Cost of Goods Sold
Breakdown
Segments
Water Transmission SystemsView metric
Precast Infrastructure And Engineered SystemsView metric
| Segment | Q1 '25 | Q2 '25 | Q3 '25 | Q4 '25 | Q1 '26 |
|---|---|---|---|---|---|
| Water Transmission Systems | — | $69.53M | $81.75M | $66.18M | $76.13M |
| Precast Infrastructure And Engineered Systems | $30.48M | $38.28M | $37.17M | $32.7M | $35.46M |
| Total | $96.75M | $107.82M | $118.92M | $98.88M | $111.59M |