Revenue (Gross)
Breakdown
Segments
Precast Infrastructure And Engineered SystemsView metric
Water Transmission SystemsView metric
| Segment | Q2 '24 | Q3 '24 | Q4 '24 | Q1 '25 | Q2 '25 | Q3 '25 | Q4 '25 | Q1 '26 |
|---|---|---|---|---|---|---|---|---|
| Water Transmission Systems | — | — | — | — | $84.59M | $103.87M | $83.98M | $93.45M |
| Precast Infrastructure And Engineered Systems | $39.98M | $44.28M | $37.14M | $37.67M | $48.59M | $47.2M | $41.66M | $44.8M |
| Total | $129.51M | $130.2M | $119.63M | $116.12M | $133.18M | $151.07M | $125.64M | $138.25M |