by the timing of recovery from customers. See Note 2 to the financial statements in the Form 10-K for discussion of the formula rate plan filing.

Depreciation and amortization expenses increased primarily due to additions to plant in service.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Other regulatory charges (credits) - net includes a regulatory charge of $78.5 million, recorded in first quarter 2024, primarily to reflect a settlement in principle between Entergy New Orleans and the City Council in April 2024 for additional sharing with customers of income tax benefits from the resolution of the 2016-2018 IRS audit. See Note 3 to the financial statements in the Form 10-K for discussion of the April 2024 settlement in principle and discussion of the resolution of the 2016-2018 IRS audit.

Other income (deductions) decreased primarily due to the deferral of certain other postretirement benefit expense credits, effective September 2024, in accordance with the terms of the 2024 formula rate plan filing. See Note 2 to the financial statements in the Form 10-K for discussion of the 2024 formula rate plan filing and Note 11 to the financial statements in the Form 10-K for discussion of the other postretirement benefits accounting treatment.

Interest expense increased primarily due to an increase of $6.6 million in carrying costs on regulatory liability balances.

Income Taxes

The effective income tax rates were 24.1% for the second quarter 2025 and 23.9% for the six months ended June 30, 2025. The differences in the effective income tax rates for the second quarter 2025 and the six months ended June 30, 2025 versus the federal statutory rate of 21% were primarily due to the accrual for state income taxes, partially offset by certain book and tax differences related to utility plant items.

The effective income tax rates were 26.2% for the second quarter 2024 and 29.8% for the six months ended June 30, 2024. The differences in the effective income tax rates for the second quarter 2024 and the six months ended June 30, 2024 versus the federal statutory rate of 21% were primarily due to the accrual for state income taxes.

Income Tax Legislation and Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Income Tax Legislation and Regulation” herein and in the Form 10-K for discussion of income tax legislation and regulation.

Sale of Natural Gas Distribution Business

See Note 13 to the financial statements herein and the “Held For Sale - Natural Gas Distribution Businesses” section in Note 14 to the financial statements in the Form 10-K for discussion of the sale of Entergy New Orleans’s gas distribution business on July 1, 2025.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Liquidity and Capital Resources

Cash Flow

Cash flows for the six months ended June 30, 2025 and 2024 were as follows:

In Thousands

View SEC source
Line item20252024
Cash and cash equivalents at beginning of period$31,777$26
Net cash provided by (used in):
Operating activities23,65245,416
Investing activities(77,385)(74,449)
Financing activities21,98235,565
Net increase (decrease) in cash and cash equivalents(31,751)6,532
Cash and cash equivalents at end of period$26$6,558

Operating Activities

Net cash flow provided by operating activities decreased $21.8 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to the timing of payments to vendors and higher fuel and purchased power payments in 2025 as compared to 2024. The decrease was partially offset by higher collections from customers. See Note 2 to the financial statements in the Form 10-K for a discussion of fuel and purchased power cost recovery.

Investing Activities

Net cash flow used in investing activities increased $2.9 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to an increase of $17.9 million in non-nuclear generation construction expenditures primarily due to a higher scope of work performed during plant outages in 2025 as compared to 2024, partially offset by the receipt of $10.3 million from the storm reserve escrow account in 2025. See “Uses and Sources of Capital - Hurricane Francine” below for discussion of the Hurricane Francine proceeding.

Financing Activities

Net cash flow provided by financing activities decreased $13.6 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to the issuances of $65 million of 6.41% Series mortgage bonds, $50 million of 6.54% Series mortgage bonds, and $35 million of 6.25% Series mortgage bonds, each in May 2024, and the repayment, at maturity, of $78 million of 3.00% Series mortgage bonds in March 2025. The decrease was partially offset by the repayment, at maturity, of an $85 million unsecured term loan in June 2024, proceeds received in March 2025 from an $80 million unsecured term loan (subsequently repaid in July 2025), and money pool activity.

Increases in Entergy New Orleans’s payable to the money pool are a source of cash flow, and Entergy New Orleans’s payable to the money pool increased $20.9 million for the six months ended June 30, 2025 compared to decreasing by $21.7 million for the six months ended June 30, 2024. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and other borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Capital Structure

Entergy New Orleans’s debt to capital ratio is shown in the following table.

Line itemJune 30, 2025December 31, 2024
Debt to capital50.5%51.5%
Effect of subtracting cash(1.1%)
Net debt to net capital (non-GAAP)50.5%50.4%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings, finance lease obligations, long-term debt, including the currently maturing portion, and the long-term payable due to an associated company. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. Entergy New Orleans uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy New Orleans’s financial condition. The net debt to net capital ratio is a non-GAAP measure. Entergy New Orleans also uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy New Orleans’s financial condition because net debt indicates Entergy New Orleans’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy New Orleans’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Recent announcements of changes to international trade policy and tariffs and further similar changes may impact Entergy New Orleans’s business, operations, results of operations, and liquidity and capital resources. Potential impacts may include increases in costs associated with Entergy New Orleans’s capital investments or operation and maintenance expenses; operational impacts, such as supply chain, manufacturing, or raw materials sourcing disruptions which may affect Entergy New Orleans’s ability to make planned capital investments as and when expected and needed; legal uncertainties, such as potential legal or other challenges to presidential tariff authority; or broader economic risks, including shifting customer demand, impacts on customer investment decisions, and volatile or uncertain credit and capital markets, which may affect Entergy New Orleans’s ability to access needed capital. The nature and extent of any such effects will depend on, among other things, the specifics of the changes that are ultimately implemented both domestically and internationally, the responses of vendors, suppliers, and other counterparties to those changes, indirect effects on the price and availability of non-tariffed goods, and the effectiveness of mitigation measures.

Entergy New Orleans’s receivables from or (payables to) the money pool were as follows:

In Thousands

View SEC source
June 30, 2025December 31, 2024June 30, 2024December 31, 2023
($20,884)$3,146$1,110($21,651)

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Entergy New Orleans has a credit facility in the amount of $25 million scheduled to expire in June 2027. The credit facility includes fronting commitments for the issuance of letters of credit against $10 million of the borrowing capacity of the facility. As of June 30, 2025, there were no cash borrowings and no letters of credit outstanding under the credit facility. In addition, Entergy New Orleans is a party to an uncommitted letter of credit facility as a means to post collateral to support its obligations to MISO. As of June 30, 2025, a $0.5 million letter of credit was outstanding under Entergy New Orleans’s uncommitted letter of credit facility. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

Hurricane Francine

In September 2024, Hurricane Francine caused damage to the areas served by Entergy New Orleans. The storm resulted in widespread power outages, primarily due to damage to distribution infrastructure as a result of strong winds and heavy rain, and the loss of sales during the power outages. In December 2024, in accordance with the terms of its storm recovery reserve escrow agreement, Entergy New Orleans transmitted to the City Council a notice of intent to withdraw up to $20 million in estimated storm costs resulting from Hurricane Francine from its storm recovery reserve escrow account, subject to the City Council’s certification of those costs. In January 2025, the City Council authorized the withdrawal, and in February 2025, Entergy New Orleans withdrew $10.3 million from its storm recovery reserve escrow account.

State and Local Rate Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – State and Local Rate Regulation” in the Form 10-K for a discussion of state and local rate regulation. The following is an update to that discussion.

Retail Rates

2025 Formula Rate Plan Filing

In April 2025, Entergy New Orleans submitted to the City Council its formula rate plan 2024 test year filing. The 2024 evaluation report produced an electric earned return on equity of 10.98% compared to the authorized return on equity of 9.35%. Without adjustments, this would result in a decrease in electric rates of $13.8 million. The decrease in electric rates is driven by the realignment of regulatory liabilities into the formula from a separate rate mechanism, partially offset by the cost of known and measurable electric capital additions. The filing also commences the previously authorized recovery of certain regulatory costs and requests a revenue-neutral recovery to offset a proposed reduction in bill payment late fees. Taking into account these proposed adjustments, the filing presents a decrease in authorized electric revenues of $8.6 million. The City Council’s advisors issued their report in July 2025 seeking a reduction in Entergy New Orleans’s requested electric formula rate plan revenues of approximately $7.2 million due to certain proposed cost realignments and disallowances, of which $4.1 million is associated with Entergy New Orleans’s proposed implementation, on a revenue neutral basis, of a proposed reduction in customer late fees. The City Council’s advisors also proposed rate mitigation in the amount of $4.4 million through offsets to the formula rate plan funded by certain regulatory liabilities. The City Council’s advisors’ report began a 35-day period to resolve any disputes among the parties regarding the formula rate plan. For any disputed rate adjustments, the City Council would set a procedural schedule to resolve. Resulting rates will be effective with the first billing cycle of September 2025 pursuant to the formula rate plan tariff.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation” in the Form 10-K for a discussion of federal regulation.

Entergy New Orleans, LLC and Subsidiaries

Management’s Financial Discussion and Analysis

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy New Orleans’s accounting for utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

  • (Unaudited)
  • (In Thousands)
  • (In Thousands)_

CONSOLIDATED STATEMENTS OF OPERATIONS

For the Three and Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands · In Thousands

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
OPERATING REVENUES
Electric$183,781$178,664$322,706$335,605
Natural gas26,21920,67768,34956,697
TOTAL210,000199,341391,055392,302
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale26,54618,31438,90949,139
Purchased power69,12664,318136,867124,700
Other operation and maintenance44,26941,72082,92785,052
Taxes other than income taxes14,97914,18729,87229,609
Depreciation and amortization22,35821,13044,20342,044
Other regulatory charges (credits) - net(3,160)1,659(6,590)83,179
TOTAL174,118161,328326,188413,723
OPERATING INCOME (LOSS)35,88238,01364,867(21,421)
OTHER INCOME (DEDUCTIONS)
Allowance for equity funds used during construction494511800889
Interest and investment income168316602457
Miscellaneous - net(794)381(1,373)352
TOTAL(132)1,208291,698
INTEREST EXPENSE
Interest expense12,23610,81025,71120,336
Allowance for borrowed funds used during construction(272)(214)(439)(371)
TOTAL11,96410,59625,27219,965
INCOME (LOSS) BEFORE INCOME TAXES23,78628,62539,624(39,688)
Income taxes5,7447,4929,483(11,841)
NET INCOME (LOSS)$18,042$21,133$30,141($27,847)
See Notes to Financial Statements.

(Page left blank intentionally)

  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED STATEMENTS OF CASH FLOWS

For the Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
OPERATING ACTIVITIES
Net income (loss)$30,141($27,847)
Adjustments to reconcile net income (loss) to net cash flow provided by operating activities:
Depreciation and amortization44,20342,044
Deferred income taxes, investment tax credits, and non-current taxes accrued(9,350)(19,560)
Changes in assets and liabilities:
Receivables(22,585)(111,913)
Fuel inventory(1,188)544
Accounts payable(5,661)(10,311)
Prepaid taxes and taxes accrued19,5567,345
Interest accrued(2,629)(1,220)
Deferred fuel costs(4,203)(51)
Other working capital accounts(8,825)(8,120)
Provisions for estimated losses(10,772)2,473
Other regulatory assets10,33811,073
Other regulatory liabilities(13,791)167,529
Pension and other postretirement funded status(4,804)(3,876)
Other assets and liabilities3,222(2,694)
Net cash flow provided by operating activities23,65245,416
INVESTING ACTIVITIES
Construction expenditures(91,611)(72,409)
Allowance for equity funds used during construction800889
Changes in money pool receivable - net3,146(1,110)
Receipt from storm reserve escrow account10,333
Payments to storm reserve escrow account(1,664)(2,939)
Changes in securitization account1,6111,120
Net cash flow used in investing activities(77,385)(74,449)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt79,717149,075
Retirement of long-term debt(78,000)(91,245)
Changes in money pool payable - net20,884(21,651)
Other(619)(614)
Net cash flow provided by financing activities21,98235,565
Net increase (decrease) in cash and cash equivalents(31,751)6,532
Cash and cash equivalents at beginning of period31,77726
Cash and cash equivalents at end of period$26$6,558
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid during the period for:
Interest - net of amount capitalized$27,816$20,159
Income taxes$—$2,598
Noncash investing activities:
Accrued construction expenditures$5,059$4,263
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED BALANCE SHEETS · ASSETS

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT ASSETS
Cash and cash equivalents:
Cash$26$374
Temporary cash investments31,403
Total cash and cash equivalents2631,777
Securitization recovery trust account1,611
Accounts receivable:
Customer79,70965,731
Allowance for doubtful accounts(3,395)(6,735)
Associated companies4,9595,844
Other5,7729,467
Accrued unbilled revenues39,99733,296
Total accounts receivable127,042107,603
Deferred fuel costs5,599
Fuel inventory - at average cost766320
Materials and supplies29,22625,516
Current assets held for sale14,75713,100
Prepayments and other19,16912,128
TOTAL196,585192,055
OTHER PROPERTY AND INVESTMENTS
Storm reserve escrow account75,07383,742
Other832832
TOTAL75,90584,574
UTILITY PLANT
Electric2,193,8232,160,165
Natural gas43,72343,279
Construction work in progress43,45618,269
TOTAL UTILITY PLANT2,281,0022,221,713
Less - accumulated depreciation and amortization785,518768,305
UTILITY PLANT - NET1,495,4841,453,408
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets122,938133,261
Deferred fuel costs4,0804,080
Non-current assets held for sale289,126284,738
Other74,77971,037
TOTAL490,923493,116
TOTAL ASSETS$2,258,897$2,223,153
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED BALANCE SHEETS · LIABILITIES AND EQUITY

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT LIABILITIES
Currently maturing long-term debt$165,000$78,000
Payable due to associated company1,1401,140
Accounts payable:
Associated companies63,78045,479
Other40,21643,750
Customer deposits33,07028,834
Taxes accrued28,3428,786
Interest accrued6,0428,671
Deferred fuel costs980
Other18,16514,427
TOTAL355,755230,067
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued192,918201,541
Accumulated deferred investment tax credits15,56615,617
Regulatory liability for income taxes - net16,50615,000
Other regulatory liabilities245,127260,312
Accumulated provisions79,52190,293
Long-term debt565,556650,463
Long-term payable due to associated company5,8645,864
Other54,34256,395
TOTAL1,175,4001,295,485
Commitments and Contingencies
EQUITY
Member's equity727,742697,601
TOTAL727,742697,601
TOTAL LIABILITIES AND EQUITY$2,258,897$2,223,153
See Notes to Financial Statements.

CONSOLIDATED STATEMENTS OF CHANGES IN MEMBER'S EQUITY

For the Six Months Ended June 30, 2025 and 2024 · Unaudited

View SEC source
Member's Equity
(In Thousands)
Balance at December 31, 2023$806,754
Net loss(48,980)
Balance at March 31, 2024757,774
Net income21,133
Balance at June 30, 2024$778,907
Balance at December 31, 2024$697,601
Net income12,099
Balance at March 31, 2025709,700
Net income18,042
Balance at June 30, 2025$727,742
See Notes to Financial Statements.

ENTERGY TEXAS, INC. AND SUBSIDIARIES

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

Results of Operations

Net Income

Second Quarter 2025 Compared to Second Quarter 2024

Net income decreased $8.7 million primarily due to higher purchased power costs related to the procurement of capacity through MISO’s annual planning resource auction, partially offset by higher retail electric price and higher other income.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Net income increased $21.4 million primarily due to higher retail electric price, higher volume/weather, and higher other income, partially offset by higher purchased power costs related to the procurement of capacity through MISO’s annual planning resource auction, higher taxes other than income taxes, and higher interest expense.

Operating Revenues

Second Quarter 2025 Compared to Second Quarter 2024

Following is an analysis of the change in operating revenues comparing the second quarter 2025 to the second quarter 2024:

In Millions

View SEC source
Line itemAmount
2024 operating revenues$519.1
Fuel, rider, and other revenues that do not significantly affect net income(11.7)
Retail electric price19.8
Volume/weather4.4
2025 operating revenues$531.6

Entergy Texas’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to the implementation of the distribution cost recovery factor rider effective with the first billing cycle in October 2024 and an increase in the distribution cost recovery factor rider effective in late December 2024. See Note 2 to the financial statements in the Form 10-K for discussion of the distribution cost recovery factor rider filings.

The volume/weather variance is primarily due to an increase in industrial and commercial usage. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the primary metals, wood products, petroleum refining, and transportation industries, and an increase in demand from small industrial customers, partially offset by a decrease in demand from co-generation customers. The increase in commercial usage is primarily due to an increase in customers.

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

Total electric energy sales for Entergy Texas for the three months ended June 30, 2025 and 2024 are as follows:

Line item20252024% Change
(GWh)
Residential1,7411,778(2)
Commercial1,2801,2344
Industrial2,6212,4049
Governmental6568(4)
Total retail5,7075,4844
Sales for resale:
Non-associated companies93229(59)
Total5,8005,7132

See Note 12 to the financial statements herein for additional discussion of Entergy Texas’s operating revenues.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Following is an analysis of the change in operating revenues comparing the six months ended June 30, 2025 to the six months ended June 30, 2024:

In Millions

View SEC source
Line itemAmount
2024 operating revenues$963.6
Fuel, rider, and other revenues that do not significantly affect net income(47.3)
Retail electric price31.3
Volume/weather26.0
2025 operating revenues$973.6

Entergy Texas’s results include revenues from rate mechanisms designed to recover fuel, purchased power, and other costs such that the revenues and expenses associated with these items generally offset and do not affect net income. “Fuel, rider, and other revenues that do not significantly affect net income” includes the revenue variance associated with these items.

The retail electric price variance is primarily due to the implementation of the distribution cost recovery factor rider effective with the first billing cycle in October 2024 and an increase in the distribution cost recovery factor rider effective in late December 2024. See Note 2 to the financial statements in the Form 10-K for discussion of the distribution cost recovery factor rider filings.

The volume/weather variance is primarily due to the effect of more favorable weather on residential sales, an increase in weather-adjusted residential usage, and an increase in commercial and industrial usage. The increase in weather-adjusted residential usage and the increase in commercial usage are primarily due to an increase in customers. The increase in industrial usage is primarily due to an increase in demand from large industrial customers, primarily in the wood products, petrochemicals, petroleum refining, and transportation industries, and an increase in demand from co-generation customers.

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

Total electric energy sales for Entergy Texas for the six months ended June 30, 2025 and 2024 are as follows:

Line item20252024% Change
(GWh)
Residential3,3003,0897
Commercial2,3892,3173
Industrial4,7814,4587
Governmental128131(2)
Total retail10,5989,9956
Sales for resale:
Non-associated companies144346(58)
Total10,74210,3414

See Note 12 to the financial statements herein for additional discussion of Entergy Texas’s operating revenues.

Other Income Statement Variances

Second Quarter 2025 Compared to Second Quarter 2024

Purchased power includes an increase in second quarter 2025 of $20 million in costs related to the procurement of capacity through MISO’s annual planning resource auction, including the effect of a significant increase in MISO’s seasonal auction clearing price, due to the implementation of a reliability-based demand curve, for capacity transactions during the summer months. Although Entergy Texas does not have the ability to recover its MISO capacity costs incurred to date beyond the level included in base rates, in June 2025, Texas legislation established a capacity cost recovery rider mechanism that would allow for the recovery of costs related to the procurement of capacity through MISO’s annual planning resource auction outside of base rates, through a rider that is updated annually. Entergy Texas plans to file for such a rider to recover future capacity procurement costs at the earliest opportunity in 2026.

Depreciation and amortization expenses decreased primarily due to the recognition of $13.8 million in depreciation expense in second quarter 2024 for the 2022 base rate case relate back period, effective over six months beginning January 2024. The recognition of depreciation expense for the relate back period was effective over the same period as collections from the relate back surcharge rider and resulted in no effect on net income. See Note 2 to the financial statements in the Form 10-K for discussion of the 2022 base rate case. The decrease was partially offset by additions to plant in service.

Other income increased primarily due to an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2025, including the Orange County Advanced Power Station project and the Legend Power Station project.

Interest expense increased primarily due to the issuance of $500 million of 5.25% Series mortgage bonds in February 2025 and the issuance of $350 million of 5.55% Series mortgage bonds in August 2024, partially offset by an increase in the allowance for borrowed funds used during construction due to higher construction work in progress in 2025, including the Orange County Advanced Power Station project and the Legend Power Station project.

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Purchased power includes an increase in 2025 of $21 million in costs related to the procurement of capacity through MISO’s annual planning resource auction, including the effect of a significant increase in MISO’s seasonal auction clearing price, due to the implementation of a reliability-based demand curve, for capacity transactions during the summer months. Although Entergy Texas does not have the ability to recover its MISO capacity costs incurred to date beyond the level included in base rates, in June 2025, Texas legislation established a capacity cost recovery rider mechanism that would allow for the recovery of costs related to the procurement of capacity through MISO’s annual planning resource auction outside of base rates, through a rider that is updated annually. Entergy Texas plans to file for such a rider to recover future capacity procurement costs at the earliest opportunity in 2026.

Taxes other than income taxes increased primarily due to an increase in local franchise taxes as a result of higher retail revenues in 2025 as compared to 2024.

Depreciation and amortization expenses decreased primarily due to the recognition of $27.6 million in depreciation expense in 2024 for the 2022 base rate case relate back period, effective over six months beginning January 2024. The recognition of depreciation expense for the relate back period was effective over the same period as collections from the relate back surcharge rider and resulted in no effect on net income. See Note 2 to the financial statements in the Form 10-K for discussion of the 2022 base rate case. The decrease was partially offset by additions to plant in service.

Other income increased primarily due to an increase in the allowance for equity funds used during construction due to higher construction work in progress in 2025, including the Orange County Advanced Power Station project and the Legend Power Station project.

Interest expense increased primarily due to the issuance of $350 million of 5.55% Series mortgage bonds in August 2024 and the issuance of $500 million of 5.25% Series mortgage bonds in February 2025, partially offset by an increase in the allowance for borrowed funds used during construction due to higher construction work in progress in 2025, including the Orange County Advanced Power Station project and the Legend Power Station project.

Income Taxes

The effective income tax rates were 16.7% for the second quarter 2025 and 16.2% for the six months ended June 30, 2025. The differences in the effective income tax rates for the second quarter 2025 and the six months ended June 30, 2025 versus the federal statutory rate of 21% were primarily due to book and tax differences related to the allowance for equity funds used during construction.

The effective income tax rates were 18.4% for the second quarter 2024 and 18.6% for the six months ended June 30, 2024. The differences in the effective income tax rates for the second quarter 2024 and the six months ended June 30, 2024 versus the federal statutory rate of 21% were primarily due to book and tax differences related to the allowance for equity funds used during construction and certain book and tax differences related to utility plant items.

Income Tax Legislation and Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Income Tax Legislation and Regulation” herein and in the Form 10-K for discussion of income tax legislation and regulation.

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

Liquidity and Capital Resources

Cash Flow

Cash flows for the six months ended June 30, 2025 and 2024 were as follows:

In Thousands

View SEC source
Line item20252024
Cash and cash equivalents at beginning of period$184,997$21,986
Net cash provided by (used in):
Operating activities242,336292,420
Investing activities(879,311)(215,942)
Financing activities469,72126,442
Net increase (decrease) in cash and cash equivalents(167,254)102,920
Cash and cash equivalents at end of period$17,743$124,906

Operating Activities

Net cash flow provided by operating activities decreased $50.1 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to:

  • the timing of recovery of fuel and purchased power costs and higher fuel and purchased power payments. See Note 2 to the financial statements in the Form 10-K for a discussion of fuel and purchased power cost recovery;
  • an increase of $12.9 million in interest paid;
  • an increase of $10.3 million in storm spending; and
  • lower collections from customers.

Investing Activities

Net cash flow used in investing activities increased $663.4 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to:

  • money pool activity;
  • an increase of $386.2 million in non-nuclear generation construction expenditures primarily due to higher spending on the Legend Power Station project, the Orange County Advanced Power Station project, and the Lone Star Power Station project;
  • an increase of $30.1 million in transmission construction expenditures primarily due to increased spending on various transmission projects in 2025 and higher capital expenditures as a result of increased development in Entergy Texas’s service area; and
  • an increase of $16 million in distribution construction expenditures primarily due to higher capital expenditures as a result of increased development in Entergy Texas’s service territory, partially offset by lower capital expenditures for storm restoration in 2025.

The increase was partially offset by a decrease of $17.3 million in information technology capital expenditures primarily due to decreased spending on technology upgrade projects in 2025 and cash collateral of $12.7 million posted in 2024 to support Entergy Texas’s obligation to MISO.

Decreases in Entergy Texas’s receivable from the money pool are a source of cash flow, and Entergy Texas’s receivable from the money pool decreased $13.7 million for the six months ended June 30, 2025 compared

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

to decreasing by $296.7 million for the six months ended June 30, 2024. The money pool is an intercompany cash management program that makes possible intercompany borrowing and lending arrangements, and the money pool and other borrowing arrangements are designed to reduce the Registrant Subsidiaries’ dependence on external short-term borrowings.

Financing Activities

Net cash flow provided by financing activities increased $443.3 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to the issuance of $500 million of 5.25% Series mortgage bonds in February 2025, partially offset by a decrease of $63.6 million in advance payments from customers for construction related to transmission, distribution, and generator interconnection agreements. See Note 4 to the financial statements herein and Note 5 to the financial statements in the Form 10-K for more details on long-term debt.

Capital Structure

Entergy Texas’s debt to capital ratio is shown in the following table. The increase in the debt to capital ratio for Entergy Texas is primarily due to the net issuance of long-term debt in 2025.

Line itemJune 30, 2025December 31, 2024
Debt to capital53.7%51.6%
Effect of excluding securitization bonds(1.4%)(1.7%)
Debt to capital, excluding securitization bonds (non-GAAP) (a)52.3%49.9%
Effect of subtracting cash(0.2%)(1.5%)
Net debt to net capital, excluding securitization bonds (non-GAAP) (a)52.1%48.4%

(a)Calculation excludes the securitization bonds, which are non-recourse to Entergy Texas.

Net debt consists of debt less cash and cash equivalents. Debt consists of finance lease obligations and long-term debt, including the currently maturing portion. Capital consists of debt and equity. Net capital consists of capital less cash and cash equivalents. The debt to capital ratio excluding securitization bonds and net debt to net capital ratio excluding securitization bonds are non-GAAP measures. Entergy Texas uses the debt to capital ratios excluding securitization bonds in analyzing its financial condition and believes they provide useful information to its investors and creditors in evaluating Entergy Texas’s financial condition because the securitization bonds are non-recourse to Entergy Texas, as more fully described in Note 5 to the financial statements in the Form 10-K. Entergy Texas also uses the net debt to net capital ratio excluding securitization bonds in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating Entergy Texas’s financial condition because net debt indicates Entergy Texas’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of Entergy Texas’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Recent announcements of changes to international trade policy and tariffs and further similar changes may impact Entergy Texas’s business, operations, results of operations, and liquidity and capital resources. Potential impacts may include increases in costs associated with Entergy Texas’s capital investments or operation and maintenance expenses; operational impacts, such as supply chain, manufacturing, or raw materials sourcing disruptions which may affect Entergy Texas’s ability to make planned capital investments as and when expected

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

and needed; legal uncertainties, such as potential legal or other challenges to presidential tariff authority; or broader economic risks, including shifting customer demand, impacts on customer investment decisions, and volatile or uncertain credit and capital markets, which may affect Entergy Texas’s ability to access needed capital. The nature and extent of any such effects will depend on, among other things, the specifics of the changes that are ultimately implemented both domestically and internationally, the responses of vendors, suppliers, and other counterparties to those changes, indirect effects on the price and availability of non-tariffed goods, and the effectiveness of mitigation measures.

Entergy Texas’s receivables from the money pool were as follows:

In Thousands

View SEC source
June 30, 2025December 31, 2024June 30, 2024December 31, 2023
$4,835$18,504$21,212$317,882

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

Entergy Texas has a credit facility in the amount of $300 million scheduled to expire in June 2030. The credit facility includes fronting commitments for the issuance of letters of credit against $25 million of the borrowing capacity of the facility. As of June 30, 2025, there were no cash borrowings and $1.1 million in letters of credit outstanding under the credit facility. In addition, Entergy Texas is a party to two uncommitted letter of credit facilities as a means to post collateral to support its obligations to MISO. As of June 30, 2025, $54.0 million in letters of credit were outstanding under one of Entergy Texas’s uncommitted letter of credit facilities. See Note 4 to the financial statements herein for additional discussion of the credit facilities.

Legend Power Station and Lone Star Power Station

As discussed in the Form 10-K, in June 2024, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate the Legend Power Station, a 754 MW combined cycle combustion turbine facility, which will be enabled for future carbon capture and storage and for hydrogen co-firing optionality, to be located in Jefferson County, Texas, and the Lone Star Power Station, a 453 MW simple-cycle combustion turbine facility, which will be enabled with hydrogen co-firing optionality, originally expected to be located in Liberty County, Texas. In March 2025, Entergy Texas filed testimony explaining that Entergy Texas planned to move forward with building the Lone Star Power Station on a more cost-effective alternative site in San Jacinto County, Texas. A hearing on the merits was held in April 2025. Also in April 2025, Entergy Texas, intervenors, and the PUCT staff filed initial briefs. In its initial brief, the PUCT staff recommends denial of Entergy Texas’s application or, in the alternative, approval subject to conditions that include a prudence review by an external consultant if actual project costs exceed estimated costs by more than 10%, transmission cost reporting, and weatherization of both the Legend Power Station and the Lone Star Power Station. Certain intervenors requested that the PUCT impose various conditions upon the approval of the resources, including, among others, cost recovery limitations, a direction that Entergy Texas initiate a competitive tariff proceeding to facilitate industrial sleeving, a requirement for additional regulatory approvals related to hydrogen or carbon capture and storage implementation, limits on the recovery of supplemental filing costs, and calculation of AFUDC based on an adjusted weighted average cost of capital. Reply briefs were filed in May 2025. In June 2025 the ALJs with the State Office of Administrative Hearings issued a proposal for decision, in which they recommended rejection of Entergy Texas’s application to construct the Legend Power Station and the Lone Star Power Station based upon their finding that Entergy Texas did not demonstrate the resources to be cost-effective alternatives to address the uncontested need for additional generation. In the alternative, the ALJs recommended that if the PUCT approves the resources, that conditions be imposed, including a deferral of the finding that the resources were prudently selected until Entergy Texas’s next rate case, a prudence review by an external consultant if actual project costs exceed estimated costs by more than 10%, weatherization requirements, and a requirement that Entergy Texas obtain additional regulatory approvals prior to implementing hydrogen co-firing or carbon

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

capture and storage. The ALJs’ proposal for decision is an interim step in the certification process, and it is not binding upon the PUCT. Entergy Texas filed exceptions in July 2025. A PUCT decision is expected in third quarter 2025. Subject to receipt of required regulatory approval and other conditions, both facilities are expected to be in service by mid-2028.

Segno Solar and Votaw Solar

As discussed in the Form 10-K, in July 2024, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate the Segno Solar facility, a 170 MW solar facility to be located in Polk County, Texas, and the Votaw Solar facility, a 141 MW solar facility to be located in Hardin County, Texas. In July 2025, Entergy Texas filed, and the ALJs with the State Office of Administrative Hearings granted, an unopposed motion to abate this proceeding to give the parties to the proceeding additional time for settlement discussions.

Southeast Texas Area Reliability Project (SETEX)

In February 2025, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate a new single-circuit 500 kV transmission line and associated stations and 138/230 kV facilities. The transmission line is expected to be approximately 131 to 160 miles in length and the estimated cost of the project ranges from $1.3 billion to $1.5 billion, depending upon the route ultimately approved by the PUCT. Also in February 2025 the PUCT referred the proceeding to the State Office of Administrative Hearings. A hearing on the merits was held in May 2025. In July 2025 the ALJs with the State Office of Administrative Hearings issued a proposal for decision recommending the PUCT approve Entergy Texas’s application to construct SETEX and recommending the PUCT’s approval include selection of a specific route with an estimated cost of $1.4 billion. A PUCT decision is expected in third quarter 2025. Subject to receipt of required regulatory approval and other conditions, construction of the project is expected to be completed by the end of 2029.

Legend to Sandling 230kV Transmission Line

In April 2025, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate a new single-circuit 230 kV transmission line. The transmission line is expected to be approximately 9 to 10 miles in length and the estimated cost of the project ranges from $87.4 million to $88.6 million, depending on the route ultimately approved by the PUCT. Also in April 2025 the PUCT referred the proceeding to the State Office of Administrative Hearings. In July 2025, Entergy Texas filed an unopposed settlement agreement resolving all issues in the proceeding and a joint motion, which the ALJ with the State Office of Administrative Hearings granted, on behalf of the parties to the proceeding to cancel the remaining procedural schedule, to admit evidence, and to remand the proceeding to the PUCT to consider the unopposed settlement agreement. A PUCT decision is expected in fourth quarter 2025. Subject to receipt of required regulatory approval and other conditions, construction of the project is expected to be completed by second quarter 2027.

Cypress to Legend 500 kV Transmission Line

In May 2025, Entergy Texas filed an application seeking PUCT approval to amend Entergy Texas’s certificate of convenience and necessity to construct, own, and operate a new single-circuit 500 kV transmission line. The transmission line is expected to be approximately 40 to 49 miles in length and the estimated cost of the project ranges from $392.7 million to $436.2 million, depending on the route ultimately approved by the PUCT. In June 2025 the PUCT referred the proceeding to the State Office of Administrative Hearings and the ALJs with the State Office of Administrative Hearings adopted a procedural schedule with a hearing on the merits to be held in

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

mid-August 2025. A PUCT decision is expected in fourth quarter 2025. Subject to receipt of required regulatory approval and other conditions, construction of the project is expected to be completed by the end of 2028.

State and Local Rate Regulation and Fuel-Cost Recovery

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - State and Local Rate Regulation and Fuel-Cost Recovery” in the Form 10-K for a discussion of state and local rate regulation and fuel-cost recovery. The following are updates to that discussion.

Retail Rates

Distribution Cost Recovery Factor (DCRF) Rider

In April 2025, Entergy Texas filed with the PUCT a request to amend its DCRF rider. The amended rider was designed to collect from Entergy Texas’s retail customers approximately $77.8 million annually, or $29.3 million in incremental annual revenues beyond Entergy Texas’s then-effective DCRF rider based on its capital invested in distribution between July 1, 2024 and December 31, 2024, including distribution-related restoration costs associated with Hurricane Beryl. In June 2025 the PUCT approved the DCRF rider, consistent with Entergy Texas’s as-filed request, and rates became effective on June 25, 2025.

Transmission Cost Recovery Factor (TCRF) Rider

As discussed in the Form 10-K, in October 2024, Entergy Texas filed with the PUCT a request to amend its TCRF rider, which was previously reset to zero in June 2023 as a result of the 2022 base rate case. The amended rider was designed to collect from Entergy Texas’s retail customers approximately $9.7 million annually based on its capital invested in transmission between January 1, 2022 and June 30, 2024 and changes in other transmission charges. In April 2025 the PUCT approved the TCRF rider, consistent with Entergy Texas’s as-filed request, and rates became effective for usage on and after April 7, 2025.

Fuel and purchased power cost recovery

As discussed in the Form 10-K, in September 2024, Entergy Texas filed an application with the PUCT to reconcile its fuel and purchased power costs for the period from April 2022 through March 2024. During the reconciliation period, Entergy Texas incurred approximately $1.6 billion in eligible fuel and purchased power expenses to generate and purchase electricity to serve its customers, net of certain revenues credited to such expenses and other adjustments. Entergy Texas’s cumulative under-recovery balance for the reconciliation period was approximately $30 million, including interest, which Entergy Texas requested authority to carry over as part of the cumulative fuel balance for the subsequent reconciliation period beginning April 2024. In November 2024 the PUCT referred the proceeding to the State Office of Administrative Hearings. In March 2025, Texas Industrial Energy Consumers, an intervenor, filed testimony regarding the recovery of capacity costs for a certain power purchase agreement, arguing the capacity costs should be imputed and treated as non-reconcilable fuel expense, recovered in Entergy Texas’s base rates. In April 2025 the PUCT staff filed testimony and later in April 2025, Entergy Texas filed rebuttal testimony. In May 2025, Entergy Texas filed, and the ALJ with the State Office of Administrative Hearings granted, a request for a paper hearing and to cancel the oral hearing on the merits previously scheduled for later in May 2025. In June 2025, Entergy Texas filed, and the ALJ with the State Office of Administrative Hearings granted, a joint motion to abate the proceeding to give the parties to the proceeding additional time to finalize a settlement.

Federal Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Federal Regulation” in the Form 10-K for a discussion of federal regulation.

Entergy Texas, Inc. and Subsidiaries

Management’s Financial Discussion and Analysis

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Industrial and Commercial Customers

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Industrial and Commercial Customers” in the Form 10-K for a discussion of industrial and commercial customers.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in Entergy Texas’s accounting for utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

  • (Unaudited)
  • (In Thousands)
  • (In Thousands)_

CONSOLIDATED INCOME STATEMENTS

For the Three and Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands · In Thousands

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
OPERATING REVENUES
Electric$531,641$519,077$973,580$963,568
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale96,736115,520121,128211,657
Purchased power124,88088,713257,498183,056
Other operation and maintenance83,81883,176158,273161,136
Taxes other than income taxes29,79222,97960,41947,546
Depreciation and amortization80,83090,824161,510180,329
Other regulatory charges (credits) - net2,587(12,477)5,844(13,452)
TOTAL418,643388,735764,672770,272
OPERATING INCOME112,998130,342208,908193,296
OTHER INCOME
Allowance for equity funds used during construction19,96310,83437,33520,082
Interest and investment income1,9752,7914,7346,695
Miscellaneous - net(2,477)(3,186)(3,631)(5,498)
TOTAL19,46110,43938,43821,279
INTEREST EXPENSE
Interest expense43,14734,48386,21966,449
Allowance for borrowed funds used during construction(8,502)(4,219)(15,887)(7,821)
TOTAL34,64530,26470,33258,628
INCOME BEFORE INCOME TAXES97,814110,517177,014155,947
Income taxes16,31820,29528,66228,981
NET INCOME81,49690,222148,352126,966
Preferred dividend requirements5185181,0361,036
EARNINGS APPLICABLE TO COMMON STOCK$80,978$89,704$147,316$125,930
See Notes to Financial Statements.

(Page left blank intentionally)

  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED STATEMENTS OF CASH FLOWS

For the Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
OPERATING ACTIVITIES
Net income$148,352$126,966
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation and amortization161,510180,329
Deferred income taxes, investment tax credits, and non-current taxes accrued21,46621,112
Changes in assets and liabilities:
Receivables(36,849)(64,108)
Fuel inventory9,8171,877
Accounts payable37,26713,853
Taxes accrued(20,591)(21,155)
Interest accrued5,971(561)
Deferred fuel costs(69,075)80,220
Other working capital accounts(6,447)(9,386)
Provisions for estimated losses1,201(1,384)
Other regulatory assets60,12540,197
Other regulatory liabilities(13,317)(26,028)
Pension and other postretirement funded status(7,131)(8,190)
Other assets and liabilities(49,963)(41,322)
Net cash flow provided by operating activities242,336292,420
INVESTING ACTIVITIES
Construction expenditures(932,013)(522,890)
Allowance for equity funds used during construction37,33520,082
Changes in money pool receivable - net13,669296,670
Changes in securitization account1,6982,856
Increase in other investments(12,660)
Net cash flow used in investing activities(879,311)(215,942)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt493,772
Retirement of long-term debt(9,359)(9,104)
Preferred stock dividends paid(1,036)(1,036)
Other(13,656)36,582
Net cash flow provided by financing activities469,72126,442
Net increase (decrease) in cash and cash equivalents(167,254)102,920
Cash and cash equivalents at beginning of period184,99721,986
Cash and cash equivalents at end of period$17,743$124,906
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid during the period for:
Interest - net of amount capitalized$78,477$65,529
Income taxes$2,077$5,862
Noncash investing activities:
Accrued construction expenditures$127,069$343,525
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED BALANCE SHEETS · ASSETS

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT ASSETS
Cash and cash equivalents:
Cash$25$291
Temporary cash investments17,718184,706
Total cash and cash equivalents17,743184,997
Securitization recovery trust account1,0052,703
Accounts receivable:
Customer115,92384,842
Allowance for doubtful accounts(4,280)(1,304)
Associated companies14,47926,564
Other29,00043,773
Accrued unbilled revenues95,99374,060
Total accounts receivable251,115227,935
Deferred fuel costs9,804
Fuel inventory - at average cost36,15345,970
Materials and supplies166,111157,241
Prepayments and other31,14434,803
TOTAL513,075653,649
OTHER PROPERTY AND INVESTMENTS
Investments in affiliates - at equity84107
Other16,07615,878
TOTAL16,16015,985
UTILITY PLANT
Electric8,955,6678,628,625
Construction work in progress1,995,4141,513,170
TOTAL UTILITY PLANT10,951,08110,141,795
Less - accumulated depreciation and amortization2,661,7382,548,961
UTILITY PLANT - NET8,289,3437,592,834
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets (includes securitization property of $226,006 as of June 30, 2025 and $234,112 as of December 31, 2024)489,583549,708
Other177,552157,904
TOTAL667,135707,612
TOTAL ASSETS$9,485,713$8,970,080
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED BALANCE SHEETS · LIABILITIES AND EQUITY

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT LIABILITIES
Accounts payable:
Associated companies$53,562$65,335
Other592,907361,404
Customer deposits40,49040,782
Taxes accrued55,88376,474
Interest accrued44,67438,703
Deferred fuel costs59,271
Other19,82020,836
TOTAL807,336662,805
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued905,093868,849
Accumulated deferred investment tax credits6,8417,215
Regulatory liability for income taxes - net81,36493,766
Other regulatory liabilities17,79018,705
Asset retirement cost liabilities14,69517,688
Accumulated provisions11,1869,985
Long-term debt (includes securitization bonds of $230,445 as of June 30, 2025 and $239,622 as of December 31, 2024)4,038,4173,552,443
Other114,463397,412
TOTAL5,189,8494,966,063
Commitments and Contingencies
EQUITY
Common stock, no par value, authorized 200,000,000 shares; issued and outstanding 46,525,000 shares in 2025 and 202449,45249,452
Paid-in capital1,200,1251,200,125
Retained earnings2,200,2012,052,885
Total common shareholder's equity3,449,7783,302,462
Preferred stock without sinking fund38,75038,750
TOTAL3,488,5283,341,212
TOTAL LIABILITIES AND EQUITY$9,485,713$8,970,080
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY

For the Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands

View SEC source
Line itemPreferred StockCommon EquityCommon StockCommon EquityPaid-in CapitalCommon EquityRetained EarningsTotal
Balance at December 31, 2023$38,750$49,452$1,200,125$1,830,335$3,118,662
Net income36,74436,744
Preferred stock dividends(518)(518)
Balance at March 31, 202438,75049,4521,200,1251,866,5613,154,888
Net income90,22290,222
Preferred stock dividends(518)(518)
Balance at June 30, 2024$38,750$49,452$1,200,125$1,956,265$3,244,592
Balance at December 31, 2024$38,750$49,452$1,200,125$2,052,885$3,341,212
Net income66,85666,856
Preferred stock dividends(518)(518)
Balance at March 31, 202538,75049,4521,200,1252,119,2233,407,550
Net income81,49681,496
Preferred stock dividends(518)(518)
Balance at June 30, 2025$38,750$49,452$1,200,125$2,200,201$3,488,528
See Notes to Financial Statements.

SYSTEM ENERGY RESOURCES, INC.

MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS

System Energy’s principal asset consists of an ownership interest and a leasehold interest in Grand Gulf. The capacity and energy from its 90% interest is sold under the Unit Power Sales Agreement to its only four customers, Entergy Arkansas, Entergy Louisiana, Entergy Mississippi, and Entergy New Orleans. System Energy’s operating revenues are derived from the allocation of the capacity, energy, and related costs associated with its 90% interest in Grand Gulf pursuant to the Unit Power Sales Agreement. Payments under the Unit Power Sales Agreement are System Energy’s only source of operating revenues. See “Complaints Against System Energy - System Energy Settlement with the LPSC” in Note 2 to the financial statements herein for additional information regarding filings made with the FERC in May 2025 related to the Unit Power Sales Agreement. Also, as discussed in “Complaints Against System Energy” in Note 2 to the financial statements in the Form 10-K, System Energy and the Unit Power Sales Agreement have been the subject of several litigation proceedings at the FERC. Settlements that resolve all significant aspects of these complaints have been reached with the MPSC, the APSC, the City Council, and the LPSC, and these settlements have been approved by the FERC.

Results of Operations

Net Income

Second Quarter 2025 Compared to Second Quarter 2024

Net income decreased $3.5 million primarily due a lower rate of return on rate base, including the effects of lower authorized rate of return on equity and capital structure limitations reflected in monthly bills issued to Entergy New Orleans effective with the June 2024 service month per the settlement agreement with the City Council and the lower authorized rate of return on equity and capital structure limitations reflected in monthly bills issued to Entergy Louisiana effective with the September 2024 service month per the settlement with the LPSC, and lower operating revenues resulting from changes in rate base. See Note 2 to the financial statements in the Form 10-K for discussion of the settlements with the City Council and the LPSC.

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Net income decreased $11.3 million primarily due a lower rate of return on rate base, including the effects of lower authorized rate of return on equity and capital structure limitations reflected in monthly bills issued to Entergy New Orleans effective with the June 2024 service month per the settlement agreement with the City Council and the lower authorized rate of return on equity and capital structure limitations reflected in monthly bills issued to Entergy Louisiana effective with the September 2024 service month per the settlement with the LPSC. The decrease was partially offset by higher operating revenues resulting from changes in rate base. See Note 2 to the financial statements in the Form 10-K for discussion of the settlements with the City Council and the LPSC.

Income Taxes

The effective income tax rates were 19.4% for the second quarter 2025 and 20.3% for the six months ended June 30, 2025. The differences in the effective income tax rates for the second quarter 2025 and the six months ended June 30, 2025 versus the federal statutory rate of 21% were primarily due to certain book and tax differences related to utility plant items and book and tax differences related to the allowance for equity funds used during construction, partially offset by the accrual for state income taxes.

The effective income tax rates were 23.2% for the second quarter 2024 and 21.7% for the six months ended June 30, 2024. The differences in the effective income tax rates for the second quarter 2024 and the six months

System Energy Resources, Inc.

Management’s Financial Discussion and Analysis

ended June 30, 2024 versus the federal statutory rate of 21% were primarily due to the accrual for state income taxes, partially offset by book and tax differences related to the allowance for equity funds used during construction.

Income Tax Legislation and Regulation

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Income Tax Legislation and Regulation” herein and in the Form 10-K for discussion of income tax legislation and regulation. See Note 10 to the financial statements herein for discussion of the nuclear production tax credits recorded in second quarter 2025.

Liquidity and Capital Resources

Cash Flow

Cash flows for the six months ended June 30, 2025 and 2024 were as follows:

In Thousands

View SEC source
Line item20252024
Cash and cash equivalents at beginning of period$28,908$60
Net cash provided by (used in):
Operating activities131,50127,420
Investing activities(55,988)(216,666)
Financing activities(72,632)220,264
Net increase in cash and cash equivalents2,88131,018
Cash and cash equivalents at end of period$31,789$31,078

Operating Activities

Net cash flow provided by operating activities increased $104.1 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to the refund of $92 million made in May 2024 to Entergy Arkansas as a result of the settlement with the APSC and a decrease of $20.4 million in spending on nuclear refueling outage costs in 2025 as compared to 2024. See Note 2 to the financial statements in the Form 10-K for discussion of the settlement with the APSC.

Investing Activities

Net cash flow used in investing activities decreased $160.7 million for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 primarily due to net proceeds of $16.6 million in 2025 compared to net purchases of $115.5 million in 2024 as a result of fluctuations in nuclear fuel activity due to variations from year to year in the timing and pricing of fuel reload requirements, material and services deliveries, and the timing of cash payments during the nuclear fuel cycle and a decrease of $31.8 million in nuclear construction expenditures primarily due to higher spending in 2024 on Grand Gulf outage projects and upgrades.

Financing Activities

System Energy’s financing activities used $72.6 million of cash for the six months ended June 30, 2025 compared to providing $220.3 million of cash for the six months ended June 30, 2024 primarily due to the following activity:

  • the repayment, prior to maturity, of $200 million of 2.14% Series mortgage bonds in June 2025;
  • a capital contribution of $150 million received from Entergy Corporation in January 2024 in order to

System Energy Resources, Inc.

Management’s Financial Discussion and Analysis

maintain System Energy’s capital structure;

  • net repayments of $28.4 million in 2025 compared to net long-term borrowings of $82.6 million in 2024 on the nuclear fuel company variable interest entity’s credit facility;
  • $75 million in common stock dividends and distributions paid in 2025. No common stock dividends or distributions were paid in 2024 in anticipation of the settlements with the APSC, the LPSC, and the City Council; and
  • the issuance of $240 million of 5.30% Series mortgage bonds in May 2025.

Capital Structure

System Energy’s debt to capital ratio is shown in the following table.

Line itemJune 30, 2025December 31, 2024
Debt to capital53.7%52.9%
Effect of subtracting cash(0.7%)(0.7%)
Net debt to net capital (non-GAAP)53.0%52.2%

Net debt consists of debt less cash and cash equivalents. Debt consists of short-term borrowings and long-term debt, including the currently maturing portion. Capital consists of debt and common equity. Net capital consists of capital less cash and cash equivalents. System Energy uses the debt to capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating System Energy’s financial condition. The net debt to net capital ratio is a non-GAAP measure. System Energy uses the net debt to net capital ratio in analyzing its financial condition and believes it provides useful information to its investors and creditors in evaluating System Energy’s financial condition because net debt indicates System Energy’s outstanding debt position that could not be readily satisfied by cash and cash equivalents on hand.

Uses and Sources of Capital

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Liquidity and Capital Resources” in the Form 10-K for a discussion of System Energy’s uses and sources of capital. The following are updates to the information provided in the Form 10-K.

Recent announcements of changes to international trade policy and tariffs and further similar changes may impact System Energy’s business, operations, results of operations, and liquidity and capital resources. Potential impacts may include increases in costs associated with System Energy’s capital investments or operation and maintenance expenses; operational impacts, such as supply chain, manufacturing, or raw materials sourcing disruptions which may affect System Energy’s ability to make planned capital investments as and when expected and needed; legal uncertainties, such as potential legal or other challenges to presidential tariff authority; or broader economic risks, including shifting customer demand, impacts on customer investment decisions, and volatile or uncertain credit and capital markets, which may affect System Energy’s ability to access needed capital. The nature and extent of any such effects will depend on, among other things, the specifics of the changes that are ultimately implemented both domestically and internationally, the responses of vendors, suppliers, and other counterparties to those changes, indirect effects on the price and availability of non-tariffed goods, and the effectiveness of mitigation measures.

System Energy Resources, Inc.

Management’s Financial Discussion and Analysis

System Energy’s receivables from or (payables to) the money pool were as follows:

In Thousands

View SEC source
June 30, 2025December 31, 2024June 30, 2024December 31,2023
$8,661$2,851$5,238($12,246)

See Note 4 to the financial statements in the Form 10-K for a description of the money pool.

The System Energy nuclear fuel company variable interest entity has a credit facility in the amount of $120 million scheduled to expire in June 2027. As of June 30, 2025, $44.3 million in loans were outstanding under the System Energy nuclear fuel company variable interest entity credit facility. See Note 4 to the financial statements herein for additional discussion of the variable interest entity credit facility.

Federal Regulation

See the “Rate, Cost-recovery, and Other Regulation - Federal Regulation” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis in the Form 10-K and Note 2 to the financial statements herein and in the Form 10-K for a discussion of federal regulation.

Complaints Against System Energy

See Note 2 to the financial statements in the Form 10-K for information regarding pending complaints against System Energy and the settlements approved by the FERC that resolved all significant aspects of these complaints. The following are updates to that discussion.

Grand Gulf Sale-leaseback Renewal Complaint and Uncertain Tax Position Rate Base Issue

As discussed in the Form 10-K, in February 2023, System Energy submitted a tariff compliance filing with the FERC to clarify that, consistent with the releases provided in the June 2022 MPSC settlement, Entergy Mississippi would continue to be charged for its allocation of the sale-leaseback renewal costs under the Unit Power Sales Agreement. In March 2023 the MPSC filed a protest to System Energy’s tariff compliance filing. The MPSC argued that the settlement did not specifically address post-settlement sale-leaseback renewal costs and that the sale-leaseback renewal costs may not be recovered under the Unit Power Sales Agreement. In February 2025, System Energy and the MPSC resolved their dispute concerning the sale-leaseback renewal costs. As a result, the MPSC withdrew its protest at the FERC on System Energy’s tariff compliance filing. Entergy Mississippi will continue to pay the allocated sale-leaseback renewal costs of approximately $5.7 million annually and there are no refunds due for prior periods. In March 2025, System Energy filed a status report with the FERC explaining that the dispute is resolved. In April 2025 the FERC accepted System Energy’s tariff compliance filing.

System Energy Settlement with the LPSC

As discussed in the Form 10-K, in 2024, System Energy reached a settlement with the LPSC to globally resolve all of the LPSC’s actual and potential claims in multiple docketed proceedings pending before the FERC (including all docketed proceedings resolved by the MPSC, the APSC, and the City Council settlements) and associated with System Energy’s past implementation of the Unit Power Sales Agreement. In compliance with the settlement, in May 2025, System Energy, Entergy Louisiana, and Entergy Mississippi submitted the following filings with the FERC: (1) a Federal Power Act Section 203 application seeking approval for the permanent divestiture by Entergy Louisiana to Entergy Mississippi of its rights to capacity and energy from Grand Gulf; and (2) a Federal Power Act Section 205 application seeking approval to modify the entitlement percentages of the remaining purchasers under the Unit Power Sales Agreement in connection with the foregoing divestiture. In July 2025, the FERC issued an order accepting the Federal Power Act Section 205 application to remove Entergy

System Energy Resources, Inc.

Management’s Financial Discussion and Analysis

Louisiana as a party to the Unit Power Sales Agreement. As a result of the order, the Unit Power Sales Agreement entitlement percentages of the remaining purchasers will be permanently modified to exclude Entergy Louisiana, to be effective beginning October 2025. The FERC also issued an order dismissing the Federal Power Act Section 203 application based on lack of jurisdiction.

Nuclear Matters

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Nuclear Matters” in the Form 10-K for a discussion of nuclear matters.

Environmental Risks

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS – Environmental Risks” in the Form 10-K for a discussion of environmental risks.

Critical Accounting Estimates

See “MANAGEMENT’S FINANCIAL DISCUSSION AND ANALYSIS - Critical Accounting Estimates” in the Form 10-K for a discussion of the estimates and judgments necessary in System Energy’s accounting for nuclear decommissioning costs, utility regulatory accounting, taxation and uncertain tax positions, qualified pension and other postretirement benefits, and other contingencies.

New Accounting Pronouncements

See the “New Accounting Pronouncements” section of Note 1 to the financial statements in the Form 10-K for a discussion of new accounting pronouncements and the “New Accounting Pronouncements” section of Entergy Corporation and Subsidiaries Management’s Financial Discussion and Analysis herein for updates to the discussion of new accounting pronouncements.

  • (Unaudited)
  • (In Thousands)
  • (In Thousands)_

INCOME STATEMENTS

For the Three and Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands · In Thousands

View SEC source
Line itemThree Months Ended2025Three Months Ended2024Six Months Ended2025Six Months Ended2024
OPERATING REVENUES
Electric$143,858$145,934$285,669$298,554
OPERATING EXPENSES
Operation and Maintenance:
Fuel, fuel-related expenses, and gas purchased for resale16,12217,12030,93830,237
Nuclear refueling outage expenses4,1354,1368,22510,797
Other operation and maintenance47,01645,74690,49597,169
Decommissioning11,25710,81522,40121,522
Taxes other than income taxes6,5556,89213,35914,101
Depreciation and amortization31,06330,44361,82760,121
Other regulatory charges (credits) - net(2,473)27,188(2,380)22,215
TOTAL113,675142,340224,865256,162
OPERATING INCOME30,1833,59460,80442,392
OTHER INCOME
Allowance for equity funds used during construction1,8811,4513,4843,885
Interest and investment income10,67238,96723,11146,940
Miscellaneous - net56(165)29372
TOTAL12,60940,25326,88850,897
INTEREST EXPENSE
Interest expense17,27012,07233,29223,243
Allowance for borrowed funds used during construction(922)(594)(1,709)(1,453)
TOTAL16,34811,47831,58321,790
INCOME BEFORE INCOME TAXES26,44432,36956,10971,499
Income taxes5,1197,52111,39515,533
NET INCOME$21,325$24,848$44,714$55,966
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

STATEMENTS OF CASH FLOWS

For the Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
OPERATING ACTIVITIES
Net income$44,714$55,966
Adjustments to reconcile net income to net cash flow provided by operating activities:
Depreciation, amortization, and decommissioning, including nuclear fuel amortization111,023106,652
Deferred income taxes, investment tax credits, and non-current taxes accrued11,06328,258
Changes in assets and liabilities:
Receivables722(9,335)
Accounts payable(18,674)74,527
Taxes accrued(10,605)(19,301)
Interest accrued(99)(620)
Other working capital accounts344(27,233)
Other regulatory assets1,71621,178
Other regulatory liabilities52,405(115,256)
Pension and other postretirement funded status(6,875)(6,952)
Other assets and liabilities(54,233)(80,464)
Net cash flow provided by operating activities131,50127,420
INVESTING ACTIVITIES
Construction expenditures(51,746)(87,410)
Allowance for equity funds used during construction3,4843,885
Nuclear fuel purchases(26,957)(115,544)
Proceeds from sale of nuclear fuel43,55521
Decrease in other investments23
Proceeds from nuclear decommissioning trust fund sales369,739455,082
Investment in nuclear decommissioning trust funds(388,253)(467,485)
Changes in money pool receivable - net(5,810)(5,238)
Net cash flow used in investing activities(55,988)(216,666)
FINANCING ACTIVITIES
Proceeds from the issuance of long-term debt538,108544,736
Retirement of long-term debt(535,740)(462,226)
Capital contribution from parent150,000
Change in money pool payable - net(12,246)
Common stock dividends and distributions paid(75,000)
Net cash flow provided by (used in) financing activities(72,632)220,264
Net increase in cash and cash equivalents2,88131,018
Cash and cash equivalents at beginning of period28,90860
Cash and cash equivalents at end of period$31,789$31,078
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION:
Cash paid (received) during the period for:
Interest - net of amount capitalized$33,146$25,231
Income taxes$—($2,326)
Noncash investing activities:
Accrued construction expenditures$8,448$24,234
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

BALANCE SHEETS · ASSETS

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT ASSETS
Cash and cash equivalents:
Cash$46$448
Temporary cash investments31,74328,460
Total cash and cash equivalents31,78928,908
Accounts receivable:
Associated companies53,82348,134
Other4,8245,425
Total accounts receivable58,64753,559
Materials and supplies168,078163,814
Deferred nuclear refueling outage costs11,84419,884
Prepayments and other10,9295,768
TOTAL281,287271,933
OTHER PROPERTY AND INVESTMENTS
Decommissioning trust funds1,606,3041,529,059
TOTAL1,606,3041,529,059
UTILITY PLANT
Electric5,677,8565,668,253
Construction work in progress125,68585,127
Nuclear fuel157,883220,044
TOTAL UTILITY PLANT5,961,4245,973,424
Less - accumulated depreciation and amortization3,635,8273,578,709
UTILITY PLANT - NET2,325,5972,394,715
DEFERRED DEBITS AND OTHER ASSETS
Regulatory assets:
Other regulatory assets424,778426,494
Other22,77120,273
TOTAL447,549446,767
TOTAL ASSETS$4,660,737$4,642,474
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

BALANCE SHEETS · LIABILITIES AND EQUITY

June 30, 2025 and December 31, 2024 · Unaudited · In Thousands

View SEC source
Line item20252024
CURRENT LIABILITIES
Currently maturing long-term debt$112$200,090
Accounts payable:
Associated companies8,05518,477
Other24,89645,017
Taxes accrued5,24715,852
Interest accrued13,24313,342
Other4,4754,473
TOTAL56,028297,251
NON-CURRENT LIABILITIES
Accumulated deferred income taxes and taxes accrued467,250451,830
Accumulated deferred investment tax credits42,24442,984
Regulatory liability for income taxes - net102,570105,467
Other regulatory liabilities802,492747,190
Decommissioning1,150,1131,127,712
Pension and other postretirement liabilities4,0018,353
Long-term debt1,094,284889,646
Other22
TOTAL3,662,9563,373,184
Commitments and Contingencies
COMMON EQUITY
Common stock, no par value, authorized 1,000,000 shares; issued and outstanding 789,350 shares in 2025 and 2024908,944958,944
Retained earnings32,80913,095
TOTAL941,753972,039
TOTAL LIABILITIES AND EQUITY$4,660,737$4,642,474
See Notes to Financial Statements.
  • (Unaudited)
  • (In Thousands)_

STATEMENTS OF CHANGES IN COMMON EQUITY

For the Six Months Ended June 30, 2025 and 2024 · Unaudited · In Thousands

View SEC source
Line itemCommon StockRetained Earnings (Accumulated Deficit)Total
Balance at December 31, 2023$916,850($28,311)$888,539
Net income31,11831,118
Capital contribution from parent150,000150,000
Balance at March 31, 20241,066,8502,8071,069,657
Net income24,84824,848
Balance at June 30, 2024$1,066,850$27,655$1,094,505
Balance at December 31, 2024$958,944$13,095$972,039
Net income23,38923,389
Common stock dividends and distributions(20,000)(15,000)(35,000)
Balance at March 31, 2025938,94421,484960,428
Net income21,32521,325
Common stock dividends and distributions(30,000)(10,000)(40,000)
Balance at June 30, 2025$908,944$32,809$941,753
See Notes to Financial Statements.

ENTERGY CORPORATION AND SUBSIDIARIES

PART II. OTHER INFORMATION

Item 1. Legal Proceedings

See “PART I, Item 1, Litigation” in the Form 10-K for a discussion of legal, administrative, and other regulatory proceedings affecting Entergy. Also see Notes 1 and 2 to the financial statements herein and “Item 5, Other Information, Environmental Regulation” below for updates regarding environmental proceedings and regulation. The following is an update to that discussion.

Dorrell, et al. v. Constellation Energy, et al. Antitrust Class Action Litigation

On July 11, 2025, an antitrust class action lawsuit was filed in the United States District Court for the District of Maryland on behalf of a putative class against Entergy Corporation, 26 other entities alleged to own and/or operate commercial nuclear power plants in the United States (together with Entergy Corporation, the “nuclear defendants”), and two consulting companies. The class action complaint purports to be brought on behalf of all persons employed in nuclear power generation by the nuclear defendants and their subsidiaries and related entities in the United States from May 1, 2003 to the present. The plaintiffs primarily allege that the nuclear defendants, together with the consulting company defendants, violated Section 1 of the Sherman Act, 15 U.S. Code Chapter 1 by conspiring to suppress compensation and exchange collective bargaining agreement and wage information through a trade group, a consulting firm, and through direct communications, including attendance at conferences, from May 2003 to the present. The plaintiffs are seeking unspecified monetary damages, including treble damages, interest, injunctive relief, attorney’s fees, and costs. Entergy Corporation is evaluating the complaint.

Item 1A. Risk Factors

There have been no material changes to the risk factors discussed in "Part I, Item 1A. RISK FACTORS" in the Form 10-K.

Item 2. Unregistered Sales of Equity Securities and Use of Proceeds

Issuer Purchases of Equity Securities (1)

PeriodTotal Number of Shares PurchasedAverage Price Paidper ShareTotal Number of Shares Purchasedas Part of a Publicly Announced PlanMaximum $Amountof Shares that May Yet be Purchased Under a Plan (2)
4/01/2025-4/30/2025$—$350,052,918
5/01/2025-5/31/2025$—$350,052,918
6/01/2025-6/30/2025$—$350,052,918
Total$—

In accordance with Entergy’s stock-based compensation plans, Entergy periodically grants stock options to key employees, which may be exercised to obtain shares of Entergy’s common stock. According to the plans, these shares can be newly issued shares, treasury stock, or shares purchased on the open market. Entergy’s management has been authorized by the Board to repurchase on the open market shares up to an amount sufficient to fund the exercise of grants under the plans. In addition to this authority, the Board has authorized share repurchase programs to enable opportunistic purchases in response to market conditions. In October 2010 the Board granted authority for a $500 million share repurchase program. The amount of share repurchases under these programs may vary as a result of material changes in business results or capital spending or new investment opportunities. In addition, in the first quarter 2025, Entergy withheld 61,042 shares of its common stock at $78.79 per share, 1,300 shares of its

common stock at $81.31 per share, 213,368 shares of its common stock at $81.99 per share, 171,525 shares of its common stock at $82.52 per share, and 1,118 shares of its common stock at $82.82 per share to pay income taxes due upon vesting of restricted stock granted and payout of performance units as part of its long-term incentive program.

(1) See Note 12 to the financial statements in the Form 10-K for additional discussion of the stock-based compensation plans.

(2) Maximum amount of shares that may yet be repurchased relates only to the $500 million share repurchase program plan and does not include an estimate of the amount of shares that may be purchased to fund the exercise of grants under the stock-based compensation plans.

Item 5. Other Information

Rule 10b5-1 Trading Arrangements

No director or officer of Entergy or any of the Registrant Subsidiaries adopted, modified, or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement” during the three months ended June 30, 2025.

Regulation of the Nuclear Power Industry

The following are updates to the “Regulation of the Nuclear Power Industry” section of Part I, Item 1 of the Form 10-K.

Nuclear Waste Policy Act of 1982

Nuclear Plant Decommissioning

In March 2025 filings with the NRC were made that reported the decommissioning funding for all of Entergy’s subsidiaries’ nuclear plants. Those reports showed that decommissioning funding for each of the nuclear plants met the NRC’s financial assurance requirements.

NRC Reactor Oversight Process

The NRC’s Reactor Oversight Process is a program to collect information about plant performance, assess the information for its safety significance, and provide for appropriate licensee and NRC response. The NRC evaluates plant performance by analyzing two distinct inputs: inspection findings resulting from the NRC’s inspection program and performance indicators reported by the licensee. The evaluations result in the placement of each plant in one of the NRC’s Reactor Oversight Process Action Matrix columns: “licensee response column,” or Column 1, “regulatory response column,” or Column 2, “degraded cornerstone column,” or Column 3, “multiple/repetitive degraded cornerstone column,” or Column 4, and “unacceptable performance,” or Column 5. Plants in Column 1 are subject to normal NRC inspection activities. Plants in Column 2, Column 3, or Column 4 are subject to progressively increasing levels of inspection by the NRC with, in general, progressively increasing levels of associated costs. Continued plant operation is not permitted for plants in Column 5. All of the nuclear generating plants owned and operated by Entergy’s Utility business are currently in Column 1, except Waterford 3, which is in Column 2.

In June 2025 the NRC placed Waterford 3 in Column 2, effective second quarter 2025, based on the failure to properly develop and implement adequate maintenance instructions for the fuel linkage connection to the mechanical governor for an emergency diesel generator. Waterford 3 will remain in Column 2 until a supplemental inspection is satisfactorily completed.

Environmental Regulation

The following are updates to the “Environmental Regulation” section of Part I, Item 1 of the Form 10-K.

In March 2025 the EPA announced a series of deregulatory actions, including reconsideration of the particulate matter National Ambient Air Quality Standards (NAAQS), reconsideration of the Mercury and Air Toxics Standard (MATS) rule, reconsideration of greenhouse gas emissions rules, evaluation of whether to extend the compliance deadlines under the 2024 coal combustion residuals rule, and reconsideration of the effluent limitations guidelines. Entergy continues to monitor the EPA’s reconsideration efforts.

National Ambient Air Quality Standards

See the Form 10-K for discussion of the NAAQS set by the EPA in accordance with the Clean Air Act. The following are updates to that discussion.

Hazardous Air Pollutants

As discussed in the Form 10-K, the EPA released the final MATS rule in December 2011, which had a compliance date, with a widely granted one-year extension, of April 2016. The required controls have been installed and are operational at all affected Entergy units. In May 2024 the EPA issued a final rule revising portions of the MATS rule, including a reduction to the emission limit for filterable particulate matter. The revised standard will become effective July 2027 and could require additional capital investment and/or additional other operation and maintenance costs at Entergy’s coal-fired generating units. In March 2025, as part of its deregulatory agenda, the EPA announced that it was reconsidering the May 2024 MATS rule and that sources interested in a presidential exemption (two years, with additional exemptions available) should provide a recommendation to the EPA by March 31, 2025. Clean Air Act Section 112(i)(4) grants the President authority to issue an exemption if he determines that “the technology to implement such standard is not available and that it is in the national security interests of the United States to do so.” Entergy requested and received presidential exemptions for emissions of filterable particulate matter from Nelson Unit 6 and White Bluff Unit 1. The exemption lasts for a period of two years beyond the rule’s compliance date, i.e., from July 8, 2027 through July 8, 2029. Additionally, in June 2025, the EPA proposed to repeal certain aspects of the May 2024 MATS rule including the revised emission limit for filterable particulate matter for which the presidential exemption was granted. Comments on the proposed rule are due August 2025, and the EPA is expected to finalize the rule by the end of 2025.

Good Neighbor Plan/Cross-State Air Pollution Rule

As discussed in the Form 10-K, in June 2023 the EPA published its final Federal Implementation Plan (FIP), known as the Good Neighbor Plan, to address interstate transport for the 2015 ozone NAAQS which would increase the stringency of the Cross-State Air Pollution Rule (CSAPR) program in all four of the states where the Utility operating companies operate. The FIP would significantly reduce ozone season nitrogen oxides (NOx) emission allowance budgets and allocations for electric generating units. Prior to issuance of the FIP, in February 2023 the EPA issued related State Implementation Plan (SIP) disapprovals for many states, including the four states in which the Utility operating companies operate, and these SIP disapprovals are the subject of many legal challenges, including a petition for review filed by Entergy Louisiana challenging the disapproval of Louisiana’s SIP. Judicial stays of the SIP disapprovals were granted in all four states in which the Utility operating companies operate. In March 2025 the United States Fifth Circuit Court of Appeals concluded that the EPA properly disapproved Texas’s and Louisiana’s SIPs but found that the EPA’s disapproval was unreasonable for Mississippi’s SIP. The United States Eighth Circuit Court of Appeals has not issued a merits decision yet in the Arkansas SIP disapproval litigation. The FIP is also subject to numerous legal challenges in various federal circuit courts of appeals, and in June 2024 the United States Supreme Court issued an order, in challenges filed in the D.C. Circuit, staying enforcement of the FIP pending the D.C. Circuit’s review of the rule. Following the United States Supreme Court stay, the EPA also stayed the FIP. In March 2025 the EPA asked the D.C. Circuit for a voluntary remand to reconsider the FIP. In its declaration, the EPA states that it plans to reconsider, among other things, what states are

subject to the FIP. In April 2025 the D.C. Circuit held the cases in abeyance pending further order of the court. The EPA anticipates a new rule by fall 2026. Entergy is monitoring this litigation, any subsequent rulemaking, and assessing its compliance options in the event that the FIP becomes effective.

Greenhouse Gas Emissions

As discussed in the Form 10-K, in May 2024 the EPA finalized rules regulating greenhouse gas emissions from new combustion turbine electric generating units (EGUs) under Section 111(b) of the Clean Air Act and from certain existing coal- and gas-fired EGUs under Section 111(d) of the Clean Air Act. For new gas combustion turbine EGUs, the final rule includes three subcategories of emission standards based on the unit’s annual capacity factor. Base load (>40% annual capacity factor) EGUs are subject to a Phase 1 output-based CO2 efficiency standard followed by a more stringent Phase 2 CO2 standard which will apply beginning January 1, 2032. The Phase 2 standard was established based on an EPA determination that carbon capture and sequestration represents the best system of emission reduction for new base load combustion turbine EGUs.

In June 2025 the EPA released a rule proposing to repeal the May 2024 rule in its entirety, or alternatively, to repeal (1) the Phase 2 standard requiring carbon capture and sequestration for new combustion turbines because it is not an adequately demonstrated technology and (2) the standards for existing coal and gas units. Thus, under the proposed alternative proposal, the only standards that would remain are the Phase 1 standards for new gas combustion turbines. Comments on this proposed repeal are due August 2025, and the EPA is expected to finalize the rule by the end of 2025. Entergy continues to monitor the status of the EPA’s efforts to repeal the May 2024 rule.

Entergy continues to support national legislation that would most efficiently reduce economy-wide greenhouse gas emissions and increase planning certainty for electric utilities. By virtue of its proportionally large investment in low-emitting generation technologies, Entergy has a low overall carbon dioxide emission “intensity,” or rate of carbon dioxide emitted per megawatt-hour of electricity generated. In anticipation of the imposition of carbon dioxide emission limits on the electric industry, Entergy initiated actions designed to reduce its exposure to potential new governmental requirements related to carbon dioxide emissions. In 2019 Entergy announced a 2030 carbon dioxide emission rate goal focused on a 50% reduction from Entergy’s base year - 2000. In September 2020, Entergy announced a commitment to achieve net-zero greenhouse gas emissions by 2050 inclusive of all businesses, all applicable gases, and all emission scopes. In 2022, Entergy enhanced its commitment to include an interim goal of 50% carbon-free energy generating capacity by 2030 and expanded its interim emission rate goal to include all purchased power. Due to stronger than initially expected sales growth, likely necessitating the development of new generation capacity that is not carbon-free, and uncertainty with respect to the tax credits applicable to carbon-free generation, Entergy believes that (1) achievement of the carbon intensity goal may be delayed beyond 2030 and (2) achievement of the carbon-free energy generating capacity goal will not be achieved by 2030. As Entergy has communicated in various forums, its clean energy and carbon-reducing generation initiatives will be customer-led. Also, Entergy recognizes and has communicated that carbon capture and storage is a technology that Entergy is well positioned to deploy in the future. Entergy plans to pursue carbon capture and storage on new combined cycle generation when feasible and supported by customer demand. Carbon capture and storage, while offering the potential to meet customers’ long-term clean energy demands, is not carbon-free nor will it be deployed in the immediate term. See "Part I, Item 1A. RISK FACTORS" in the Form 10-K for discussion of the risks associated with achieving these climate goals. Entergy’s comprehensive, third party verified greenhouse gas inventory and progress against its voluntary goals are published on its website.

Item 6. Exhibits

*101 INS - Inline XBRL Instance Document - The instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document.

*101 SCH - Inline XBRL Schema Document.

*101 PRE - Inline XBRL Presentation Linkbase Document.

*101 LAB - Inline XBRL Label Linkbase Document.

*101 CAL - Inline XBRL Calculation Linkbase Document.

*101 DEF - Inline XBRL Definition Linkbase Document.

*104 - Cover Page Interactive Data File (formatted in Inline XBRL and contained in Exhibits 101).

Pursuant to Item 601(b)(4)(iii) of Regulation S-K, Entergy Corporation agrees to furnish to the Commission upon request any instrument with respect to long-term debt that is not registered or listed herein as an Exhibit because the total amount of securities authorized under such agreement does not exceed ten percent of the total assets of Entergy Corporation and its subsidiaries on a consolidated basis.

* Filed herewith.

** Furnished, not filed, herewith.

185